4014 N ELDERBANK DR 90031

Certificate Information: 4014 N ELDERBANK DR 90031

Application / Permit
21010-10000-04498
Plan Check / Job No.
B21LA16304
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY SFD W/ BASEMENT (1067 SF) AND ATTACHED 2-CAR GARAGE (342 SF). BASEMENT WITH A RETAINING WALL AT 3 SIDES. 1 OF 3
Permit Issued
Issued on 9/12/2024
Issuing Office
Metro
Current Status
Issued on 9/12/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/31/2021 APPLICANT
Assigned to Plan Check Engineer 9/16/2021 CHUNG-WEN CHUANG
Corrections Issued 9/29/2021 CHUNG-WEN CHUANG
Quality Review Completed 10/13/2021 KEN GILL
Applicant returned to address corrections 1/12/2022 CHUNG-WEN CHUANG
Applicant returned to address corrections 3/11/2022 CHUNG-WEN CHUANG
Building Plans Picked Up 3/22/2022 APPLICANT
Applicant returned to address corrections 6/7/2022 CHUNG-WEN CHUANG
Applicant returned to address corrections 3/20/2023 CHUNG-WEN CHUANG
Applicant returned to address corrections 5/30/2023 CHUNG-WEN CHUANG
Applicant returned to address corrections 11/3/2023 CHUNG-WEN CHUANG
Applicant returned to address corrections 12/1/2023 CHUNG-WEN CHUANG
Applicant returned to address corrections 12/9/2023 CHUNG-WEN CHUANG
Plan Check Approved 12/21/2023 CHUNG-WEN CHUANG
Issued 9/12/2024 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 2/28/2022 STEVE MELGAR
Hydrant and Access approval Cleared 4/11/2022 LAURINDA MEADE
Trees in Parkway Cleared 6/11/2022 ADALBERTO VERA
Disturb/Remove Protected Trees Cleared 6/29/2022 ADALBERTO VERA
BHO/Hillside ordinance Cleared 8/31/2022 JEANETTE VONG
Sewer availability Cleared 9/1/2022 JEANETTE VONG
"D" conditions Cleared 1/30/2023 RUBEN VASQUEZ
"Q" conditions Cleared 1/30/2023 RUBEN VASQUEZ
Grading Pre-Inspection Cleared 1/30/2023 KIRK LINKLATER
Low Impact Development Cleared 2/7/2023 LUIS LUVANO
Roof/Waste drainage to street Cleared 2/8/2023 THAN WIN
Permit Cleared 2/28/2023 THAN WIN
Work Adjacent to Public Way Cleared 9/14/2023 LARRY LEE
GPI Written Notices Cleared 12/21/2023 CHUNG-WEN CHUANG

Contact Information

Contractor K & C Remodeling Inc; Lic. No.: 1081750-B 1287 MONTECITO DR      LOS ANGELES, CA 90031
Engineer Ha,, Seungil; Lic. No.: S4164 3454 W 1ST ST      LOS ANGELES, CA 90004
Engineer Jahani,, Fereidoun; Lic. No.: C62875 3720 BLANCHE ST      PASADENA, CA 91107
Geologist Minas,, Shant; Lic. No.: EG2607 566 RIVERDALE DRIVE      GLENDALE, CA 91204

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/9/2024 Partial Inspection LILIANA PORTILLO
Piling/Pier/Caisson 12/19/2024 Corrections Issued LILIANA PORTILLO
Piling/Pier/Caisson 12/23/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
Piling/Pier/Caisson 12/30/2024 Corrections Issued BRENDAN MORELLI
Deputy Reinf. Concrete 12/31/2024 Conditional Approval BRENDAN MORELLI
Deputy Reinf. Concrete 1/15/2025 No Access for Inspection LILIANA PORTILLO
Piling/Pier/Caisson 1/16/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
Deputy Reinf. Concrete 1/17/2025 Conditional Approval LILIANA PORTILLO
Piling/Pier/Caisson 1/17/2025 Partial Approval ALIZAH MAYAGOITIA
Deputy Reinf. Concrete 4/2/2025 Conditional Approval LILIANA PORTILLO
Piling/Pier/Caisson 4/11/2025 Corrections Issued LILIANA PORTILLO
Deputy Reinf. Concrete 5/6/2025 Conditional Approval LILIANA PORTILLO
Special/Order Compliance 5/15/2025 Partial Inspection LILIANA PORTILLO
Deputy Reinf. Concrete 5/20/2025 No Access for Inspection LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 5/22/2025 Corrections Issued LILIANA PORTILLO
Deputy Reinf. Concrete 5/23/2025 Conditional Approval LILIANA PORTILLO
Deputy Reinf. Concrete 6/11/2025 Conditional Approval LILIANA PORTILLO
Footing/Foundation/Slab 6/12/2025 Not Ready for Inspection LILIANA PORTILLO
Grading Pre-Inspection 6/12/2025 Not Ready for Inspection LILIANA PORTILLO
Piling/Pier/Caisson 6/20/2025 Partial Approval DAVID WILLIAMS
Deputy Steel/Welding 6/24/2025 Conditional Approval LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 6/27/2025 Partial Approval LILIANA PORTILLO
Footing/Foundation/Slab 6/27/2025 Partial Approval LILIANA PORTILLO
Deputy Shotcrete 7/3/2025 Conditional Approval REGINA MENDEZ
Deputy Other (see comments) 7/11/2025 Conditional Approval LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 7/14/2025 Partial Approval LILIANA PORTILLO
Reinforced Concrete Frame 7/14/2025 Approved LILIANA PORTILLO
Deputy Reinf. Concrete 7/24/2025 Conditional Approval ALIZAH MAYAGOITIA
Underground Mechanical 7/25/2025 Partial Approval BRENDAN MORELLI
Footing/Foundation/Slab 7/30/2025 Partial Approval ALIZAH MAYAGOITIA
Deputy Reinf. Concrete 7/31/2025 Conditional Approval LILIANA PORTILLO
Deputy Drilled-In Anchors 8/20/2025 Conditional Approval REGINA MENDEZ
Deputy Drilled-In Anchors 9/3/2025 Conditional Approval LILIANA PORTILLO
Deputy Steel/Welding 9/10/2025 Conditional Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 9/26/2025 Partial Approval LILIANA PORTILLO
Structural Steel Frame 9/26/2025 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 10/20/2025 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 12/17/2025 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 1/13/2026 Partial Approval LILIANA PORTILLO
ELECTRICAL-Rough 2/11/2026 Not Ready for Inspection LILIANA PORTILLO
HVAC-Rough 2/11/2026 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Rough 2/11/2026 Not Ready for Inspection LILIANA PORTILLO
BUILDING-Rough-Frame 2/12/2026 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Rough 2/12/2026 Corrections Issued LILIANA PORTILLO
HVAC-Rough 2/12/2026 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 2/12/2026 Corrections Issued LILIANA PORTILLO
Verify Sprinkler Sign Off 2/12/2026 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Rough 2/24/2026 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 2/24/2026 Approved LILIANA PORTILLO
HVAC-Rough 2/24/2026 Approved LILIANA PORTILLO
PLUMBING-Rough 2/24/2026 Approved LILIANA PORTILLO
Special/Order Compliance 2/24/2026 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 4/16/2026 Approved LILIANA PORTILLO
Interior/Exterior Lathing 4/16/2026 Partial Approval LILIANA PORTILLO
Shower Pan 4/16/2026 Approved LILIANA PORTILLO
Verify Sprinkler Sign Off 4/16/2026 Approved LILIANA PORTILLO
Insulation 5/1/2026 Approved LILIANA PORTILLO
Interior/Exterior Lathing 5/1/2026 Approved LILIANA PORTILLO
Drywall Nailing 5/12/2026 Approved ALEX COLIN
Green Building Rough 5/12/2026 Approved ALEX COLIN