Excavation/Setback/Form/Re-Bar
|
8/27/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/30/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/30/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/30/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Green Building Rough
|
9/6/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/6/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/12/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/12/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/19/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/19/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/13/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Methane Barrier
|
11/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
11/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
11/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/30/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/5/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/4/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/4/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/4/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
1/6/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
2/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
2/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
2/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
2/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
2/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
2/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Masonry Wall/Backfill
|
2/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
3/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
3/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
3/8/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/8/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
3/8/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
3/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/7/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
4/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
4/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
4/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/21/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
4/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
5/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
5/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
5/31/2023
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
6/8/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/8/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/22/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Deputy Wood Construction
|
6/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/23/2023
|
Approved
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
7/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
7/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
7/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
7/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
7/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
7/28/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
8/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
8/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
8/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
9/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/22/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/26/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/27/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
10/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
10/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
10/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
10/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
10/26/2023
|
Approved
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Insulation
|
10/30/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/31/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
11/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
11/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/18/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/31/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/23/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
2/23/2024
|
Conditional Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
3/1/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
3/28/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/1/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
4/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/19/2024
|
Approved
|
JAMES POWERS
|
|
Special/Order Compliance
|
7/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
10/1/2024
|
Approved
|
JAMES POWERS
|
|
Final
|
10/1/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/1/2024
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
10/1/2024
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/1/2024
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
10/1/2024
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
10/1/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/1/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
10/1/2024
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
11/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
11/7/2024
|
OK for TCO
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/7/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/7/2024
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
11/7/2024
|
Approved
|
JAMES POWERS
|
|
Final
|
3/6/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
5/20/2025
|
Approved
|
JAMES POWERS
|
|
Final
|
5/21/2025
|
OK to Issue CofO
|
JAMES POWERS
|