8070 W BEVERLY BLVD 90048

Certificate Information: 8070 W BEVERLY BLVD 90048

Application / Permit
21010-10000-04431
Plan Check / Job No.
B21LA16097
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(23) Other-See Work Description
Work Description
New 7 Story Type IA Mixed Use Eldercare Facility comprised of 80 Assisted/Independent Dwelling Units & 20 Memory Care Guest Rooms including a Synagogue and Medical Office per ZA-2016-2878-ELD-SPR over 2 Basement Type IA levels of Parking. Core and Shell Only for Medical Office and Synagogue.
Permit Issued
Issued on 1/6/2023
Issuing Office
Metro
Current Status
CofO Issued on 2/17/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/31/2021 APPLICANT
Assigned to Plan Check Engineer 9/16/2021 KEVIN MORALES
Corrections Issued 9/22/2021 KEVIN MORALES
Quality Review Completed 9/23/2021 EUGENE BARBEAU
Building Plans Picked Up 10/6/2021 APPLICANT
Applicant returned to address corrections 1/3/2023 KEVIN MORALES
Plan Check Approved 1/6/2023 KEVIN MORALES
Issued 1/6/2023 APPLICANT
CofO in Progress 2/17/2026 MARTIN TAVITIAN
Permit Finaled 2/17/2026 ERNESTO CORRAL
CofO Issued 2/17/2026 ERNESTO CORRAL
Permit Finaled 2/17/2026 ERNESTO CORRAL

Permit Application Clearance Information

Driveway location Cleared 3/14/2022 MOHAMMAD HASAN
Internal circulation Cleared 3/14/2022 MOHAMMAD HASAN
Trees in Parkway Cleared 4/28/2022 ADALBERTO VERA
Eng Process Fee Ord 176,300 Cleared 5/2/2022 JEANETTE VONG
Sewer availability Cleared 5/2/2022 JEANETTE VONG
Construction near power lines Cleared 5/16/2022 WALTER RAMIREZ
Construction within easement Cleared 5/16/2022 WALTER RAMIREZ
Building over 3-story or 36-ft Cleared 5/17/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 5/17/2022 CALOSHA APPROVED
Green Code Cleared 6/17/2022 AARON COSTA
Hydrant and Access approval Cleared 6/30/2022 JOHN CONNEALLY
Food establishment approval Cleared 7/14/2022 LACDHS APPROVED
Highway dedication Cleared 7/15/2022 JEANETTE VONG
Bicycle Parking Cleared 7/25/2022 JEREMY CHOK
Encroachment in public way Cleared 7/25/2022 JEREMY CHOK
Address approval Cleared 7/28/2022 CINDY QI
Fire Marshall Fire Life Safety Cleared 9/21/2022 MENOA AGHAJANI
Permit Cleared 10/3/2022 BIJAN ZADEH
Work Adjacent to Public Way Cleared 10/5/2022 JOSE RODRIGUEZ
DAS Clearance Cleared 10/27/2022 KEVIN MORALES
Low Impact Development Cleared 11/23/2022 ORVAL HERNANDEZ-MARCI
"Q" conditions Cleared 12/16/2022 DALIA MOKAYED
Comm Cor/Mini-Mall Cleared 12/16/2022 DALIA MOKAYED
Comm Cor/Mini-Mall Cleared 12/16/2022 DALIA MOKAYED
Miscellaneous Cleared 12/16/2022 DALIA MOKAYED
Miscellaneous Cleared 12/16/2022 DALIA MOKAYED
Opn space landscape/Water mgmt Cleared 12/16/2022 DALIA MOKAYED
Site Plan review Cleared 12/16/2022 DALIA MOKAYED
Tract Map conditions Cleared 12/16/2022 DALIA MOKAYED
ZA Case Cleared 12/16/2022 DALIA MOKAYED
Sewer availability Cleared 1/4/2023 JEANETTE VONG
Roof/Waste drainage to street Cleared 1/5/2023 THAN WIN
Roof/Waste drainage to street Cleared 1/5/2023 THAN WIN

Contact Information

Architect Banvard,, Navy Francis; Lic. No.: C18051 1738 BERKELEY STREET      SANTA MONICA, CA 90404
Contractor Kprs Construction Services Inc; Lic. No.: 751130-B 2850 SATURN STREET      BREA, CA 92821
Engineer Mehta,, Manish Jitendra; Lic. No.: C54381 16600 SHERMAN WAY STE 180      VAN NUYS, CA 91406
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 4/3/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 4/20/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/12/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/15/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/15/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 5/15/2023 Approved EDWIN GREGORYONA
METHANE-Subgrade 5/15/2023 Approved EDWIN GREGORYONA
Deputy Methane Barrier 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 5/22/2023 Partial Approval EDWIN GREGORYONA
METHANE-Rough 5/23/2023 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/2/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/2/2023 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 6/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/9/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 6/9/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 6/9/2023 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 6/9/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/9/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 6/12/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 6/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/13/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 6/13/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 6/13/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/13/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 6/14/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 6/14/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/16/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/23/2023 Partial Approval GREGORY POMISH
Green Building Rough 6/23/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 6/23/2023 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 6/23/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 6/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 6/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/30/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/30/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 6/30/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 7/7/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 7/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 7/11/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/11/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 7/11/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 7/11/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 7/14/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/18/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 7/18/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 7/18/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Methane Barrier 7/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 7/21/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/21/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 7/21/2023 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/24/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 7/24/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 7/27/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/27/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 7/27/2023 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 7/28/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/2/2023 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 8/9/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/10/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Other (see comments) 8/11/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/17/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Pre-Stress Concrete 8/29/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 8/30/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 8/31/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 9/1/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/1/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/1/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 9/1/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/1/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 9/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 9/11/2023 Conditional Approval GREGORY POMISH
Green Building Rough 9/13/2023 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 9/13/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/13/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/18/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/18/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 9/18/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 9/18/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 9/19/2023 Partial Approval LARRY ARNICK
Deputy Shotcrete 9/19/2023 Corrections Issued LARRY ARNICK
Deputy Shotcrete 9/19/2023 Partial Approval EDWIN GREGORYONA
Wall Anchors 9/19/2023 Corrections Issued LARRY ARNICK
Deputy Reinf. Concrete 9/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/20/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/21/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/21/2023 Off-Hour Fees Due
Reinforced Concrete Frame 9/21/2023 Off-Hour Fees Due
Verify Sprinkler Sign Off 9/21/2023 Off-Hour Fees Due
Deputy Reinf. Concrete 9/22/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/22/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/25/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 9/25/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/25/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 9/26/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/29/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/4/2023 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 10/4/2023 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 10/4/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/4/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/6/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/6/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 10/10/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/11/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/17/2023 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 10/17/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/17/2023 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 10/18/2023 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 10/18/2023 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 10/24/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/26/2023 Partial Inspection EDWIN GREGORYONA
Green Building Rough 10/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 10/26/2023 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 10/26/2023 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 10/26/2023 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 10/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 10/27/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 11/2/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/2/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/2/2023 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 11/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 11/7/2023 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 11/7/2023 Partial Approval EDWIN GREGORYONA
Pre-Inspection 11/7/2023 Approved EDWIN GREGORYONA
Green Building Rough 11/15/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/15/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/15/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 11/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 11/25/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/25/2023 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/25/2023 Not Ready for Inspection RAFAEL ESPINOZA
Structural Steel Frame 11/28/2023 Conditional Approval RAFAEL ESPINOZA
Special/Order Compliance 11/29/2023 Partial Inspection GREGORY POMISH
Green Building Rough 12/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 12/6/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/8/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/8/2023 Partial Approval EDWIN GREGORYONA
Pre-Inspection 12/8/2023 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 12/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 12/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/14/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 12/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/18/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 12/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/21/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 1/5/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/11/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/11/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 1/13/2024 Off-Hour Fees Due
Footing/Foundation/Slab 1/15/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 1/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 1/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 2/15/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/15/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/15/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 2/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/21/2024 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 2/23/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/23/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/23/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 2/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 2/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 3/11/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/11/2024 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 3/15/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/19/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/19/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/19/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/19/2024 Partial Inspection EDWIN GREGORYONA
Green Building Rough 3/27/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/27/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/27/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/28/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/5/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/5/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/5/2024 Partial Inspection EDWIN GREGORYONA
Green Building Rough 4/19/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/19/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/19/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Pre-Stress Concrete 4/23/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/23/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/30/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/30/2024 Partial Inspection EDWIN GREGORYONA
Deputy Pre-Stress Concrete 5/2/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/2/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/2/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/2/2024 Partial Inspection EDWIN GREGORYONA
Green Building Rough 5/8/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/8/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/8/2024 Partial Inspection EDWIN GREGORYONA
Deputy Pre-Stress Concrete 6/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/12/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/12/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Pre-Stress Concrete 6/13/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/13/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/13/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 6/13/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 6/13/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/13/2024 Partial Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/17/2024 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 6/18/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/21/2024 Partial Approval MARTIN TAVITIAN
Green Building Rough 6/21/2024 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 6/21/2024 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 6/21/2024 Partial Approval MARTIN TAVITIAN
Piling/Pier/Caisson 6/26/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Methane Barrier 6/27/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 6/27/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/27/2024 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 7/1/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/10/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/17/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/26/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 7/26/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 7/29/2024 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 7/29/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 7/31/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/31/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/6/2024 Partial Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/7/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/13/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/14/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/14/2024 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 8/29/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 8/29/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Steel/Welding 9/3/2024 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 9/3/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/6/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/6/2024 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 9/12/2024 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/12/2024 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/20/2024 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 9/20/2024 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 10/2/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/8/2024 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 10/8/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Steel/Welding 10/10/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/10/2024 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/11/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/15/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/15/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/17/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/17/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/21/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/21/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/21/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/29/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/30/2024 Approved CHRISTOPHER BLACKWOOD
Deputy Steel/Welding 11/1/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/1/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/20/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/21/2024 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 11/22/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/4/2024 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 12/5/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 12/9/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/18/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 12/19/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/7/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/7/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/9/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/9/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 1/13/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/13/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/14/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/17/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/21/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/22/2025 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 1/22/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/23/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/24/2025 No Access for Inspection RAFAEL CORTES
Drywall Nailing 1/27/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/28/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 1/29/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/31/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/31/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/4/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 2/4/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/5/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/5/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/10/2025 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 2/10/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 2/11/2025 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 2/11/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/12/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/18/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/18/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/21/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/21/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/25/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/25/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/28/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 3/4/2025 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 3/4/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/7/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/7/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/11/2025 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 3/11/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 3/14/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/18/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/20/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/27/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/27/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/28/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/28/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/1/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/3/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/10/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/10/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/10/2025 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 5/15/2025 Not Ready for Inspection EDWIN GREGORYONA
T-Bar Ceiling 5/22/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 5/30/2025 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/30/2025 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 5/30/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/5/2025 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 6/5/2025 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 6/13/2025 Not Ready for Inspection EDWIN GREGORYONA
T-Bar Ceiling 6/24/2025 Not Ready for Inspection EDWIN GREGORYONA
T-Bar Ceiling 6/27/2025 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 7/24/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/8/2025 Partial Approval MARTIN TAVITIAN
Final 8/25/2025 Not Ready for Inspection MARTIN TAVITIAN
Footing/Foundation/Slab 8/25/2025 Not Ready for Inspection MARTIN TAVITIAN
Green Building Final 8/25/2025 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 8/25/2025 Not Ready for Inspection MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 8/25/2025 SGSOV Not Ready MARTIN TAVITIAN
Smoke Detectors 8/25/2025 Not Ready for Inspection MARTIN TAVITIAN
Verify Sprinkler Sign Off 8/25/2025 Not Ready for Inspection MARTIN TAVITIAN
Footing/Foundation/Slab 9/5/2025 Partial Approval MARTIN TAVITIAN
Final 1/22/2026 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 1/22/2026 Approved EDWIN GREGORYONA
Green Building Final 1/22/2026 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/22/2026 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 1/22/2026 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 1/22/2026 Approved EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/22/2026 Approved EDWIN GREGORYONA
Final 2/3/2026 Partial Inspection MARTIN TAVITIAN
Green Building Final 2/3/2026 Approved MARTIN TAVITIAN
Special/Order Compliance 2/4/2026 Approved MARTIN TAVITIAN
Pre-Inspection 2/12/2026 Approved MARTIN TAVITIAN
Final 2/17/2026 OK to Issue CofO MARTIN TAVITIAN