Pre-Inspection
|
3/5/2024
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/19/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/22/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/26/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/2/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/6/2024
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Reinf. Concrete
|
5/7/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/7/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/8/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/9/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/10/2024
|
Approved
|
NICK LAROCCA
|
|
Green Building Rough
|
5/16/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
5/16/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Verify Sprinkler Sign Off
|
5/16/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Grading
|
6/6/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/28/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/1/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
7/1/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/3/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
7/8/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/10/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/17/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/17/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
7/17/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/18/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/19/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/22/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/23/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/24/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/25/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
7/25/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Special/Order Compliance
|
7/25/2024
|
Partial Inspection
|
GRANT WOODS
|
|
Green Building Rough
|
7/26/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
7/26/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Verify Sprinkler Sign Off
|
7/26/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/29/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/30/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/31/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/1/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/2/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Green Building Rough
|
8/2/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
8/2/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Verify Sprinkler Sign Off
|
8/2/2024
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/5/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/5/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/5/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/7/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/7/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/12/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/26/2024
|
Conditional Approval
|
FARHAD DADBIN
|
|
Footing/Foundation/Slab
|
8/27/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
9/5/2024
|
Conditional Approval
|
FARHAD DADBIN
|
|
Footing/Foundation/Slab
|
9/6/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/20/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
9/20/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Masonry Wall/Backfill
|
9/20/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Green Building Rough
|
9/30/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
9/30/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
9/30/2024
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
10/2/2024
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
10/23/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Special/Order Compliance
|
11/14/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
11/20/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/20/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/21/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/25/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/12/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/23/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
12/24/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
12/30/2024
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
1/3/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
1/10/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/10/2025
|
Approved
|
DANIEL VARNUM
|
|
Deputy Pre-Stress Concrete
|
1/21/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
1/23/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
1/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Wood Construction
|
1/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/24/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Pre-Stress Concrete
|
1/27/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Pre-Stress Concrete
|
1/28/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
1/29/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
1/30/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
1/31/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
2/3/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/3/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Fireproofing
|
2/4/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Fireproofing
|
2/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
2/21/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
2/21/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
2/24/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/24/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/25/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/26/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/27/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
3/21/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
3/21/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
3/25/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Wood Construction
|
4/14/2025
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
4/14/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
4/17/2025
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
4/25/2025
|
Corrections Issued
|
DANIEL VARNUM
|
|
Wood Frame
|
5/9/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
5/13/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Special/Order Compliance
|
5/20/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
6/4/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/9/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/12/2025
|
Partial Approval
|
NICK LAROCCA
|
|
Pre-Inspection
|
6/16/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Wood Frame
|
6/18/2025
|
Partial Inspection
|
VASIL MIHALEV
|
|
Pre-Inspection
|
7/11/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
7/14/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2025
|
Not Ready for Inspection
|
DAVID TSAU
|
|
Wood Frame
|
7/15/2025
|
Not Ready for Inspection
|
DAVID TSAU
|
|
Deputy Wood Construction
|
7/17/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
7/18/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/21/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
7/24/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
7/29/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Wood Construction
|
7/30/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Insulation
|
8/1/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
8/4/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
8/5/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
8/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
8/11/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
8/18/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/22/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
8/22/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
8/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
9/3/2025
|
Corrections Issued
|
DERRICK SPENCER
|
|
Insulation
|
9/9/2025
|
Partial Approval
|
VASIL MIHALEV
|
|
Drywall Nailing
|
9/10/2025
|
Approved
|
VASIL MIHALEV
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
9/18/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
9/22/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
9/22/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/2/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
10/9/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/14/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
10/14/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Insulation
|
10/16/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
10/20/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
10/24/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
10/30/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
11/3/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
11/5/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
11/5/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
11/7/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
11/10/2025
|
Not Ready for Inspection
|
VASIL MIHALEV
|
|
Insulation
|
12/1/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
12/5/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
12/12/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
12/23/2025
|
Approved
|
VASIL MIHALEV
|
|
Interior/Exterior Lathing
|
1/9/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
1/14/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
1/22/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
1/22/2026
|
Approved
|
ROGELIO REYNA
|
|
Drywall Nailing
|
1/26/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
1/28/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
2/6/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
2/18/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
2/18/2026
|
Approved
|
DANIEL ARMENTA
|
|
Drywall Nailing
|
2/27/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
3/4/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
3/16/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
4/1/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
4/27/2026
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
5/4/2026
|
Approved
|
PAUL DAVIDSON
|
|
Green Building Final
|
5/4/2026
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Green Building Rough
|
5/4/2026
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
5/4/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Reinforced Masonry Frame
|
5/4/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
SGSOV-Seismic Gas S/O Valve
|
5/4/2026
|
SGSOV Not Ready
|
PAUL DAVIDSON
|
|
Smoke Detectors
|
5/4/2026
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
5/4/2026
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Light Gage Steel Frame
|
5/20/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
5/27/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
6/8/2026
|
Approved
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
6/15/2026
|
Not Ready for Inspection
|
DANIEL VARNUM
|