1919 W COURT ST 90026

Certificate Information: 1919 W COURT ST 90026

Application / Permit
21010-10000-03976
Plan Check / Job No.
B21LA14515
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 4-story, 46-unit, 100% affordable housing apartment with 4 stories of Type VA apartments, over 1-level subterranean basement parking of Type IA per 12.22.A.25, additional incentives per 14.00.A.2 and CPC-2007-5307-ZC-ZV-PUB-ZAA-SPR.
Permit Issued
Issued on 4/6/2022
Issuing Office
Metro
Current Status
Issued on 4/6/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 4/6/2022 RODOLFO ARIAS
Issued 4/6/2022 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/8/2021 CECILIO NAVARRO
Address approval Cleared 10/14/2021 CECILIO NAVARRO
Construction near power lines Cleared 11/30/2021 RIDWAN HARDY
Highway dedication Cleared 12/7/2021 TERRY PHAN
Driveway location Cleared 1/6/2022 KEVIN ARUCAN
Sewer availability Cleared 1/12/2022 JEANIE LAM
CPC Cleared 1/25/2022 LOUIS ORTEGA
Frnt yard landscape/Water mgmt Cleared 1/25/2022 LOUIS ORTEGA
Landscape for retaining wall Cleared 1/25/2022 LOUIS ORTEGA
Miscellaneous Cleared 1/25/2022 LOUIS ORTEGA
Miscellaneous Cleared 1/25/2022 LOUIS ORTEGA
Opn space landscape/Water mgmt Cleared 1/25/2022 LOUIS ORTEGA
ZA Case Cleared 1/25/2022 LOUIS ORTEGA
ZA Case Cleared 1/25/2022 LOUIS ORTEGA
ZA Case Cleared 1/25/2022 LOUIS ORTEGA
ZA Case Cleared 1/25/2022 LOUIS ORTEGA
Trees in Parkway Cleared 2/1/2022 ADALBERTO VERA
Low Impact Development Cleared 2/15/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 2/16/2022 JEANETTE VONG
Bicycle Parking Cleared 2/17/2022 JEREMY CHOK
Hydrant and Access approval Cleared 3/7/2022 KURT CORRAL
Fire Marshal Fire Life Safety Cleared 3/10/2022 VIDAL GARCIA
Miscellaneous Cleared 3/10/2022 MARITZA PRZEKOP
Miscellaneous Cleared 3/10/2022 MARITZA PRZEKOP
DCP conditions approval Cleared 3/15/2022 DORIS KWOK
Density Bonus 12.22.A.25 Cleared 3/15/2022 DORIS KWOK
Permit Cleared 3/18/2022 ARMEN MEHRABIAN
Building over 36-ft Cleared 3/25/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/25/2022 CALOSHA APPROVED
GPI Written Notices Cleared 3/25/2022 RODOLFO ARIAS
Grading Pre-Inspection Cleared 3/25/2022 RODOLFO ARIAS
Green Code Cleared 3/25/2022 AARON COSTA
Public Housing Cleared 3/29/2022 LUIS ALVAREZ
Work Adjacent to Public Way Cleared 3/31/2022 JOSE RODRIGUEZ
DAS Clearance Cleared 4/1/2022 RODOLFO ARIAS
Miscellaneous Cleared 4/4/2022 ALBERT TAM

Contact Information

Architect Maffris,, Kevin M; Lic. No.: C33104 724 S SPRING STREET # 304      LOS ANGELES, CA 90014
Contractor Westport Construction Inc; Lic. No.: 712732-B 125 W MAPLE AVE      MONROVIA, CA 91016
Engineer Adams,, Jelisa Thomas; Lic. No.: GE3092 26632 EL TOBOSO      MISSION VIEJO, CA 92691
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804
Engineer Krief,, Dan Dov; Lic. No.: C76041 6420 WILSHIRE BLVD STE 1000      LOS ANGELES, CA 90048
Geologist Kasman,, Gerald Alan; Lic. No.: EG2251 29072 GLADIOLUS DR      CANYON COUNTRY, CA 91387

Inspector Information

GREGORY POMISH, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI
NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Deputy Reinf. Concrete 12/5/2022   
Deputy Reinf. Concrete 12/6/2022   
Deputy Reinf. Concrete 12/7/2022   
Deputy Reinf. Concrete 12/8/2022   
Deputy Reinf. Concrete 12/9/2022   

Inspection Request History

Footing/Foundation/Slab 7/7/2022 Partial Approval NICK DANERI
METHANE-Barrier 7/7/2022 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 7/7/2022 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 7/15/2022 Corrections Issued RAFAEL ESPINOZA
METHANE-Barrier 7/15/2022 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 7/15/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/25/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 7/26/2022 Partial Approval NICK DANERI
METHANE-Barrier 7/26/2022 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 7/26/2022 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 8/2/2022 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/3/2022 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/4/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/4/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/5/2022 Conditional Approval NICK DANERI
Pre-Inspection 8/5/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/10/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/10/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/11/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/11/2022 Partial Approval NICK DANERI
METHANE-Barrier 8/11/2022 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 8/11/2022 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/15/2022 Partial Approval GREGORY POMISH
Green Building Rough 8/15/2022 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 8/15/2022 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 8/15/2022 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 8/15/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/16/2022 Conditional Approval NICK DANERI
Piling/Pier/Caisson 8/16/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/22/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/25/2022 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/25/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 8/26/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/26/2022 Partial Approval NICK DANERI
METHANE-Barrier 8/26/2022 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 8/26/2022 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 8/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/30/2022 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/30/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 9/2/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/2/2022 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 9/2/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/6/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/6/2022 Conditional Approval TED RIES
Masonry Wall/Backfill 9/7/2022 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 9/9/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 9/9/2022 Conditional Approval NICK DANERI
Green Building Rough 9/9/2022 Not Ready for Inspection NICK DANERI
METHANE-Rough 9/9/2022 Partial Inspection NICK DANERI
Reinforced Masonry Frame 9/9/2022 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 9/9/2022 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 10/5/2022 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/27/2022 Partial Approval JAMES POWERS
METHANE-Barrier 10/27/2022 Approved JAMES POWERS
METHANE-Subgrade 10/27/2022 Approved JAMES POWERS
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 11/4/2022 Partial Inspection RAFAEL ESPINOZA
METHANE-Rough 11/10/2022 Not Ready for Inspection NICK DANERI
Deputy Methane Barrier 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 11/15/2022 Conditional Approval MICHAEL ROSENBERG
METHANE-Rough 11/16/2022 Not Ready for Inspection GREGORY POMISH
Deputy Methane Barrier 11/22/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/23/2022 Conditional Approval NICK DANERI
Deputy Methane Barrier 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/5/2022 Conditional Approval ERNESTO CORRAL