1441 W 3RD ST 90017

Certificate Information: 1441 W 3RD ST 90017

Application / Permit
21010-10000-03854
Plan Check / Job No.
B21LA14082
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 8-story, 104-unit, 100% affordable housing apartment with 5 levels of Type IIIA apartments, over 2 levels of Type IA apartments, over 1 level of Type IA ground floor parking and residential amenities including supportive services over 1 level Type IA basement storage utilizing QPSH (14.00.A.13) and AB 2162.
Permit Issued
Issued on 4/28/2023
Issuing Office
Metro
Current Status
Issued on 4/28/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 4/28/2023 KEVIN MORALES
Issued 4/28/2023 APPLICANT
TCO Issued (Expire Date: 06-29-2026) 12/31/2025 JOEY BUCHANAN

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/21/2022 CELINA MORENO
Address approval Cleared 9/29/2022 CELINA MORENO
Driveway location Cleared 12/22/2022 TAIMOUR TANAVOLI
Frnt yard landscape/Water mgmt Cleared 1/25/2023 DANIEL CORONADO
Miscellaneous Cleared 1/25/2023 DANIEL CORONADO
ZA Case Cleared 1/25/2023 DANIEL CORONADO
Trees in Parkway Cleared 2/2/2023 RICHARD SANCHEZ
Permit Cleared 2/3/2023 CELINA MORENO
Hydrant and Access approval Cleared 2/8/2023 KURT CORRAL
Green Code Cleared 2/15/2023 RODOLFO ARIAS
Bicycle Parking Cleared 2/23/2023 KATHERINE MENDOZA
Encroachment in public way Cleared 2/23/2023 KATHERINE MENDOZA
Highway dedication Cleared 2/23/2023 WALLIE JONG
Building over 36-ft Cleared 2/24/2023 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 2/24/2023 CALOSHA APPROVED
Bicycle Parking Cleared 2/27/2023 KATHERINE MENDOZA
Construction near power lines Cleared 3/6/2023 RIDWAN HARDY
GPI Written Notices Cleared 3/7/2023 RODOLFO ARIAS
Grading Pre-Inspection Cleared 3/7/2023 RODOLFO ARIAS
Fire Marshal Fire Life Safety Cleared 3/29/2023 MENOA AGHAJANI
Low Impact Development Cleared 4/4/2023 ANDRES COVARRUBIAS
Density Bonus 14.00.A.13 Cleared 4/6/2023 DORIS KWOK
Miscellaneous Cleared 4/13/2023 DANIEL CORONADO
Opn space landscape/Water mgmt Cleared 4/13/2023 DANIEL CORONADO
Permanent Supportive Housing Cleared 4/13/2023 DANIEL CORONADO
Site Plan review Cleared 4/13/2023 DANIEL CORONADO
Specific Plan Cleared 4/13/2023 DANIEL CORONADO
Sewer availability Cleared 4/18/2023 CELINA MORENO
Roof/Waste drainage to street Cleared 4/20/2023 WALLIE JONG
Public Housing Cleared 4/24/2023 RONALD PACHECO
DAS Clearance Cleared 4/25/2023 RODOLFO ARIAS
Work Adjacent to Public Way Cleared 4/26/2023 LARRY LEE

Contact Information

Architect Carson, Han, William; Lic. No.: C31806 719 N FAIRFAX AVE SUITE C      LOS ANGELES, CA 90046
Contractor United Building Company Inc; Lic. No.: 1034972-B 250 N. HARBOR DRIVE   SUITE 311    REDONDO BEACH, CA 90277
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/6/2023 Partial Approval NICK DANERI
Piling/Pier/Caisson 8/4/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/18/2023 Conditional Approval GREGORY POMISH
Green Building Rough 8/18/2023 Conditional Approval GREGORY POMISH
METHANE-Rough 8/18/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 8/18/2023 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 8/18/2023 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 8/24/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/3/2023 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/4/2023 Partial Approval NICK DANERI
Footing/Foundation/Slab 10/4/2023 Partial Approval NICK DANERI
METHANE-Barrier 10/4/2023 Approved NICK DANERI
METHANE-Subgrade 10/4/2023 Approved NICK DANERI
Excavation/Setback/Form/Re-Bar 10/5/2023 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 10/5/2023 Partial Approval GREGORY POMISH
Special/Order Compliance 10/5/2023 Approved TED RIES
Deputy Reinf. Concrete 10/6/2023 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/6/2023 Off-Hour Fees Due
Special/Order Compliance 10/6/2023 Approved TED RIES
Deputy Reinf. Concrete 10/10/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/10/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/10/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 10/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/10/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/12/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/13/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/16/2023 Conditional Approval NICK DANERI
Deputy Shotcrete 10/18/2023 Conditional Approval GREGORY POMISH
Green Building Rough 10/18/2023 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 10/18/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 10/18/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/18/2023 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 10/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/23/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/25/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/27/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 10/30/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/31/2023 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/31/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/1/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/2/2023 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/2/2023 Partial Approval GREGORY POMISH
Deputy Shotcrete 11/3/2023 Conditional Approval GREGORY POMISH
Green Building Rough 11/3/2023 Partial Inspection GREGORY POMISH
METHANE-Rough 11/3/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 11/3/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/3/2023 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 11/6/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/6/2023 Partial Approval GREGORY POMISH
Deputy Shotcrete 11/7/2023 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 11/7/2023 Partial Approval GREGORY POMISH
Deputy Shotcrete 11/8/2023 Conditional Approval GREGORY POMISH
Green Building Rough 11/8/2023 Partial Inspection GREGORY POMISH
METHANE-Rough 11/8/2023 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 11/8/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/8/2023 Partial Inspection GREGORY POMISH
Deputy Shotcrete 11/28/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/28/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/8/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 12/8/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 1/22/2024 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 1/22/2024 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 1/22/2024 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 1/22/2024 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 1/23/2024 Conditional Approval RONALD JIMENEZ
Footing/Foundation/Slab 1/23/2024 Partial Inspection RONALD JIMENEZ
Deputy Reinf. Concrete 1/26/2024 Conditional Approval NICK DANERI
Green Building Rough 1/26/2024 Not Ready for Inspection NICK DANERI
METHANE-Rough 1/26/2024 Approved NICK DANERI
Reinforced Concrete Frame 1/26/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 1/26/2024 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 1/27/2024 Partial Approval NICK DANERI
Deputy Shotcrete 2/9/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/12/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/13/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 2/13/2024 Partial Approval GREGORY POMISH
Deputy Shotcrete 2/14/2024 Conditional Approval GREGORY POMISH
Green Building Rough 2/14/2024 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 2/14/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 2/14/2024 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 2/15/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/16/2024 Conditional Approval GREGORY POMISH
Green Building Rough 2/16/2024 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 2/16/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 2/16/2024 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 2/20/2024 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 2/21/2024 Conditional Approval GREGORY POMISH
Deputy Shotcrete 2/21/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/21/2024 Not Ready for Inspection GREGORY POMISH
Green Building Rough 2/26/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 2/26/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 2/26/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Shotcrete 2/27/2024 Conditional Approval JEFFREY FULTON
Reinforced Concrete Frame 2/27/2024 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 2/28/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/28/2024 Off-Hour Fees Due
Reinforced Concrete Frame 2/28/2024 Off-Hour Fees Due
Verify Sprinkler Sign Off 2/28/2024 Off-Hour Fees Due
Green Building Rough 3/5/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/5/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/5/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 3/8/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/20/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/21/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/29/2024 Conditional Approval NICK DANERI
Green Building Rough 3/29/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/29/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 3/29/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 4/4/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 4/4/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/4/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 4/15/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 4/15/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/15/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Masonry Frame 4/17/2024 Partial Approval NICK DANERI
Deputy Shotcrete 4/18/2024 Conditional Approval NICK DANERI
Green Building Rough 4/18/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 4/18/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/18/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 5/6/2024 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/6/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/6/2024 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 5/7/2024 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/17/2024 Conditional Approval NICK DANERI
Green Building Rough 5/17/2024 Conditional Approval NICK DANERI
Reinforced Concrete Frame 5/17/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/17/2024 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 5/30/2024 Conditional Approval NICK DANERI
Green Building Rough 5/30/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/30/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/30/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 6/28/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 6/28/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 6/28/2024 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 8/6/2024 Conditional Approval NICK DANERI
Wood Frame 8/6/2024 Partial Approval NICK DANERI
Deputy Shotcrete 8/12/2024 Conditional Approval NICK DANERI
Green Building Rough 8/12/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 8/12/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 8/12/2024 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 8/20/2024 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 8/23/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/26/2024 Conditional Approval NICK DANERI
Green Building Rough 8/26/2024 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 8/26/2024 Conditional Approval NICK DANERI
Verify Sprinkler Sign Off 8/26/2024 Not Ready for Inspection NICK DANERI
Masonry Wall/Backfill 8/30/2024 Not Ready for Inspection JEROME BLACKWOOD
Masonry Wall/Backfill 9/3/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/11/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/27/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/16/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/17/2024 Partial Approval NICK DANERI
Deputy Reinf. Concrete 11/1/2024 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 11/1/2024 Off-Hour Fees Due
Green Building Rough 11/5/2024 Not Ready for Inspection JEROME BLACKWOOD
Reinforced Concrete Frame 11/5/2024 Partial Approval JEROME BLACKWOOD
Verify Sprinkler Sign Off 11/5/2024 Approved JEROME BLACKWOOD
Green Building Rough 11/20/2024 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/20/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/21/2024 Partial Approval NICK DANERI
Wood Frame 12/12/2024 Partial Approval LARRY ARNICK
Wood Frame 12/16/2024 Partial Approval NICK DANERI
Green Building Rough 12/18/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/18/2024 Partial Approval NICK DANERI
Wood Frame 12/20/2024 Partial Approval EDWIN GREGORYONA
Insulation 12/31/2024 Partial Approval NICK DANERI
Wood Frame 12/31/2024 Partial Approval NICK DANERI
Insulation 1/6/2025 Not Ready for Inspection NICK DANERI
Insulation 1/13/2025 Partial Approval NICK DANERI
Insulation 1/16/2025 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 1/17/2025 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/28/2025 Partial Approval NICK DANERI
Insulation 1/28/2025 Partial Approval NICK DANERI
Insulation 1/30/2025 Partial Approval NICK DANERI
Insulation 2/4/2025 Partial Approval NICK DANERI
Deputy Steel/Welding 2/6/2025 Partial Approval EDWIN GREGORYONA
Insulation 2/6/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/14/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/21/2025 Partial Approval EDWIN GREGORYONA
Insulation 2/21/2025 Partial Approval EDWIN GREGORYONA
Insulation 2/26/2025 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/3/2025 Partial Approval NICK DANERI
Insulation 3/3/2025 Partial Approval NICK DANERI
Insulation 3/4/2025 Partial Approval NICK DANERI
Insulation 3/13/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 3/18/2025 Not Ready for Inspection LARRY ARNICK
Insulation 3/19/2025 Partial Approval LARRY ARNICK
Insulation 3/20/2025 Partial Approval NICK DANERI
Wood Frame 3/25/2025 Partial Approval LARRY ARNICK
Insulation 3/26/2025 Partial Approval NICK DANERI
Insulation 4/3/2025 Partial Approval NICK DANERI
Drywall Nailing 4/7/2025 Partial Approval NICK DANERI
Insulation 4/11/2025 Not Ready for Inspection LARRY ARNICK
Insulation 4/14/2025 Partial Approval LARRY ARNICK
Insulation 4/15/2025 Partial Approval NICK DANERI
Drywall Nailing 4/18/2025 Partial Approval LARRY ARNICK
Insulation 4/23/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 4/28/2025 Partial Approval NICK DANERI
Drywall Nailing 5/5/2025 Partial Approval EDWIN GREGORYONA
Insulation 5/9/2025 Partial Approval NICK DANERI
Structural Steel Frame 5/12/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 5/19/2025 Partial Approval LARRY ARNICK
Drywall Nailing 5/22/2025 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/28/2025 No Access for Inspection RAFAEL CORTES
Interior/Exterior Lathing 6/3/2025 Partial Approval LARRY ARNICK
Insulation 6/9/2025 Partial Approval EDWIN GREGORYONA
Insulation 6/10/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 6/23/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 6/30/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/3/2025 Conditional Approval LARRY ARNICK
Interior/Exterior Lathing 7/3/2025 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 7/7/2025 No Result Entered NICK DANERI
Green Building Rough 7/7/2025 Approved JOEY BUCHANAN
Reinforced Masonry Frame 7/7/2025 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 7/8/2025 Partial Approval JOEY BUCHANAN
Reinforced Masonry Frame 7/10/2025 Partial Approval JOEY BUCHANAN
Insulation 7/22/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 8/5/2025 Not Ready for Inspection JOEY BUCHANAN
Special/Order Compliance 8/5/2025 Approved JOEY BUCHANAN
Drywall Nailing 8/14/2025 Not Ready for Inspection JOEY BUCHANAN
Interior/Exterior Lathing 8/14/2025 Partial Approval JOEY BUCHANAN
Special/Order Compliance 9/4/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/23/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 10/9/2025 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 10/9/2025 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 10/10/2025 Partial Approval LARRY ARNICK
Drywall Nailing 10/22/2025 No Access for Inspection EDWIN GREGORYONA
Drywall Nailing 10/24/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 11/13/2025 Partial Approval JOEY BUCHANAN
Special/Order Compliance 12/4/2025 Approved JOEY BUCHANAN
Special/Order Compliance 12/8/2025 Approved JOEY BUCHANAN
Final 12/15/2025 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 12/15/2025 Not Ready for Inspection LARRY ARNICK
Green Building Final 12/15/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/15/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 12/15/2025 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 12/15/2025 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 12/15/2025 Not Ready for Inspection LARRY ARNICK
Special/Order Compliance 12/19/2025 Approved JOEY BUCHANAN
Special/Order Compliance 12/23/2025 Approved JOEY BUCHANAN
Final 1/5/2026 Conditional Approval JOEY BUCHANAN
Footing/Foundation/Slab 1/5/2026 Approved JOEY BUCHANAN
Green Building Final 1/5/2026 Approved JOEY BUCHANAN
Reinforced Concrete Frame 1/5/2026 Approved JOEY BUCHANAN
Reinforced Masonry Frame 1/5/2026 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 1/5/2026 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 1/5/2026 Approved JOEY BUCHANAN
Final 2/10/2026 Not Ready for Inspection JOEY BUCHANAN
Special/Order Compliance 6/2/2026 Approved JOEY BUCHANAN