1639 S MANSFIELD AVE 90019

Certificate Information: 1639 S MANSFIELD AVE 90019

Application / Permit
21010-10000-03597
Plan Check / Job No.
B21LA13432
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
New accessory dwelling unit at rear of lot per LAMC 12.22 A.33 (c)(d). All work engineer.
Permit Issued
Issued on 7/3/2023
Issuing Office
Metro
Current Status
CofO Issued on 4/11/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/17/2021 APPLICANT
Assigned to Plan Check Engineer 7/23/2021 DANIEL SANJUAN
Corrections Issued 8/5/2021 DANIEL SANJUAN
Applicant returned to address corrections 12/15/2021 GEORGE ALVAREZ
Building Plans Picked Up 2/4/2022 APPLICANT
Applicant returned to address corrections 11/1/2022 FERNANDO FLORES
Applicant returned to address corrections 3/8/2023 CRISTINA SALAZAR
Plan Check Approved 6/6/2023 VICTOR CHEN
Issued 7/3/2023 APPLICANT
CofO in Progress 4/10/2026 BRENDAN MORELLI
Permit Finaled 4/11/2026 DEROLD HAUFF
CofO Issued 4/11/2026 DEROLD HAUFF
Permit Finaled 4/11/2026 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 9/9/2021 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 9/14/2021 WALLIE JONG
Sewer availability Cleared 9/14/2021 WALLIE JONG
Hydrant and Access approval Cleared 10/27/2021 ROBERT DUFF
Roof/Waste drainage to street Cleared 11/1/2021 WALLIE JONG
Construction near power lines Cleared 11/29/2021 RIDWAN HARDY
Flood clearance Cleared 2/24/2023 ABDULRAHMAN ALABTAH
Low Impact Development Cleared 5/25/2023 LUIS LUVANO

Contact Information

Contractor Residential Remodeling & Development Co; Lic. No.: 926862-B 3304 CEDAR AVE      LYNWOOD, CA 90262
Engineer Cooke,, Conway Cecil; Lic. No.: S5524 34658 LINDA ROSEA RD      TEMECULA, CA 92592

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 7/11/2023 Corrections Issued STUART CHAPMAN
Excavation/Setback/Form/Re-Bar 9/6/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
Excavation/Setback/Form/Re-Bar 9/11/2023 Corrections Issued JOSE AVILA
Excavation/Setback/Form/Re-Bar 9/13/2023 Corrections Issued JOSE AVILA
Excavation/Setback/Form/Re-Bar 9/20/2023 Not Ready for Inspection JOSE AVILA
Excavation/Setback/Form/Re-Bar 9/21/2023 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 10/5/2023 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 11/7/2023 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 11/16/2023 Conditional Approval ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 2/29/2024 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Rough 2/29/2024 No Access for Inspection STUART CHAPMAN
Sewer 2/29/2024 Not Ready for Inspection STUART CHAPMAN
ELECTRICAL-Rough 3/4/2024 Approved STUART CHAPMAN
Floor/Roof Diaphrgm/Shear Wall 3/4/2024 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Rough 3/4/2024 Corrections Issued STUART CHAPMAN
Sewer 3/4/2024 Partial Approval STUART CHAPMAN
Floor/Roof Diaphrgm/Shear Wall 3/6/2024 Partial Approval STUART CHAPMAN
HVAC-Rough 3/12/2024 Approved STUART CHAPMAN
PLUMBING-Rough 3/12/2024 Approved STUART CHAPMAN
Insulation 3/14/2024 Partial Approval STUART CHAPMAN
Drywall Nailing 3/28/2024 Not Ready for Inspection STUART CHAPMAN
Green Building Rough 3/28/2024 Approved STUART CHAPMAN
Interior/Exterior Lathing 3/28/2024 Partial Approval STUART CHAPMAN
Drywall Nailing 4/2/2024 Approved RICHARD DOCKUS
ELECTRICAL-Final 7/8/2024 Corrections Issued ARTHUR NEGRETE
PLUMBING-Final 7/8/2024 Approved ARTHUR NEGRETE
ELECTRICAL-Final 7/18/2024 Corrections Issued ARTHUR NEGRETE
HVAC-Final 7/18/2024 Not Ready for Inspection ARTHUR NEGRETE
ELECTRICAL-Final 7/29/2024 Not Ready for Inspection ARTHUR NEGRETE
HVAC-Final 7/29/2024 Corrections Issued ARTHUR NEGRETE
Special/Order Compliance 7/29/2024 Partial Approval NICHOLAS LOPEZ
ELECTRICAL-Final 8/30/2024 Approved ARTHUR NEGRETE
HVAC-Final 8/30/2024 Approved ARTHUR NEGRETE
BUILDING-Rough-Frame 11/8/2024 Partial Approval ARTHUR NEGRETE
FLOOD-Elevation Certificate 11/8/2024 Not Ready for Inspection ARTHUR NEGRETE
FLOOD-Proofing Certificate 11/8/2024 Not Ready for Inspection ARTHUR NEGRETE
Final 11/8/2024 Not Ready for Inspection ARTHUR NEGRETE
Footing/Foundation/Slab 11/8/2024 Partial Approval ARTHUR NEGRETE
Green Building Final 11/8/2024 Not Ready for Inspection ARTHUR NEGRETE
METHANE-Barrier 11/8/2024 Approved ARTHUR NEGRETE
METHANE-Final 11/8/2024 Approved ARTHUR NEGRETE
METHANE-Rough 11/8/2024 Approved ARTHUR NEGRETE
METHANE-Subgrade 11/8/2024 Approved ARTHUR NEGRETE
SGSOV-Seismic Gas S/O Valve 11/8/2024 SGSOV Not Ready ARTHUR NEGRETE
Service/Power Release 11/8/2024 Not Ready for Inspection ARTHUR NEGRETE
Smoke Detectors 11/8/2024 Approved ARTHUR NEGRETE
Verify Sprinkler Sign Off 11/8/2024 Approved ARTHUR NEGRETE
Service/Power Release 12/27/2024 Approved ARTHUR NEGRETE
BUILDING-Rough-Frame 1/10/2025 Partial Approval ARTHUR NEGRETE
FLOOD-Elevation Certificate 1/10/2025 Partial Approval ARTHUR NEGRETE
FLOOD-Proofing Certificate 1/10/2025 Partial Approval ARTHUR NEGRETE
Final 1/10/2025 Corrections Issued ARTHUR NEGRETE
Footing/Foundation/Slab 1/10/2025 Partial Approval ARTHUR NEGRETE
Green Building Final 1/10/2025 Approved ARTHUR NEGRETE
SGSOV-Seismic Gas S/O Valve 1/10/2025 SGSOV Not Ready ARTHUR NEGRETE
BUILDING-Rough-Frame 9/18/2025 Approved ARTHUR NEGRETE
FLOOD-Elevation Certificate 9/18/2025 Approved ARTHUR NEGRETE
FLOOD-Proofing Certificate 9/18/2025 Approved ARTHUR NEGRETE
Final 9/18/2025 Corrections Issued ARTHUR NEGRETE
Footing/Foundation/Slab 9/18/2025 Approved ARTHUR NEGRETE
SGSOV-Seismic Gas S/O Valve 9/18/2025 SGSOV Approved ARTHUR NEGRETE
Final 11/24/2025 Corrections Issued BRENDAN MORELLI
Final 3/5/2026 Not Ready for Inspection BRENDAN MORELLI
Service/Power Release 3/5/2026 Approved BRENDAN MORELLI
Final 4/10/2026 Conditional Approval BRENDAN MORELLI