Deputy Grading
|
9/21/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
9/26/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Grading Pre-Inspection
|
10/14/2022
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
1/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
2/14/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
2/14/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
2/14/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/10/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
4/10/2023
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
4/10/2023
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
5/3/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Final
|
5/24/2023
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
5/24/2023
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/23/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/27/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/21/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
7/28/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
7/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
7/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/3/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/4/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/8/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/14/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
8/14/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
8/15/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/16/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
8/16/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
8/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
8/18/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
8/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/31/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/6/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/18/2023
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Grading
|
9/19/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/19/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/20/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/21/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/22/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
9/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/26/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/27/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/28/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
9/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
9/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
9/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
9/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/29/2023
|
Approved
|
DAVID BURKHEAD
|
|
Wood Frame
|
10/30/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/31/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/2/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
11/2/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
11/2/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
11/2/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
11/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
11/7/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
11/7/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
11/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
11/8/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/14/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
11/14/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wall Anchors
|
11/14/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/15/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Wall Anchors
|
11/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
11/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/16/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/16/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
11/16/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Wood Frame
|
12/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
12/15/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
12/21/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/26/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
12/28/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/9/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/11/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Insulation
|
1/11/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Wood Frame
|
1/11/2024
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Deputy Wood Construction
|
1/16/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
1/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
1/26/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
1/30/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
2/1/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
2/1/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/1/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/8/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/13/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
2/16/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/21/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
2/21/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/21/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/22/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
2/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/9/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/17/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
4/29/2024
|
Approved
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/10/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/16/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/16/2024
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/6/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Special/Order Compliance
|
6/12/2024
|
Approved
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/13/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
6/26/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/5/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
8/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
8/13/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/14/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/14/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/16/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
8/16/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/27/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
8/28/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
10/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/31/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
11/13/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/13/2024
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Insulation
|
11/20/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
11/20/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
11/21/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
12/4/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/4/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
2/14/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
2/18/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
2/18/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/19/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
2/25/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
2/28/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/3/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
3/4/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/4/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/5/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/6/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/14/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
3/28/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
3/28/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
4/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
4/4/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/4/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/8/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/8/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/18/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/21/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/21/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
4/22/2025
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/22/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/22/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/23/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
4/24/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/24/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/24/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/25/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
6/3/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
6/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
6/9/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
6/27/2025
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/30/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
7/2/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
7/10/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/24/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2025
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Special/Order Compliance
|
8/4/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/20/2025
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/29/2025
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Special/Order Compliance
|
8/29/2025
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Drywall Nailing
|
9/2/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
9/2/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
9/30/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
10/1/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
10/2/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
10/7/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
10/7/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
10/21/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/3/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/11/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/9/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/12/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/13/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/21/2026
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/26/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/5/2026
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Special/Order Compliance
|
2/12/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
2/13/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
2/13/2026
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/13/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/13/2026
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/13/2026
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/13/2026
|
Conditional Approval
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
2/13/2026
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
2/13/2026
|
Approved
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/13/2026
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/24/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/25/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/25/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
2/26/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/26/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/26/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/26/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/27/2026
|
Partial Approval
|
DAVID BURKHEAD
|