316 N JUANITA AVE 90004
Certificate Information: 316 N JUANITA AVE 90004
- Application / Permit
- 21010-10000-03561
- Plan Check / Job No.
- B21LA13301
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- NEW 5 STORY TYPE IIIA 52 UNITS 100% AFFORDABLE PERMANENT SUPPORTIVE HOUSING MODULAR APARTMENT BUILDING, 14.00 A13 QPSH
- Permit Issued
- Issued on 2/7/2022
- Issuing Office
- Metro
- Current Status
- Issued on 2/7/2022
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 7/29/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 8/5/2021 | MANUEL MONTUFAR |
| Green Plans Picked Up | 8/16/2021 | APPLICANT |
| Disabled Access Plans Picked Up | 8/23/2021 | APPLICANT |
| Corrections Issued | 9/2/2021 | MANUEL MONTUFAR |
| Quality Review Completed | 9/2/2021 | ALLEN MANALANSAN |
| Building Plans Picked Up | 9/7/2021 | APPLICANT |
| Applicant returned to address corrections | 9/10/2021 | MANUEL MONTUFAR |
| Applicant returned to address corrections | 10/4/2021 | MANUEL MONTUFAR |
| Applicant returned to address corrections | 10/22/2021 | MANUEL MONTUFAR |
| Applicant returned to address corrections | 10/29/2021 | MANUEL MONTUFAR |
| Applicant returned to address corrections | 11/23/2021 | MANUEL MONTUFAR |
| Applicant returned to address corrections | 12/17/2021 | MANUEL MONTUFAR |
| Plan Check Approved | 2/7/2022 | MANUEL MONTUFAR |
| Issued | 2/7/2022 | APPLICANT |
| TCO Issued (Expire Date: 04-15-2026) | 10/17/2025 | RAFAEL ESPINOZA |
| TCO Issued (Expire Date: 04-28-2026) | 10/30/2025 | RAFAEL ESPINOZA |
Permit Application Clearance Information
| Address approval | Cleared | 9/16/2021 | WALLIE JONG |
| Eng Process Fee Ord 176,300 | Cleared | 9/23/2021 | WALLIE JONG |
| Building over 36-ft | Cleared | 11/11/2021 | CALOSHA APPROVED |
| Excavation more than 5-ft deep | Cleared | 11/11/2021 | CALOSHA APPROVED |
| GPI Written Notices | Cleared | 11/11/2021 | MANUEL MONTUFAR |
| Grading Pre-Inspection | Cleared | 11/11/2021 | MANUEL MONTUFAR |
| Bicycle Parking | Cleared | 11/30/2021 | JEREMY CHOK |
| Encroachment in public way | Cleared | 11/30/2021 | JEREMY CHOK |
| Hydrant and Access approval | Cleared | 1/11/2022 | KURT CORRAL |
| Trees in Parkway | Cleared | 1/11/2022 | ADALBERTO VERA |
| Highway dedication | Cleared | 1/13/2022 | JEANIE LAM |
| Low Impact Development | Cleared | 1/13/2022 | ANDRES COVARRUBIAS |
| Sewer availability | Cleared | 1/19/2022 | CINDY QI |
| Permit | Cleared | 1/20/2022 | LINDA MARGARET |
| Roof/Waste drainage to street | Cleared | 1/20/2022 | LINDA MARGARET |
| Green Code | Cleared | 1/24/2022 | AARON COSTA |
| Fire Marshal Fire Life Safety | Cleared | 1/26/2022 | MENOA AGHAJANI |
| Public Housing | Cleared | 1/27/2022 | JORGE ALCANTAR |
| DAS Clearance | Cleared | 2/1/2022 | MANUEL MONTUFAR |
| DAS Clearance | Cleared | 2/1/2022 | SHINE LIN |
| Density Bonus 14.00.A.13 | Cleared | 2/2/2022 | KENNETH LE |
| "Q" conditions | Cleared | 2/7/2022 | RENATA DRAGLAND |
| "T" removal | Cleared | 2/7/2022 | ANNA VIDAL |
| CPC | Cleared | 2/7/2022 | RENATA DRAGLAND |
| Frnt yard landscape/Water mgmt | Cleared | 2/7/2022 | RENATA DRAGLAND |
| Miscellaneous | Cleared | 2/7/2022 | ANNA VIDAL |
| Miscellaneous | Cleared | 2/7/2022 | RENATA DRAGLAND |
| Opn space landscape/Water mgmt | Cleared | 2/7/2022 | RENATA DRAGLAND |
| Permanent Supportive Housing | Cleared | 2/7/2022 | RENATA DRAGLAND |
| Prkng lot landscape/Water mgmt | Cleared | 2/7/2022 | RENATA DRAGLAND |
| Site Plan review | Cleared | 2/7/2022 | RENATA DRAGLAND |
Contact Information
| Architect | Baran,, Matthew; Lic. No.: C28926 | 5621 LOWELL STREET OAKLAND, CA 94608 |
| Architect | Bornstein,, Lise Michelle; Lic. No.: C30835 | 3573 HAYDEN AVENUE CULVER CITY, CA 90232 |
| Contractor | Sinanian; Lic. No.: 455273-B | 18980 VENTURA BLVD SUITE 200 TARZANA, CA 91356 |
| Engineer | Ekmekji,, Samir Dikran; Lic. No.: S2289 | 4314 GAYLE DR TARZANA, CA 91356 |
| Engineer | Jahani,, Fereidoun; Lic. No.: C62875 | 3720 BLANCHE ST PASADENA, CA 91107 |
| Engineer | Luttrell,, Kenneth A; Lic. No.: S1418 | 2495 NATOMAS PARK DR STE 650 SACRAMENTO, CA 95833 |
| Engineer | Minas,, Caro Jolfaie; Lic. No.: GE601 | 4742 SAN FERNANDO RD GLENDALE, CA 91204 |
| Engineer | Powers,, Brian Frederick; Lic. No.: C75902 | 2090 WEST 31ST STREET LOS ANGELES, CA 90018 |
| Engineer | Risung,, Kai Magnus; Lic. No.: C92053 | 1435 WEST BEAR TRACK DRIVE MERIDIAN, ID 83642 |
| Engineer | Rogers,, Robert S; Lic. No.: L8348 | 331 WEST ALAMEDA AVENUE APT B BURBANK, CA 91506 |
| Geologist | Minas,, Shant; Lic. No.: EG2607 | 566 RIVERDALE DRIVE GLENDALE, CA 91204 |
| Landscape Architect | Van, Sooy, Scott; Lic. No.: LA5505 | 9017 DICKS STREET WEST HOLLYWOOD, CA 90069 |
Inspector Information
| DAVID BURKHEAD, (213) 482-7294 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Special/Order Compliance | 2/9/2022 | Corrections Issued | DANIEL MC AULIFFE |
| Deputy Grading | 10/13/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Concrete | 10/13/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Grading | 10/14/2022 | Conditional Approval | DAVID BURKHEAD |
| Deputy Reinf. Concrete | 10/14/2022 | Conditional Approval | DAVID BURKHEAD |
| Footing/Foundation/Slab | 10/14/2022 | Partial Approval | DAVID BURKHEAD |
| METHANE-Barrier | 10/14/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| METHANE-Subgrade | 10/14/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| Deputy Reinf. Concrete | 10/28/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Concrete | 11/17/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Footing/Foundation/Slab | 11/21/2022 | Partial Approval | DAVID BURKHEAD |
| METHANE-Barrier | 11/21/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| METHANE-Subgrade | 11/21/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| Deputy Drilled-In Anchors | 11/30/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Masonry | 11/30/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Drilled-In Anchors | 12/1/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Masonry | 12/1/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Drilled-In Anchors | 12/2/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Masonry | 12/2/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Drilled-In Anchors | 12/5/2022 | Conditional Approval | DAVID BURKHEAD |
| Deputy Reinf. Masonry | 12/5/2022 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 12/8/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| Footing/Foundation/Slab | 12/9/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| METHANE-Barrier | 12/9/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| METHANE-Subgrade | 12/9/2022 | Not Ready for Inspection | DAVID BURKHEAD |
| Footing/Foundation/Slab | 4/10/2023 | Partial Approval | DAVID BURKHEAD |
| METHANE-Barrier | 4/10/2023 | Approved | DAVID BURKHEAD |
| METHANE-Subgrade | 4/10/2023 | Approved | DAVID BURKHEAD |
| Footing/Foundation/Slab | 5/3/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 5/9/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Footing/Foundation/Slab | 5/12/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Footing/Foundation/Slab | 5/17/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Footing/Foundation/Slab | 5/22/2023 | Not Ready for Inspection | EDWIN GREGORYONA |
| Footing/Foundation/Slab | 5/24/2023 | Partial Approval | DAVID BURKHEAD |
| Wood Frame | 6/29/2023 | Partial Inspection | DAVID BURKHEAD |
| Wood Frame | 7/6/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Deputy Wood Construction | 7/10/2023 | Conditional Approval | DAVID BURKHEAD |
| Floor/Roof Diaphrgm/Shear Wall | 7/10/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Deputy Steel/Welding | 7/11/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 7/11/2023 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 7/11/2023 | Partial Inspection | DAVID BURKHEAD |
| Deputy Wood Construction | 7/12/2023 | Conditional Approval | DAVID BURKHEAD |
| Wall Anchors | 7/12/2023 | Partial Inspection | DAVID BURKHEAD |
| Deputy Wood Construction | 7/13/2023 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 7/13/2023 | Partial Inspection | DAVID BURKHEAD |
| Wood Frame | 7/14/2023 | Partial Inspection | DAVID BURKHEAD |
| Deputy Wood Construction | 7/18/2023 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 7/18/2023 | Partial Inspection | DAVID BURKHEAD |
| Deputy Wood Construction | 7/19/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Floor/Roof Diaphrgm/Shear Wall | 7/19/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Wood Frame | 7/19/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Wood Construction | 7/20/2023 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 7/20/2023 | Partial Approval | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/1/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/3/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/4/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 8/4/2023 | Conditional Approval | DAVID BURKHEAD |
| Floor/Roof Diaphrgm/Shear Wall | 8/4/2023 | Partial Approval | DAVID BURKHEAD |
| Wall Anchors | 8/4/2023 | Partial Inspection | DAVID BURKHEAD |
| Wood Frame | 8/4/2023 | Partial Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 8/7/2023 | Conditional Approval | DAVID BURKHEAD |
| Floor/Roof Diaphrgm/Shear Wall | 8/7/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Insulation | 8/7/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/8/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Reinf. Masonry | 8/9/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/9/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/10/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 8/10/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/11/2023 | Conditional Approval | DAVID BURKHEAD |
| Floor/Roof Diaphrgm/Shear Wall | 8/11/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Wood Frame | 8/11/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Deputy Steel/Welding | 8/14/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 8/14/2023 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 8/14/2023 | Partial Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 8/16/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 8/17/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Wood Frame | 8/17/2023 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 8/18/2023 | Conditional Approval | GREGORY POMISH |
| Floor/Roof Diaphrgm/Shear Wall | 8/18/2023 | Not Ready for Inspection | GREGORY POMISH |
| Wood Frame | 8/18/2023 | Not Ready for Inspection | GREGORY POMISH |
| Deputy Wood Construction | 8/25/2023 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 8/25/2023 | Partial Approval | DAVID BURKHEAD |
| Wood Frame | 8/28/2023 | Not Ready for Inspection | VAHE KELEDJIAN |
| Drywall Nailing | 8/29/2023 | Partial Approval | VAHE KELEDJIAN |
| Wood Frame | 8/29/2023 | Partial Approval | VAHE KELEDJIAN |
| Floor/Roof Diaphrgm/Shear Wall | 8/30/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Wood Frame | 8/30/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Floor/Roof Diaphrgm/Shear Wall | 8/31/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Wood Frame | 8/31/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Special/Order Compliance | 9/1/2023 | Corrections Issued | DAVID BURKHEAD |
| Deputy Wood Construction | 9/7/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/8/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/11/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/12/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 9/13/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/14/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/15/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/18/2023 | Conditional Approval | DARRYL ARNOLD |
| Drywall Nailing | 9/18/2023 | Conditional Approval | DARRYL ARNOLD |
| Insulation | 9/18/2023 | Conditional Approval | DARRYL ARNOLD |
| Deputy Wood Construction | 9/19/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/20/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/21/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 9/21/2023 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Wood Construction | 9/22/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/25/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/26/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/27/2023 | Conditional Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/28/2023 | Conditional Approval | DAVID BURKHEAD |
| Wood Frame | 9/28/2023 | Partial Approval | DAVID BURKHEAD |
| Deputy Wood Construction | 9/29/2023 | Conditional Approval | DAVID BURKHEAD |
| Drywall Nailing | 9/29/2023 | Partial Approval | DAVID BURKHEAD |
| Wood Frame | 9/29/2023 | Partial Approval | DAVID BURKHEAD |
| Floor/Roof Diaphrgm/Shear Wall | 10/10/2023 | Partial Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 10/16/2023 | Partial Approval | DAVID BURKHEAD |
| Wood Frame | 10/16/2023 | Partial Approval | DAVID BURKHEAD |
| Drywall Nailing | 10/19/2023 | Not Ready for Inspection | GREGORY POMISH |
| Floor/Roof Diaphrgm/Shear Wall | 10/19/2023 | Not Ready for Inspection | GREGORY POMISH |
| Wood Frame | 10/19/2023 | Partial Inspection | GREGORY POMISH |
| Wood Frame | 10/23/2023 | Corrections Issued | DAVID BURKHEAD |
| Wood Frame | 10/25/2023 | Partial Approval | DAVID BURKHEAD |
| Light Gage Steel Frame | 11/7/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Light Gage Steel Frame | 11/9/2023 | Not Ready for Inspection | DAVID BURKHEAD |
| Drywall Nailing | 11/13/2023 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 11/14/2023 | Partial Approval | DAVID BURKHEAD |
| Excavation/Setback/Form/Re-Bar | 12/4/2023 | Partial Approval | DAVID BURKHEAD |
| Light Gage Steel Frame | 12/4/2023 | Partial Approval | DAVID BURKHEAD |
| Drywall Nailing | 12/7/2023 | Partial Approval | DAVID BURKHEAD |
| Drywall Nailing | 1/8/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Insulation | 1/8/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Wood Frame | 1/8/2024 | Partial Approval | DAVID BURKHEAD |
| Wood Frame | 1/9/2024 | Partial Approval | DAVID BURKHEAD |
| Insulation | 1/11/2024 | Partial Approval | RONALD JIMENEZ |
| Drywall Nailing | 1/30/2024 | Not Ready for Inspection | GREGORY POMISH |
| Drywall Nailing | 2/1/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Drywall Nailing | 2/2/2024 | Partial Inspection | DAVID BURKHEAD |
| Light Gage Steel Frame | 2/2/2024 | Partial Approval | DAVID BURKHEAD |
| Special/Order Compliance | 2/16/2024 | Approved | DAVID BURKHEAD |
| Wood Frame | 2/21/2024 | Partial Approval | DAVID BURKHEAD |
| Special/Order Compliance | 2/23/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Wood Frame | 2/23/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Interior/Exterior Lathing | 2/29/2024 | Partial Inspection | JEFFREY FULTON |
| Interior/Exterior Lathing | 3/15/2024 | Approved | DAVID BURKHEAD |
| Wood Frame | 3/29/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Wood Frame | 4/3/2024 | Partial Approval | DAVID BURKHEAD |
| Drywall Nailing | 4/9/2024 | Partial Approval | DAVID BURKHEAD |
| Wood Frame | 4/9/2024 | Partial Approval | DAVID BURKHEAD |
| Reinforced Concrete Frame | 4/12/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Wall Anchors | 4/12/2024 | Partial Inspection | DAVID BURKHEAD |
| Wood Frame | 5/14/2024 | Partial Approval | LARRY ARNICK |
| Wood Frame | 5/16/2024 | Partial Approval | DAVID BURKHEAD |
| Deputy Reinf. Concrete | 5/21/2024 | Conditional Approval | DAVID BURKHEAD |
| Footing/Foundation/Slab | 5/22/2024 | Partial Inspection | EDWIN GREGORYONA |
| Drywall Nailing | 6/13/2024 | Partial Approval | DAVID BURKHEAD |
| Wood Frame | 6/21/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Drywall Nailing | 7/11/2024 | Partial Approval | DAVID BURKHEAD |
| Special/Order Compliance | 7/17/2024 | Approved | DAVID BURKHEAD |
| Wood Frame | 8/1/2024 | Partial Inspection | DAVID BURKHEAD |
| Drywall Nailing | 8/5/2024 | Partial Inspection | DAVID BURKHEAD |
| Light Gage Steel Frame | 8/30/2024 | Partial Approval | DAVID BURKHEAD |
| Drywall Nailing | 9/5/2024 | Partial Approval | DAVID BURKHEAD |
| Interior/Exterior Lathing | 9/6/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Drywall Nailing | 9/20/2024 | Partial Approval | DAVID BURKHEAD |
| Special/Order Compliance | 9/26/2024 | Not Ready for Inspection | DAVID BURKHEAD |
| Special/Order Compliance | 10/4/2024 | Approved | DAVID BURKHEAD |
| Excavation/Setback/Form/Re-Bar | 2/6/2025 | Not Ready for Inspection | DAVID BURKHEAD |
| Special/Order Compliance | 2/13/2025 | Partial Inspection | DAVID BURKHEAD |
| T-Bar Ceiling | 2/24/2025 | Not Ready for Inspection | DAVID BURKHEAD |
| Masonry Wall/Backfill | 2/25/2025 | Partial Approval | DAVID BURKHEAD |
| T-Bar Ceiling | 2/25/2025 | Partial Approval | DAVID BURKHEAD |
| Excavation/Setback/Form/Re-Bar | 2/28/2025 | Not Ready for Inspection | DAVID BURKHEAD |
| Drywall Nailing | 8/29/2025 | Partial Approval | SORIN CIRSTOIU |
| Special/Order Compliance | 8/29/2025 | Partial Approval | SORIN CIRSTOIU |
| Drywall Nailing | 9/2/2025 | Partial Inspection | DAVID BURKHEAD |
| Insulation | 9/2/2025 | Partial Inspection | DAVID BURKHEAD |
| Drywall Nailing | 9/9/2025 | Partial Approval | LARRY ARNICK |
| Special/Order Compliance | 9/30/2025 | Approved | DAVID BURKHEAD |
| Final | 10/9/2025 | Partial Inspection | DAVID BURKHEAD |
| Footing/Foundation/Slab | 10/9/2025 | Approved | DAVID BURKHEAD |
| Green Building Final | 10/9/2025 | Not Ready for Inspection | DAVID BURKHEAD |
| Green Building Rough | 10/9/2025 | Approved | DAVID BURKHEAD |
| METHANE-Final | 10/9/2025 | Approved | DAVID BURKHEAD |
| METHANE-Rough | 10/9/2025 | Approved | DAVID BURKHEAD |
| Reinforced Masonry Frame | 10/9/2025 | Conditional Approval | DAVID BURKHEAD |
| SGSOV-Seismic Gas S/O Valve | 10/9/2025 | SGSOV Approved | DAVID BURKHEAD |
| Smoke Detectors | 10/9/2025 | Approved | DAVID BURKHEAD |
| Verify Sprinkler Sign Off | 10/9/2025 | Approved | DAVID BURKHEAD |
| Special/Order Compliance | 10/10/2025 | Approved | DAVID BURKHEAD |
| Green Building Final | 10/14/2025 | Not Ready for Inspection | DAVID BURKHEAD |
| Special/Order Compliance | 10/14/2025 | Approved | DAVID BURKHEAD |
| Special/Order Compliance | 2/17/2026 | Not Ready for Inspection | DAVID BURKHEAD |
| Final | 3/31/2026 | Not Ready for Inspection | DAVID BURKHEAD |
| Green Building Final | 3/31/2026 | Not Ready for Inspection | DAVID BURKHEAD |
| Reinforced Masonry Frame | 3/31/2026 | Not Ready for Inspection | DAVID BURKHEAD |
| Special/Order Compliance | 4/1/2026 | Approved | DAVID BURKHEAD |