316 N JUANITA AVE 90004

Certificate Information: 316 N JUANITA AVE 90004

Application / Permit
21010-10000-03561
Plan Check / Job No.
B21LA13301
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 5 STORY TYPE IIIA 52 UNITS 100% AFFORDABLE PERMANENT SUPPORTIVE HOUSING MODULAR APARTMENT BUILDING, 14.00 A13 QPSH
Permit Issued
Issued on 2/7/2022
Issuing Office
Metro
Current Status
Issued on 2/7/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/29/2021 APPLICANT
Assigned to Plan Check Engineer 8/5/2021 MANUEL MONTUFAR
Green Plans Picked Up 8/16/2021 APPLICANT
Disabled Access Plans Picked Up 8/23/2021 APPLICANT
Corrections Issued 9/2/2021 MANUEL MONTUFAR
Quality Review Completed 9/2/2021 ALLEN MANALANSAN
Building Plans Picked Up 9/7/2021 APPLICANT
Applicant returned to address corrections 9/10/2021 MANUEL MONTUFAR
Applicant returned to address corrections 10/4/2021 MANUEL MONTUFAR
Applicant returned to address corrections 10/22/2021 MANUEL MONTUFAR
Applicant returned to address corrections 10/29/2021 MANUEL MONTUFAR
Applicant returned to address corrections 11/23/2021 MANUEL MONTUFAR
Applicant returned to address corrections 12/17/2021 MANUEL MONTUFAR
Plan Check Approved 2/7/2022 MANUEL MONTUFAR
Issued 2/7/2022 APPLICANT
TCO Issued (Expire Date: 04-15-2026) 10/17/2025 RAFAEL ESPINOZA
TCO Issued (Expire Date: 04-28-2026) 10/30/2025 RAFAEL ESPINOZA

Permit Application Clearance Information

Address approval Cleared 9/16/2021 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 9/23/2021 WALLIE JONG
Building over 36-ft Cleared 11/11/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/11/2021 CALOSHA APPROVED
GPI Written Notices Cleared 11/11/2021 MANUEL MONTUFAR
Grading Pre-Inspection Cleared 11/11/2021 MANUEL MONTUFAR
Bicycle Parking Cleared 11/30/2021 JEREMY CHOK
Encroachment in public way Cleared 11/30/2021 JEREMY CHOK
Hydrant and Access approval Cleared 1/11/2022 KURT CORRAL
Trees in Parkway Cleared 1/11/2022 ADALBERTO VERA
Highway dedication Cleared 1/13/2022 JEANIE LAM
Low Impact Development Cleared 1/13/2022 ANDRES COVARRUBIAS
Sewer availability Cleared 1/19/2022 CINDY QI
Permit Cleared 1/20/2022 LINDA MARGARET
Roof/Waste drainage to street Cleared 1/20/2022 LINDA MARGARET
Green Code Cleared 1/24/2022 AARON COSTA
Fire Marshal Fire Life Safety Cleared 1/26/2022 MENOA AGHAJANI
Public Housing Cleared 1/27/2022 JORGE ALCANTAR
DAS Clearance Cleared 2/1/2022 MANUEL MONTUFAR
DAS Clearance Cleared 2/1/2022 SHINE LIN
Density Bonus 14.00.A.13 Cleared 2/2/2022 KENNETH LE
"Q" conditions Cleared 2/7/2022 RENATA DRAGLAND
"T" removal Cleared 2/7/2022 ANNA VIDAL
CPC Cleared 2/7/2022 RENATA DRAGLAND
Frnt yard landscape/Water mgmt Cleared 2/7/2022 RENATA DRAGLAND
Miscellaneous Cleared 2/7/2022 ANNA VIDAL
Miscellaneous Cleared 2/7/2022 RENATA DRAGLAND
Opn space landscape/Water mgmt Cleared 2/7/2022 RENATA DRAGLAND
Permanent Supportive Housing Cleared 2/7/2022 RENATA DRAGLAND
Prkng lot landscape/Water mgmt Cleared 2/7/2022 RENATA DRAGLAND
Site Plan review Cleared 2/7/2022 RENATA DRAGLAND

Contact Information

Architect Baran,, Matthew; Lic. No.: C28926 5621 LOWELL STREET      OAKLAND, CA 94608
Architect Bornstein,, Lise Michelle; Lic. No.: C30835 3573 HAYDEN AVENUE      CULVER CITY, CA 90232
Contractor Sinanian; Lic. No.: 455273-B 18980 VENTURA BLVD SUITE 200      TARZANA, CA 91356
Engineer Ekmekji,, Samir Dikran; Lic. No.: S2289 4314 GAYLE DR      TARZANA, CA 91356
Engineer Jahani,, Fereidoun; Lic. No.: C62875 3720 BLANCHE ST      PASADENA, CA 91107
Engineer Luttrell,, Kenneth A; Lic. No.: S1418 2495 NATOMAS PARK DR STE 650      SACRAMENTO, CA 95833
Engineer Minas,, Caro Jolfaie; Lic. No.: GE601 4742 SAN FERNANDO RD      GLENDALE, CA 91204
Engineer Powers,, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018
Engineer Risung,, Kai Magnus; Lic. No.: C92053 1435 WEST BEAR TRACK DRIVE      MERIDIAN, ID 83642
Engineer Rogers,, Robert S; Lic. No.: L8348 331 WEST ALAMEDA AVENUE APT B      BURBANK, CA 91506
Geologist Minas,, Shant; Lic. No.: EG2607 566 RIVERDALE DRIVE      GLENDALE, CA 91204
Landscape Architect Van, Sooy, Scott; Lic. No.: LA5505 9017 DICKS STREET      WEST HOLLYWOOD, CA 90069

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 2/9/2022 Corrections Issued DANIEL MC AULIFFE
Deputy Grading 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 10/14/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/14/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/14/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 10/14/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 10/14/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 11/21/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/5/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/5/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 12/8/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 12/9/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 12/9/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 12/9/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/10/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/10/2023 Approved DAVID BURKHEAD
METHANE-Subgrade 4/10/2023 Approved DAVID BURKHEAD
Footing/Foundation/Slab 5/3/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 5/12/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/17/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 5/24/2023 Partial Approval DAVID BURKHEAD
Wood Frame 6/29/2023 Partial Inspection DAVID BURKHEAD
Wood Frame 7/6/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 7/10/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/10/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 7/11/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 7/11/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 7/11/2023 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 7/12/2023 Conditional Approval DAVID BURKHEAD
Wall Anchors 7/12/2023 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 7/13/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 7/13/2023 Partial Inspection DAVID BURKHEAD
Wood Frame 7/14/2023 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 7/18/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 7/18/2023 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 7/19/2023 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/19/2023 Partial Inspection RAFAEL ESPINOZA
Wood Frame 7/19/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Wood Construction 7/20/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 7/20/2023 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 8/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/3/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/4/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 8/4/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/4/2023 Partial Approval DAVID BURKHEAD
Wall Anchors 8/4/2023 Partial Inspection DAVID BURKHEAD
Wood Frame 8/4/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 8/7/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/7/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 8/7/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 8/8/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 8/9/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/9/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/10/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 8/10/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/11/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/11/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/11/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 8/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 8/14/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 8/14/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 8/16/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 8/17/2023 Conditional Approval RAFAEL ESPINOZA
Wood Frame 8/17/2023 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 8/18/2023 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 8/18/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 8/18/2023 Not Ready for Inspection GREGORY POMISH
Deputy Wood Construction 8/25/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 8/25/2023 Partial Approval DAVID BURKHEAD
Wood Frame 8/28/2023 Not Ready for Inspection VAHE KELEDJIAN
Drywall Nailing 8/29/2023 Partial Approval VAHE KELEDJIAN
Wood Frame 8/29/2023 Partial Approval VAHE KELEDJIAN
Floor/Roof Diaphrgm/Shear Wall 8/30/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/30/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/31/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/31/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 9/1/2023 Corrections Issued DAVID BURKHEAD
Deputy Wood Construction 9/7/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/8/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/11/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/12/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 9/13/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/15/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/18/2023 Conditional Approval DARRYL ARNOLD
Drywall Nailing 9/18/2023 Conditional Approval DARRYL ARNOLD
Insulation 9/18/2023 Conditional Approval DARRYL ARNOLD
Deputy Wood Construction 9/19/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/20/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/21/2023 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 9/21/2023 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 9/22/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/25/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/26/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/27/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/28/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 9/28/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 9/29/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/29/2023 Partial Approval DAVID BURKHEAD
Wood Frame 9/29/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/10/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/16/2023 Partial Approval DAVID BURKHEAD
Wood Frame 10/16/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/19/2023 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/19/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 10/19/2023 Partial Inspection GREGORY POMISH
Wood Frame 10/23/2023 Corrections Issued DAVID BURKHEAD
Wood Frame 10/25/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/7/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/9/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 11/13/2023 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 11/14/2023 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/4/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/4/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/7/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/8/2024 Not Ready for Inspection DAVID BURKHEAD
Insulation 1/8/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/8/2024 Partial Approval DAVID BURKHEAD
Wood Frame 1/9/2024 Partial Approval DAVID BURKHEAD
Insulation 1/11/2024 Partial Approval RONALD JIMENEZ
Drywall Nailing 1/30/2024 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 2/1/2024 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 2/2/2024 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/2/2024 Partial Approval DAVID BURKHEAD
Special/Order Compliance 2/16/2024 Approved DAVID BURKHEAD
Wood Frame 2/21/2024 Partial Approval DAVID BURKHEAD
Special/Order Compliance 2/23/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 2/23/2024 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 2/29/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/15/2024 Approved DAVID BURKHEAD
Wood Frame 3/29/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/3/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/9/2024 Partial Approval DAVID BURKHEAD
Wood Frame 4/9/2024 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 4/12/2024 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 4/12/2024 Partial Inspection DAVID BURKHEAD
Wood Frame 5/14/2024 Partial Approval LARRY ARNICK
Wood Frame 5/16/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/21/2024 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/22/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 6/13/2024 Partial Approval DAVID BURKHEAD
Wood Frame 6/21/2024 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 7/11/2024 Partial Approval DAVID BURKHEAD
Special/Order Compliance 7/17/2024 Approved DAVID BURKHEAD
Wood Frame 8/1/2024 Partial Inspection DAVID BURKHEAD
Drywall Nailing 8/5/2024 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/30/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/5/2024 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/6/2024 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 9/20/2024 Partial Approval DAVID BURKHEAD
Special/Order Compliance 9/26/2024 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 10/4/2024 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/6/2025 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 2/13/2025 Partial Inspection DAVID BURKHEAD
T-Bar Ceiling 2/24/2025 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 2/25/2025 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 2/25/2025 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/28/2025 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 8/29/2025 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 8/29/2025 Partial Approval SORIN CIRSTOIU
Drywall Nailing 9/2/2025 Partial Inspection DAVID BURKHEAD
Insulation 9/2/2025 Partial Inspection DAVID BURKHEAD
Drywall Nailing 9/9/2025 Partial Approval LARRY ARNICK
Special/Order Compliance 9/30/2025 Approved DAVID BURKHEAD
Final 10/9/2025 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/9/2025 Approved DAVID BURKHEAD
Green Building Final 10/9/2025 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 10/9/2025 Approved DAVID BURKHEAD
METHANE-Final 10/9/2025 Approved DAVID BURKHEAD
METHANE-Rough 10/9/2025 Approved DAVID BURKHEAD
Reinforced Masonry Frame 10/9/2025 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 10/9/2025 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 10/9/2025 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 10/9/2025 Approved DAVID BURKHEAD
Special/Order Compliance 10/10/2025 Approved DAVID BURKHEAD
Green Building Final 10/14/2025 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 10/14/2025 Approved DAVID BURKHEAD
Special/Order Compliance 2/17/2026 Not Ready for Inspection DAVID BURKHEAD
Final 3/31/2026 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 3/31/2026 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 3/31/2026 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 4/1/2026 Approved DAVID BURKHEAD