1558 1/2 S OGDEN DR 90019

Certificate Information: 1558 1/2 S OGDEN DR 90019

Application / Permit
21010-10000-03510
Plan Check / Job No.
B21LA13087
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
*ePlan* CONVERT EXISTING DETACHED GARAGE TO NEW ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) and (d); ADD 5' X 11'-3" PATIO COVER
Permit Issued
Issued on 3/25/2022
Issuing Office
Current Status
CofO Issued on 5/13/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/13/2021 APPLICANT
Assigned to Plan Check Engineer 8/5/2021 SELLA BENYAMIN
Corrections Issued 8/5/2021 CRYSTEL MAALOUF
Applicant returned to address corrections 11/19/2021 SELLA BENYAMIN
Plan Check Approved 11/24/2021 SELLA BENYAMIN
Issued 3/25/2022 APPLICANT
CofO in Progress 4/27/2023 JOSE AVILA
Permit Finaled 5/13/2023 DEROLD HAUFF
CofO Issued 5/13/2023 DEROLD HAUFF
Permit Finaled 5/13/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 8/20/2021 STEVE MELGAR
Sewer availability Cleared 8/20/2021 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 8/25/2021 STEVE MELGAR
Construction near power lines Cleared 10/25/2021 RIDWAN HARDY
Construction within easement Cleared 10/25/2021 RIDWAN HARDY

Contact Information

Contractor Lloveras Carlos J; Lic. No.: 1082043-B 965 SERFAS CLUB DRIVE      CORONA, CA 92882
Engineer Ruan,, Federico R; Lic. No.: S6689 553 S OAK KNOLL AVE      PASADENA, CA 91101

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 4/7/2022 Partial Approval JOSE AVILA
Sewer 4/7/2022 Partial Approval JOSE AVILA
Deputy Drilled-In Anchors 4/12/2022 Conditional Approval RUBEN SALAS
Pre-Inspection 4/20/2022 Corrections Issued JOSE AVILA
Sewer 4/29/2022 Approved JOSE AVILA
Footing/Foundation/Slab 5/9/2022 Corrections Issued JOSE AVILA
METHANE-Barrier 5/9/2022 Approved JOSE AVILA
METHANE-Subgrade 5/9/2022 Approved JOSE AVILA
Footing/Foundation/Slab 5/19/2022 Approved JOSE AVILA
Green Building Rough 5/19/2022 No Access for Inspection JOSE AVILA
METHANE-Rough 5/19/2022 No Access for Inspection JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 5/31/2022 Approved JOSE AVILA
ELECTRICAL-Rough 6/7/2022 Corrections Issued JOSE AVILA
HVAC-Rough 6/7/2022 Corrections Issued JOSE AVILA
PLUMBING-Rough 6/7/2022 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 6/13/2022 Partial Approval JOSE AVILA
HVAC-Rough 6/16/2022 Approved JOSE AVILA
BUILDING-Rough-Frame 6/17/2022 Conditional Approval JOSE AVILA
Interior/Exterior Lathing 6/27/2022 Approved JOSE AVILA
Interior/Exterior Lathing 6/30/2022 Approved JOSE AVILA
Shower Pan 6/30/2022 Approved JOSE AVILA
BUILDING-Rough-Frame 7/5/2022 Partial Approval JOSE AVILA
Green Building Rough 7/5/2022 Approved JOSE AVILA
Insulation 7/8/2022 Approved JOSE AVILA
Drywall Nailing 7/27/2022 Approved JOSE AVILA
Interior/Exterior Lathing 1/25/2023 Approved MICHAEL LEWIS
Pre-Inspection 3/22/2023 Partial Inspection STUART CHAPMAN
Service/Power Release 3/22/2023 Corrections Issued STUART CHAPMAN
ELECTRICAL-Final 4/6/2023 Corrections Issued JOSE AVILA
HVAC-Final 4/6/2023 Corrections Issued JOSE AVILA
PLUMBING-Final 4/6/2023 Approved JOSE AVILA
ELECTRICAL-Final 4/14/2023 Approved JOSE AVILA
HVAC-Final 4/14/2023 Approved JOSE AVILA
BUILDING-Rough-Frame 4/26/2023 Approved JOSE AVILA
Final 4/26/2023 OK to Issue CofO JOSE AVILA
Green Building Final 4/26/2023 Approved JOSE AVILA
METHANE-Final 4/26/2023 Approved JOSE AVILA
METHANE-Rough 4/26/2023 Approved JOSE AVILA
SGSOV-Seismic Gas S/O Valve 4/26/2023 SGSOV Not Required JOSE AVILA
Smoke Detectors 4/26/2023 Approved JOSE AVILA
Service/Power Release 5/5/2023 Approved JOSE AVILA