|
Pre-Inspection
|
5/31/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/17/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/1/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
8/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
8/13/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
8/13/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
8/14/2024
|
Partial Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
8/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/20/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
8/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/28/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/4/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Piling/Pier/Caisson
|
9/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/4/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/18/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
9/26/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/15/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
10/15/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
10/17/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/17/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/17/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
10/29/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
11/6/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
11/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
11/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/19/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
11/19/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
11/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
11/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
11/22/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/25/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
11/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
11/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/27/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
11/27/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
12/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
12/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/12/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
12/12/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/18/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/19/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/30/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/3/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/3/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/6/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/6/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
1/6/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/10/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/13/2025
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/14/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/14/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/15/2025
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/15/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/16/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
1/21/2025
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/21/2025
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
1/21/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
1/22/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/23/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/24/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/24/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/24/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
1/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/29/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/29/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/30/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
1/30/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
2/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
2/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
2/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
2/4/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/4/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/11/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/11/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/13/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/20/2025
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Light Gage Steel Frame
|
2/20/2025
|
Approved
|
DARRYL ARNOLD
|
|
Drywall Nailing
|
2/24/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
2/24/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
2/25/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
2/25/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
2/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/3/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
3/3/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
3/5/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
3/5/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
3/7/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
3/7/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
3/11/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
3/11/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/11/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/13/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
3/18/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
3/19/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/20/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/26/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
3/26/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/27/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
3/27/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/1/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
4/1/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
4/2/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
4/8/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/8/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/17/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/18/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
4/18/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/18/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/22/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/23/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
4/23/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
5/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/21/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/29/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/29/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
6/6/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
6/9/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
6/10/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/11/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/13/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/13/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/13/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/17/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/18/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/20/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/20/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/23/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/24/2025
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/30/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/2/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
7/10/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
7/11/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
7/15/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/15/2025
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
7/15/2025
|
Approved
|
JAMES POWERS
|
|
Green Building Rough
|
7/15/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/15/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
7/15/2025
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
7/15/2025
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
7/15/2025
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/15/2025
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/22/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/23/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/8/2025
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
8/8/2025
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
9/5/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
9/15/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
9/22/2025
|
OK for TCO
|
JAMES POWERS
|
|
Verify Rec and Parks Fee Memo
|
9/22/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
10/3/2025
|
OK for TCO
|
JAMES POWERS
|
|
Final
|
10/17/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
11/10/2025
|
Approved
|
JAMES POWERS
|
|
Special/Order Compliance
|
3/10/2026
|
Approved
|
JAMES POWERS
|