1122-1122 1/2 E 27TH ST 90011

Certificate Information: 1122-1122 1/2 E 27TH ST 90011

Application / Permit
21010-10000-03303
Plan Check / Job No.
B21LA12436
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
New construction of two detached Accessory Dwelling Units per CA Govt. Code 65852.2(e)(1)(C) in one building. All work per engineered design.
Permit Issued
Issued on 12/9/2021
Issuing Office
Current Status
CofO Issued on 10/4/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/1/2021 APPLICANT
Assigned to Plan Check Engineer 7/9/2021 SAMUEL GONZALEZ
Corrections Issued 7/10/2021 SAMUEL GONZALEZ
Building Plans Picked Up 7/15/2021 APPLICANT
Applicant returned to address corrections 12/7/2021 ADRIANA LOPEZ
Issued 12/9/2021 APPLICANT
CofO in Progress 9/25/2023 BRENDAN MORELLI
CofO Issued 10/4/2023 DEROLD HAUFF
Permit Finaled 10/4/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/19/2021 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 7/19/2021 JEANIE LAM
Sewer availability Cleared 7/19/2021 JEANIE LAM
Hydrant and Access approval Cleared 9/13/2021 GILBERT URREA
Construction near power lines Cleared 10/13/2021 RIDWAN HARDY
Low Impact Development Cleared 12/1/2021 MARCO SANCHEZ
Roof/Waste drainage to street Cleared 12/2/2021 JEANIE LAM

Contact Information

Contractor Jerahian Araz; Lic. No.: 1045340-B 250 N COLLEGE PARK DR F36      UPLAND, CA 91786
Engineer Burnazyan,, Gegam; Lic. No.: C76761 5832 JAMIESON AVE      ENCINO, CA 91316

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/31/2022 Conditional Approval LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 6/6/2022 Corrections Issued JOAQUIN GREENOUGH
Footing/Foundation/Slab 6/6/2022 Partial Approval JOAQUIN GREENOUGH
Footing/Foundation/Slab 6/10/2022 Corrections Issued JOAQUIN GREENOUGH
Footing/Foundation/Slab 6/15/2022 Approved JOAQUIN GREENOUGH
Floor/Roof Diaphrgm/Shear Wall 7/14/2022 Approved JOAQUIN GREENOUGH
ELECTRICAL-Rough 8/30/2022 Approved RYAN SALAZAR
HVAC-Rough 8/30/2022 Approved RYAN SALAZAR
PLUMBING-Rough 8/30/2022 Approved RYAN SALAZAR
BUILDING-Rough-Frame 9/19/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Interior/Exterior Lathing 9/19/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Verify Sprinkler Sign Off 9/19/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Interior/Exterior Lathing 9/21/2022 Corrections Issued SHAVONNE ESPINOZA
BUILDING-Rough-Frame 9/27/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Verify Sprinkler Sign Off 9/27/2022 Partial Inspection SHAVONNE ESPINOZA
BUILDING-Rough-Frame 9/29/2022 Corrections Issued SHAVONNE ESPINOZA
Insulation 9/29/2022 Not Ready for Inspection SHAVONNE ESPINOZA
BUILDING-Rough-Frame 10/4/2022 Corrections Issued SHAVONNE ESPINOZA
BUILDING-Rough-Frame 10/7/2022 Approved SHAVONNE ESPINOZA
Insulation 10/21/2022 Conditional Approval ALEJANDRO DE ARTOLA
Interior/Exterior Lathing 10/21/2022 Partial Approval ALEJANDRO DE ARTOLA
Drywall Nailing 11/3/2022 Approved RYAN SALAZAR
Sewer 11/3/2022 Approved RYAN SALAZAR
Interior/Exterior Lathing 11/18/2022 Approved ALIZAH MAYAGOITIA
Shower Pan 11/18/2022 Approved ALIZAH MAYAGOITIA
Underground Mechanical 4/10/2023 Corrections Issued BRENDAN MORELLI
Final 6/8/2023 Corrections Issued BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 6/8/2023 SGSOV Approved BRENDAN MORELLI
Service/Power Release 6/8/2023 Approved BRENDAN MORELLI
Smoke Detectors 6/8/2023 Corrections Issued BRENDAN MORELLI
ELECTRICAL-Final 6/21/2023 Corrections Issued BRENDAN MORELLI
HVAC-Final 6/21/2023 Corrections Issued BRENDAN MORELLI
PLUMBING-Final 6/21/2023 Approved BRENDAN MORELLI
Smoke Detectors 6/21/2023 Approved BRENDAN MORELLI
ELECTRICAL-Final 6/28/2023 Approved BRENDAN MORELLI
HVAC-Final 6/28/2023 Approved BRENDAN MORELLI
Final 9/12/2023 Corrections Issued ALEJANDRO DE ARTOLA
Final 9/14/2023 OK to Issue CofO BRENDAN MORELLI