68 1/2 S FREMONT PL 90005

Certificate Information: 68 1/2 S FREMONT PL 90005

Application / Permit
21010-10000-02716
Plan Check / Job No.
B21LA10338
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 1-STORY, DETACHED ACCESSORY DWELLING UNIT per GCS 65852.2(E)(1)(B) and LAMC 12.22 A.33(c),(d) and (g)
Permit Issued
Issued on 2/8/2022
Issuing Office
Current Status
CofO Issued on 11/3/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/3/2021 APPLICANT
Assigned to Plan Check Engineer 6/9/2021 LUKE GONZALES
Corrections Issued 6/12/2021 LUKE GONZALES
Applicant returned to address corrections 11/2/2021 LUKE GONZALES
Applicant returned to address corrections 11/23/2021 JESSE JIMENEZ
Applicant returned to address corrections 12/4/2021 DANIEL SANJUAN
Plan Check Approved 12/6/2021 DANIEL SANJUAN
Building Plans Picked Up 12/10/2021 APPLICANT
Issued 2/8/2022 APPLICANT
CofO in Progress 10/12/2023 JEFFREY MEAD
Permit Finaled 11/3/2023 DEROLD HAUFF
CofO Issued 11/3/2023 DEROLD HAUFF
Permit Finaled 11/3/2023 DEROLD HAUFF

Permit Application Clearance Information

ZA Case Cleared 6/22/2021 MAXFIELD VERMY
ZA Case Cleared 6/22/2021 MAXFIELD VERMY
Address approval Cleared 7/2/2021 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 7/6/2021 JEANIE LAM
Sewer availability Cleared 7/6/2021 JEANIE LAM
Hydrant and Access approval Cleared 9/8/2021 KURT CORRAL
Low Impact Development Cleared 9/16/2021 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 9/23/2021 THOMAS LANG
Construction near power lines Cleared 10/19/2021 RIDWAN HARDY

Contact Information

Contractor Ead Homes; Lic. No.: 1045294-B 7731 FAIR AVE      SUN VALLEY, CA 91352
Engineer Mercado,, Lizandro; Lic. No.: S4331 12467 W WASHINGTON BLVD      LOS ANGELES, CA 90066

Inspector Information

JEFFREY MEAD, (213) 202-3240 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/1/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Footing/Foundation/Slab 6/1/2022 Not Ready for Inspection SHAVONNE ESPINOZA
METHANE-Barrier 6/1/2022 Conditional Approval SHAVONNE ESPINOZA
METHANE-Subgrade 6/1/2022 Conditional Approval SHAVONNE ESPINOZA
Footing/Foundation/Slab 6/9/2022 Corrections Issued ALIZAH MAYAGOITIA
METHANE-Barrier 6/9/2022 Approved ALIZAH MAYAGOITIA
METHANE-Subgrade 6/9/2022 Approved ALIZAH MAYAGOITIA
Special/Order Compliance 6/9/2022 Approved RUBEN SALAS
Footing/Foundation/Slab 6/28/2022 Corrections Issued JEFFREY MEAD
Excavation/Setback/Form/Re-Bar 7/1/2022 Approved JEFFREY MEAD
Footing/Foundation/Slab 7/1/2022 Approved JEFFREY MEAD
Structural Steel Frame 7/1/2022 Approved JEFFREY MEAD
Underground Mechanical 8/2/2022 Partial Approval JEFFREY MEAD
Underground Mechanical 8/5/2022 Corrections Issued JEFFREY MEAD
Underground Mechanical 8/9/2022 Approved JEFFREY MEAD
BUILDING-Rough-Frame 9/1/2022 Partial Approval JEFFREY MEAD
Green Building Rough 9/1/2022 Not Ready for Inspection JEFFREY MEAD
METHANE-Rough 9/1/2022 Partial Approval JEFFREY MEAD
PLUMBING-Rough 9/1/2022 Corrections Issued JEFFREY MEAD
Verify Sprinkler Sign Off 9/1/2022 Not Ready for Inspection JEFFREY MEAD
Insulation 9/15/2022 Partial Approval JEFFREY MEAD
PLUMBING-Rough 9/15/2022 Partial Approval JEFFREY MEAD
Structural Steel Frame 9/15/2022 Approved JEFFREY MEAD
Floor/Roof Diaphrgm/Shear Wall 9/20/2022 Partial Approval JEFFREY MEAD
Green Building Rough 9/20/2022 Not Ready for Inspection JEFFREY MEAD
METHANE-Rough 9/20/2022 Partial Approval JEFFREY MEAD
Verify Sprinkler Sign Off 9/20/2022 Not Ready for Inspection JEFFREY MEAD
Deputy Wood Construction 9/27/2022 Partial Approval JEFFREY MEAD
Floor/Roof Diaphrgm/Shear Wall 10/19/2022 Approved JEFFREY MEAD
Wood Frame 10/19/2022 Not Ready for Inspection JEFFREY MEAD
BUILDING-Rough-Frame 12/20/2022 Partial Approval JEFFREY MEAD
ELECTRICAL-Rough 12/20/2022 Corrections Issued JEFFREY MEAD
Green Building Rough 12/20/2022 Approved JEFFREY MEAD
METHANE-Rough 12/20/2022 Approved JEFFREY MEAD
PLUMBING-Rough 12/20/2022 Corrections Issued JEFFREY MEAD
Verify Sprinkler Sign Off 12/20/2022 Corrections Issued JEFFREY MEAD
Wood Frame 12/20/2022 Partial Approval JEFFREY MEAD
Floor/Roof Diaphrgm/Shear Wall 2/7/2023 Approved JEFFREY MEAD
Insulation 2/7/2023 Approved JEFFREY MEAD
Interior/Exterior Lathing 2/7/2023 Partial Approval JEFFREY MEAD
BUILDING-Rough-Frame 2/27/2023 Approved JEFFREY MEAD
ELECTRICAL-Rough 2/27/2023 Approved JEFFREY MEAD
HVAC-Rough 2/27/2023 Approved JEFFREY MEAD
PLUMBING-Rough 2/27/2023 Approved JEFFREY MEAD
Verify Sprinkler Sign Off 2/27/2023 Approved JEFFREY MEAD
Drywall Nailing 3/28/2023 Approved JEFFREY MEAD
Interior/Exterior Lathing 3/28/2023 Approved JEFFREY MEAD
Final 9/19/2023 Corrections Issued JEFFREY MEAD
Green Building Final 9/19/2023 Approved JEFFREY MEAD
SGSOV-Seismic Gas S/O Valve 9/19/2023 SGSOV Approved JEFFREY MEAD
Service/Power Release 9/19/2023 Not Required JEFFREY MEAD
Smoke Detectors 9/19/2023 Approved JEFFREY MEAD
Final 9/22/2023 Corrections Issued LILIANA PORTILLO
Final 9/29/2023 Not Ready for Inspection JEFFREY MEAD
Final 10/12/2023 OK to Issue CofO JEFFREY MEAD