2853 S WEST BLVD 90016

Certificate Information: 2853 S WEST BLVD 90016

Application / Permit
21010-10000-02714
Plan Check / Job No.
B21LA10333
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 6-story, 22-unit (2 ELI + 2 VLI + 1 LI = 22%) affordable housing apartment (factory-built housing) with 5 levels of Type IIB over 1-level Type IA lobby and parking at ground floor utilizing TOC Tier 3 incentives.
Permit Issued
Issued on 9/18/2023
Issuing Office
Metro
Current Status
Issued on 9/18/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 7/13/2023 RODOLFO ARIAS
Issued 9/18/2023 APPLICANT
TCO Issued (Expire Date: 06-21-2026) 12/23/2025 ERNESTO CORRAL

Permit Application Clearance Information

Highway dedication Cleared 10/29/2021 CELINA MORENO
Address approval Cleared 11/1/2021 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 11/29/2021 WALLIE JONG
Work Adjacent to Public Way Cleared 3/24/2022 ARMEN SARKISIAN
Hydrant and Access approval Cleared 9/28/2022 KURT CORRAL
Green Code Cleared 10/25/2022 AARON COSTA
Construction near power lines Cleared 11/5/2022 RIDWAN HARDY
Disturb/Remove Protected Trees Cleared 1/19/2023 ADALBERTO VERA
Building over 36-ft Cleared 2/7/2023 CALOSHA APPROVED
Low Impact Development Cleared 2/8/2023 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 2/8/2023 ADRIAN SANCHEZ
Permit Cleared 2/21/2023 AMAAN MALIK
Fire Marshal Fire Life Safety Cleared 3/2/2023 RONILO MULAWIN
Sewer availability Cleared 3/2/2023 WALLIE JONG
Frnt yard landscape/Water mgmt Cleared 5/19/2023 MAXFIELD VERMY
Miscellaneous Cleared 5/19/2023 MAXFIELD VERMY
Miscellaneous Cleared 5/19/2023 MAXFIELD VERMY
Miscellaneous Cleared 5/19/2023 MAXFIELD VERMY
Miscellaneous Cleared 5/19/2023 MAXFIELD VERMY
Miscellaneous Cleared 5/19/2023 MAXFIELD VERMY
Miscellaneous Cleared 5/19/2023 MAXFIELD VERMY
Opn space landscape/Water mgmt Cleared 5/19/2023 MAXFIELD VERMY
Prkng lot landscape/Water mgmt Cleared 5/19/2023 MAXFIELD VERMY
Miscellaneous Cleared 6/23/2023 MAXFIELD VERMY
DAS Clearance Cleared 6/28/2023 RODOLFO ARIAS
Density Bonus 12.22.A.31 Cleared 6/28/2023 LOUIE MILLER
Miscellaneous Cleared 6/28/2023 MAXFIELD VERMY
ZA Case Cleared 6/29/2023 MAXFIELD VERMY

Contact Information

Architect Brechtel,, Justin John; Lic. No.: C29521 6470 HILLPARK DR #102      LOS ANGELES, CA 90068
Contractor Hoffman Management & Construction Corporation; Lic. No.: 506092-B 984 MCGARRY STREET SUITE 101      LOS ANGELES, CA 90021
Engineer Hassan,, Mohamed Ali; Lic. No.: S5285 3621 HARBOR BLVD #125      SANTA ANA, CA 92704
Engineer Krief,, Dan Dov; Lic. No.: C76041 6420 WILSHIRE BLVD STE 1000      LOS ANGELES, CA 90048
Engineer Rybak,, Richard; Lic. No.: GE2131 20312 TAU PLACE      CHATSWORTH, CA 91311

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/12/2024 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/7/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/7/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/15/2024 Partial Approval MARTIN TAVITIAN
Green Building Rough 5/15/2024 Partial Approval MARTIN TAVITIAN
Reinforced Concrete Frame 5/15/2024 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 5/15/2024 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 5/17/2024 Partial Approval TIMOTHY POWELL
Footing/Foundation/Slab 6/27/2024 Approved MARTIN TAVITIAN
Deputy Reinf. Concrete 7/1/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/9/2024 Partial Approval MARTIN TAVITIAN
Reinforced Masonry Frame 7/9/2024 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 7/9/2024 Approved MARTIN TAVITIAN
Green Building Rough 7/15/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 7/15/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/1/2024 Partial Approval JACOB MYERS
Structural Steel Frame 10/9/2024 Partial Inspection MARTIN TAVITIAN
Pre-Inspection 10/10/2024 Approved MARTIN TAVITIAN
Floor/Roof Diaphrgm/Shear Wall 10/21/2024 Not Ready for Inspection MARTIN TAVITIAN
Light Gage Steel Frame 11/1/2024 Partial Approval MARTIN TAVITIAN
Insulation 11/7/2024 Partial Approval MARTIN TAVITIAN
Drywall Nailing 11/14/2024 Partial Approval MARTIN TAVITIAN
Drywall Nailing 11/15/2024 Partial Approval MARTIN TAVITIAN
Structural Steel Frame 11/19/2024 Not Ready for Inspection MARTIN TAVITIAN
Insulation 11/26/2024 Partial Approval RAFAEL CORTES
Structural Steel Frame 12/2/2024 Partial Approval MARTIN TAVITIAN
Structural Steel Frame 12/17/2024 Partial Approval MARTIN TAVITIAN
Drywall Nailing 12/23/2024 Not Ready for Inspection MARTIN TAVITIAN
Interior/Exterior Lathing 1/6/2025 Not Ready for Inspection MARTIN TAVITIAN
Light Gage Steel Frame 1/6/2025 Not Ready for Inspection MARTIN TAVITIAN
Structural Steel Frame 1/6/2025 Partial Approval MARTIN TAVITIAN
Drywall Nailing 1/13/2025 Not Ready for Inspection MARTIN TAVITIAN
Structural Steel Frame 1/13/2025 Partial Approval MARTIN TAVITIAN
Drywall Nailing 1/15/2025 Partial Approval MARTIN TAVITIAN
Insulation 1/30/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/4/2025 Partial Approval MARTIN TAVITIAN
Insulation 2/10/2025 Partial Approval MARTIN TAVITIAN
Insulation 2/18/2025 Partial Approval MARTIN TAVITIAN
Drywall Nailing 2/27/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 3/13/2025 Partial Approval MARTIN TAVITIAN
Drywall Nailing 3/19/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 3/19/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 4/2/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 4/4/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 4/11/2025 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 4/14/2025 Approved DARRYL ARNOLD
Drywall Nailing 4/22/2025 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 4/25/2025 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 5/1/2025 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/7/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 5/12/2025 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 5/30/2025 Not Ready for Inspection MARTIN TAVITIAN
Interior/Exterior Lathing 6/3/2025 Partial Approval MARTIN TAVITIAN
Pre-Inspection 6/3/2025 Approved MARTIN TAVITIAN
Interior/Exterior Lathing 6/5/2025 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 6/12/2025 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 6/27/2025 Partial Approval MARTIN TAVITIAN
Final 8/1/2025 Partial Inspection EDWIN GREGORYONA
Green Building Final 8/1/2025 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 8/1/2025 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 8/1/2025 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 8/1/2025 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 8/1/2025 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 8/1/2025 Approved EDWIN GREGORYONA
Masonry Wall/Backfill 9/23/2025 Partial Approval MARTIN TAVITIAN
Final 9/30/2025 Partial Approval MARTIN TAVITIAN
Green Building Final 9/30/2025 Approved MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 9/30/2025 SGSOV Approved MARTIN TAVITIAN
Final 10/14/2025 Not Ready for Inspection MARTIN TAVITIAN
Final 12/12/2025 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 5/22/2026 Approved MARTIN TAVITIAN
Special/Order Compliance 5/27/2026 Approved MARTIN TAVITIAN