15314 W RAYEN ST 91343

Certificate Information: 15314 W RAYEN ST 91343

Application / Permit
21010-10000-02535
Plan Check / Job No.
B21LA09630
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 4 STORY 64 UNITS (62 VLI/LI/ELI = 100%) AFFORDABLE HOUSING APARTMENT TO INCLUDE 4 STORY TYPE VA APARTMENT OVER 1 LEVEL SUBTERRANEAN PARKING TYPE 1A PER 14.00.A.13
Permit Issued
Issued on 11/8/2024
Issuing Office
Metro
Current Status
Issued on 11/8/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 11/8/2024 KEVIN MORALES
Issued 11/8/2024 APPLICANT

Permit Application Clearance Information

Miscellaneous Cleared 5/24/2022 AIDA KARAPETIAN
Miscellaneous Cleared 5/24/2022 AIDA KARAPETIAN
Opn space landscape/Water mgmt Cleared 5/24/2022 AIDA KARAPETIAN
Permanent Supportive Housing Cleared 5/24/2022 AIDA KARAPETIAN
Site Plan review Cleared 5/24/2022 AIDA KARAPETIAN
ZA Case Cleared 5/24/2022 AIDA KARAPETIAN
Eng Process Fee Ord 176,300 Cleared 7/15/2024 MARKOS PEREZ-BRAN
Address approval Cleared 7/18/2024 MARKOS PEREZ-BRAN
Hydrant and Access approval Cleared 8/15/2024 JOHN CONNEALLY
Trees in Parkway Cleared 10/4/2024 ADALBERTO VERA
Highway dedication Cleared 10/8/2024 BIAINA HARITUNIAN
Fire Marshal Fire Life Safety Cleared 10/28/2024 FIRE DEPARTMENT
Public Housing Cleared 10/28/2024 PAUL MUNZ
Green Code Cleared 10/30/2024 KEVIN MORALES
Low Impact Development Cleared 10/30/2024 AMMAR ELTAWIL
Density Bonus 14.00.A.13 Cleared 10/31/2024 MARITES CUNANAN
DAS Clearance Cleared 11/4/2024 KEVIN MORALES
Roof/Waste drainage to street Cleared 11/5/2024 LEE GUILBEAUX
Sewer availability Cleared 11/5/2024 MARY MARCUS
Work Adjacent to Public Way Cleared 11/5/2024 LEE GUILBEAUX
Building over 36-ft Cleared 11/6/2024 CALOSHA APPROVED

Contact Information

Architect Arnold,, John Howard; Lic. No.: C30834 2166 W 30TH STREET      LOS ANGELES, CA 90018
Contractor Walton Construction Inc; Lic. No.: 1034491-B 358 E FOOTHILL BLVD STE 100      SAN DIMAS, CA 91773
Engineer Berliner,, Neal David; Lic. No.: GE2576 4913 MONUMENT ST      SIMI VALLEY, CA 93063
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Weldon,, Kelly; Lic. No.: S5780 24305 LA MONTURA DR.      VALENCIA, CA 91354

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/29/2024 Partial Approval RICKEY JACKSON
Pre-Inspection 12/2/2024 Off-Hour Fees Due
Deputy Other (see comments) 1/14/2025 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/14/2025 Approved DANNY RODRIGUEZ
Deputy Other (see comments) 1/15/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/15/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Other (see comments) 1/16/2025 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/16/2025 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/4/2025 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/11/2025 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/11/2025 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 4/11/2025 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/14/2025 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 4/18/2025 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/18/2025 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 4/18/2025 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/21/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/21/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/21/2025 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/22/2025 Corrections Issued DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/24/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 4/24/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/25/2025 Partial Approval GREGORY POMISH
Deputy Shotcrete 4/25/2025 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/25/2025 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/28/2025 Partial Approval DANNY RODRIGUEZ
Green Building Rough 4/28/2025 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 4/28/2025 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 4/28/2025 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/29/2025 Approved DANNY RODRIGUEZ
Deputy Shotcrete 4/29/2025 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/29/2025 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 4/29/2025 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/30/2025 Approved DANNY RODRIGUEZ
Deputy Shotcrete 4/30/2025 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/1/2025 No Access for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 5/1/2025 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 5/1/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 5/2/2025 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/5/2025 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Masonry Frame 5/5/2025 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/8/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/9/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/13/2025 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/14/2025 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/14/2025 Not Ready for Inspection DANNY RODRIGUEZ
Masonry Wall/Backfill 5/14/2025 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/15/2025 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/19/2025 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 5/19/2025 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/22/2025 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 5/22/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/15/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/16/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 7/16/2025 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 7/16/2025 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 7/17/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/14/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/15/2025 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 8/21/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/22/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/25/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/26/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/26/2025 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 8/26/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/27/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/27/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/28/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/28/2025 Conditional Approval ROBERT DAVIS
Special/Order Compliance 9/4/2025 Corrections Issued ROBERT DAVIS
Deputy Steel/Welding 9/17/2025 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/18/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/19/2025 Conditional Approval GREGORY POMISH
Green Building Rough 9/19/2025 Partial Inspection GREGORY POMISH
Structural Steel Frame 9/19/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 9/19/2025 Partial Inspection GREGORY POMISH
Wood Frame 9/19/2025 Partial Inspection GREGORY POMISH
Structural Steel Frame 9/23/2025 Partial Inspection GREGORY POMISH
Green Building Rough 9/25/2025 Not Ready for Inspection GREGORY POMISH
Structural Steel Frame 9/25/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 9/25/2025 Not Ready for Inspection GREGORY POMISH
Wood Frame 9/25/2025 Partial Inspection GREGORY POMISH
Green Building Rough 9/29/2025 Partial Inspection GREGORY POMISH
Structural Steel Frame 9/29/2025 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/29/2025 Partial Inspection GREGORY POMISH
Wood Frame 9/29/2025 Partial Inspection GREGORY POMISH
Drywall Nailing 9/30/2025 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/1/2025 Partial Inspection GREGORY POMISH
Deputy Wood Construction 10/2/2025 Conditional Approval JEFFREY DURAN
Drywall Nailing 10/6/2025 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/6/2025 Partial Inspection GREGORY POMISH
Green Building Rough 10/6/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 10/6/2025 Not Ready for Inspection GREGORY POMISH
Wood Frame 10/6/2025 Partial Inspection GREGORY POMISH
Drywall Nailing 10/9/2025 Partial Approval GREGORY POMISH
Structural Steel Frame 10/9/2025 Partial Approval GREGORY POMISH
Drywall Nailing 10/15/2025 Partial Inspection GREGORY POMISH
Deputy Wood Construction 10/17/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 10/20/2025 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/20/2025 Partial Approval GREGORY POMISH
Deputy Wood Construction 10/22/2025 Conditional Approval GREGORY POMISH
Deputy Wood Construction 10/24/2025 Conditional Approval ANDREW DORSO
Drywall Nailing 10/27/2025 Partial Approval JOHN KITCKO
Deputy Wood Construction 10/29/2025 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/31/2025 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/4/2025 Corrections Issued JOHN KITCKO
Deputy Wood Construction 11/6/2025 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 11/6/2025 Corrections Issued GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 11/19/2025 Partial Inspection GREGORY POMISH
Deputy Wood Construction 11/24/2025 No Result Entered DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/25/2025 Partial Inspection GREGORY POMISH
Green Building Rough 12/1/2025 Not Ready for Inspection GREGORY POMISH
Insulation 12/1/2025 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 12/1/2025 Not Ready for Inspection GREGORY POMISH
Wood Frame 12/1/2025 Not Ready for Inspection GREGORY POMISH
Deputy Wood Construction 12/8/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 12/8/2025 Partial Inspection GREGORY POMISH
Special/Order Compliance 12/8/2025 Partial Approval SCOTT SOBEL
Deputy Wood Construction 12/12/2025 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 12/16/2025 Partial Approval GREGORY POMISH
Green Building Rough 12/16/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 12/16/2025 Partial Inspection GREGORY POMISH
Wood Frame 12/16/2025 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 1/5/2026 Partial Approval GREGORY POMISH
Green Building Rough 1/5/2026 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 1/5/2026 Partial Inspection GREGORY POMISH
Wood Frame 1/5/2026 Partial Approval GREGORY POMISH
Insulation 1/12/2026 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 1/22/2026 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/22/2026 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 1/22/2026 Partial Approval JOHN KITCKO
Green Building Rough 1/22/2026 Not Ready for Inspection JOHN KITCKO
Insulation 1/22/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 1/22/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 1/22/2026 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 1/23/2026 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/27/2026 Partial Inspection JOHN KITCKO
Green Building Rough 1/27/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 1/27/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 1/27/2026 Partial Approval JOHN KITCKO
Deputy Wood Construction 1/28/2026 Approved JOHN KITCKO
Drywall Nailing 2/2/2026 Partial Approval JOHN KITCKO
Green Building Rough 2/2/2026 Not Ready for Inspection JOHN KITCKO
Insulation 2/2/2026 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 2/2/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/2/2026 Partial Approval JOHN KITCKO
Drywall Nailing 2/3/2026 Not Ready for Inspection JOHN KITCKO
Insulation 2/3/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 2/3/2026 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/4/2026 Not Ready for Inspection GREGORY POMISH
Green Building Rough 2/4/2026 Not Ready for Inspection GREGORY POMISH
Insulation 2/4/2026 Not Ready for Inspection GREGORY POMISH
Interior/Exterior Lathing 2/4/2026 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 2/4/2026 Not Ready for Inspection GREGORY POMISH
Wood Frame 2/4/2026 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 2/5/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/9/2026 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/9/2026 Approved JOHN KITCKO
Insulation 2/9/2026 Partial Approval JOHN KITCKO
Pre-Inspection 2/9/2026 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 2/9/2026 Partial Inspection JOHN KITCKO
Wood Frame 2/9/2026 Partial Inspection JOHN KITCKO
Deputy Wood Construction 2/10/2026 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/11/2026 Partial Approval GREGORY POMISH
Insulation 2/11/2026 Partial Approval GREGORY POMISH
Drywall Nailing 2/12/2026 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/12/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 2/12/2026 Not Ready for Inspection JOHN KITCKO
Insulation 2/12/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 2/12/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/12/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/12/2026 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 2/13/2026 Approved JOHN KITCKO
Insulation 2/13/2026 Partial Inspection JOHN KITCKO
Special/Order Compliance 2/13/2026 Corrections Issued JOHN KITCKO
Deputy Reinf. Masonry 2/17/2026 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/17/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 2/17/2026 Not Ready for Inspection JOHN KITCKO
Insulation 2/17/2026 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 2/17/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/17/2026 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/18/2026 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 2/18/2026 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 2/19/2026 Approved JOHN KITCKO
Special/Order Compliance 2/20/2026 Partial Inspection JOHN KITCKO
Drywall Nailing 2/23/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 2/23/2026 Not Ready for Inspection JOHN KITCKO
Insulation 2/23/2026 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 2/23/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/23/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/23/2026 Conditional Approval JOHN KITCKO
Drywall Nailing 2/24/2026 Partial Approval JOHN KITCKO
Insulation 2/24/2026 Partial Approval JOHN KITCKO
Drywall Nailing 2/26/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 2/26/2026 Not Ready for Inspection JOHN KITCKO
Insulation 2/26/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 2/26/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/26/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/26/2026 Partial Approval JOHN KITCKO
Drywall Nailing 3/2/2026 Partial Approval JOHN KITCKO
Insulation 3/2/2026 Partial Approval JOHN KITCKO
Drywall Nailing 3/5/2026 Partial Approval JOHN KITCKO
Insulation 3/5/2026 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 3/5/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 3/6/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 3/6/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/6/2026 Partial Approval JOHN KITCKO
Drywall Nailing 3/9/2026 Not Ready for Inspection JOHN KITCKO
Insulation 3/9/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 3/9/2026 Partial Approval JOHN KITCKO
Drywall Nailing 3/10/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 3/10/2026 Not Ready for Inspection JOHN KITCKO
Insulation 3/10/2026 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 3/10/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/10/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/11/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 3/11/2026 Not Ready for Inspection JOHN KITCKO
Insulation 3/13/2026 Not Ready for Inspection GREGORY POMISH
Interior/Exterior Lathing 3/13/2026 Partial Approval GREGORY POMISH
Drywall Nailing 3/18/2026 Not Ready for Inspection JOHN KITCKO
Insulation 3/18/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 3/18/2026 Partial Approval JOHN KITCKO
Green Building Rough 3/19/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 3/19/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/19/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/20/2026 Partial Approval JOHN KITCKO
Insulation 3/20/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/20/2026 Partial Approval JOHN KITCKO
Insulation 3/23/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 3/23/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 3/23/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/24/2026 Not Ready for Inspection JOHN KITCKO
Insulation 3/24/2026 Partial Approval JOHN KITCKO
Structural Steel Frame 3/24/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/25/2026 Not Ready for Inspection JOHN KITCKO
Insulation 3/25/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 3/25/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 3/25/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/31/2026 Partial Approval JOHN KITCKO
Insulation 3/31/2026 Partial Approval JOHN KITCKO
Drywall Nailing 4/2/2026 Partial Approval GREGORY POMISH
Insulation 4/2/2026 Partial Inspection GREGORY POMISH
Interior/Exterior Lathing 4/2/2026 Partial Inspection GREGORY POMISH
Drywall Nailing 4/3/2026 Partial Inspection GREGORY POMISH
Insulation 4/3/2026 Not Ready for Inspection GREGORY POMISH
Interior/Exterior Lathing 4/3/2026 Partial Approval GREGORY POMISH
Drywall Nailing 4/6/2026 Partial Approval JOHN KITCKO
Insulation 4/6/2026 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 4/6/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 4/7/2026 Partial Approval JOHN KITCKO
Insulation 4/7/2026 Corrections Issued JOHN KITCKO
Drywall Nailing 4/8/2026 Partial Inspection JOHN KITCKO
Interior/Exterior Lathing 4/8/2026 Not Ready for Inspection JOHN KITCKO
Deputy Wood Construction 4/9/2026 Conditional Approval JOHN KITCKO
Drywall Nailing 4/9/2026 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/9/2026 Not Ready for Inspection JOHN KITCKO
Insulation 4/9/2026 Corrections Issued JOHN KITCKO
Drywall Nailing 4/14/2026 Partial Approval JOHN KITCKO
Drywall Nailing 4/15/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 4/15/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 4/17/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 4/17/2026 Partial Approval JOHN KITCKO
Drywall Nailing 4/20/2026 Not Ready for Inspection JOHN KITCKO
Insulation 4/20/2026 Partial Approval JOHN KITCKO
Wood Frame 4/20/2026 Partial Approval JOHN KITCKO
Drywall Nailing 4/21/2026 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 4/21/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 4/21/2026 Partial Inspection JOHN KITCKO
Drywall Nailing 4/22/2026 Not Ready for Inspection JOHN KITCKO
Insulation 4/22/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 4/22/2026 Partial Approval JOHN KITCKO
Drywall Nailing 4/23/2026 Partial Approval JOHN KITCKO
Insulation 4/23/2026 Partial Approval JOHN KITCKO
Drywall Nailing 4/24/2026 Not Ready for Inspection JOHN KITCKO
Insulation 4/24/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 4/24/2026 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 4/28/2026 Approved JOHN KITCKO
Drywall Nailing 4/29/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 4/29/2026 Partial Approval JOHN KITCKO
Drywall Nailing 5/4/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 5/4/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 5/6/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 5/6/2026 Partial Approval JOHN KITCKO
Drywall Nailing 5/7/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 5/7/2026 Partial Inspection JOHN KITCKO
Drywall Nailing 5/11/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 5/11/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 5/11/2026 Partial Approval JOHN KITCKO
Drywall Nailing 5/12/2026 Partial Inspection GREGORY POMISH
Interior/Exterior Lathing 5/12/2026 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/12/2026 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 5/13/2026 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 5/13/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 5/13/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 5/14/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 5/14/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 5/14/2026 Partial Approval JOHN KITCKO
Drywall Nailing 5/15/2026 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 5/15/2026 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 5/15/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 5/19/2026 Approved JOHN KITCKO
Interior/Exterior Lathing 5/19/2026 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 5/19/2026 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/19/2026 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 5/20/2026 Approved JOHN KITCKO
Wood Frame 5/20/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 5/21/2026 Not Ready for Inspection JOHN KITCKO
Insulation 5/21/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 5/21/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 5/22/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 5/22/2026 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 5/29/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 5/29/2026 Partial Approval JOHN KITCKO
Drywall Nailing 6/1/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/1/2026 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 6/5/2026 Partial Approval JOHN KITCKO
Light Gage Steel Frame 6/5/2026 Partial Approval JOHN KITCKO