Pre-Inspection
|
11/29/2024
|
Partial Approval
|
RICKEY JACKSON
|
|
Pre-Inspection
|
12/2/2024
|
Off-Hour Fees Due
|
|
|
Deputy Other (see comments)
|
1/14/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
1/14/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Other (see comments)
|
1/15/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
1/15/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Other (see comments)
|
1/16/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
1/16/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
2/4/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
4/11/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
4/11/2025
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
4/11/2025
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
4/14/2025
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/18/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
4/18/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
4/21/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
4/21/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
4/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
4/22/2025
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
4/24/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Shotcrete
|
4/24/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
4/25/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
4/25/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
4/25/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
4/28/2025
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
4/28/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
4/28/2025
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
4/28/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
4/29/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Shotcrete
|
4/29/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
4/29/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
4/30/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Shotcrete
|
4/30/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
5/1/2025
|
No Access for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
5/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
5/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
5/2/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
5/5/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
5/5/2025
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/8/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/9/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/13/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/14/2025
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
5/14/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
5/14/2025
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/15/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
5/19/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
5/19/2025
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
5/22/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
5/22/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/15/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/16/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
7/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/17/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/13/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/14/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/15/2025
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Concrete
|
8/21/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/22/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/25/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/26/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
8/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/27/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/27/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/28/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/28/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/4/2025
|
Corrections Issued
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
9/17/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
9/18/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
9/19/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
9/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
9/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
9/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
9/25/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
9/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/25/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
9/29/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
9/29/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/29/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/29/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/30/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/1/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
10/2/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/6/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/6/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
10/6/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
10/6/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
10/6/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/9/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Structural Steel Frame
|
10/9/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/15/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
10/17/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/20/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/20/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
10/22/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
10/24/2025
|
Conditional Approval
|
ANDREW DORSO
|
|
Drywall Nailing
|
10/27/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
10/29/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/31/2025
|
Conditional Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/4/2025
|
Corrections Issued
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
11/6/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2025
|
Corrections Issued
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
11/24/2025
|
No Result Entered
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
12/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
12/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
12/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
12/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
12/8/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
12/8/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
12/8/2025
|
Partial Approval
|
SCOTT SOBEL
|
|
Deputy Wood Construction
|
12/12/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
12/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
12/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
12/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/5/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
1/5/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
1/5/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
1/5/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
1/12/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/22/2026
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
1/22/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
1/22/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/22/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
1/22/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
1/22/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/23/2026
|
Conditional Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/27/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
1/27/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
1/27/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
1/27/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
1/28/2026
|
Approved
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/2/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
2/2/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/2/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/2/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/2/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/3/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/3/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
2/3/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
2/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
2/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
2/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
2/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
2/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
2/5/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/9/2026
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/9/2026
|
Approved
|
JOHN KITCKO
|
|
Insulation
|
2/9/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Pre-Inspection
|
2/9/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/9/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/9/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
2/10/2026
|
Approved
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
2/11/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/12/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
2/12/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/12/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
2/12/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/12/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/12/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/13/2026
|
Approved
|
JOHN KITCKO
|
|
Insulation
|
2/13/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
2/13/2026
|
Corrections Issued
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/17/2026
|
Conditional Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
2/17/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
2/17/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/17/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/17/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/17/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
2/18/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
2/18/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/19/2026
|
Approved
|
JOHN KITCKO
|
|
Special/Order Compliance
|
2/20/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/23/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
2/23/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/23/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
2/23/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/23/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/23/2026
|
Conditional Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/24/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
2/24/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/26/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
2/26/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/26/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
2/26/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
2/26/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/26/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/2/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/2/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/5/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/5/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
3/5/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
3/6/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
3/6/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
3/6/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/9/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
3/9/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
3/9/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/10/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
3/10/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
3/10/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
3/10/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
3/10/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/11/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
3/11/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
3/13/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
3/13/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
3/18/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
3/18/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
3/18/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
3/19/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
3/19/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
3/19/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/20/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/20/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
3/20/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/23/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
3/23/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
3/23/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/24/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
3/24/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Structural Steel Frame
|
3/24/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/25/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
3/25/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
3/25/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
3/25/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/31/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/31/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/2/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
4/2/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
4/2/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
4/3/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
4/3/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
4/3/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
4/6/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/6/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/6/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/7/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/7/2026
|
Corrections Issued
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/8/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/8/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
4/9/2026
|
Conditional Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/9/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/9/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
4/9/2026
|
Corrections Issued
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/14/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/15/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
4/15/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/17/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/17/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/20/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
4/20/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
4/20/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/21/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/21/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
4/21/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/22/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
4/22/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
4/22/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/23/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/23/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/24/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
4/24/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
4/24/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/28/2026
|
Approved
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/29/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
4/29/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/4/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/4/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/6/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/6/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/7/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/7/2026
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/11/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/11/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/11/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/12/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
5/12/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
5/12/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/13/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/13/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/13/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/14/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/14/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/14/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/15/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/15/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/15/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
5/19/2026
|
Approved
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/19/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/19/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
5/19/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/20/2026
|
Approved
|
JOHN KITCKO
|
|
Wood Frame
|
5/20/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/21/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
5/21/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/21/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/22/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/22/2026
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/29/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/29/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
6/1/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
6/1/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Drywall Nailing
|
6/5/2026
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
6/5/2026
|
Partial Approval
|
JOHN KITCKO
|