Reinforced Concrete Frame
|
7/5/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
7/7/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/8/2022
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Barrier
|
7/8/2022
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Subgrade
|
7/8/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
8/3/2022
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
8/18/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
9/19/2022
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
9/21/2022
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
10/12/2022
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
METHANE-Barrier
|
10/12/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Subgrade
|
10/12/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
11/17/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Barrier
|
11/17/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Subgrade
|
11/17/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Structural Steel Frame
|
11/17/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
12/13/2022
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
12/16/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
12/19/2022
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2022
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/29/2022
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/30/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Reinforced Concrete Frame
|
12/30/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Reinforced Concrete Frame
|
1/11/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
1/13/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Reinforced Concrete Frame
|
2/21/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
3/2/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
3/2/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
3/6/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
3/22/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
3/24/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Reinforced Concrete Frame
|
3/30/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/4/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
4/5/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Barrier
|
4/5/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Subgrade
|
4/5/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/10/2023
|
Approved
|
STEVEN LEVITT
|
|
Reinforced Concrete Frame
|
4/13/2023
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
4/14/2023
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
4/17/2023
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Light Gage Steel Frame
|
4/20/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
4/20/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
4/21/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
4/26/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
4/27/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/27/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
4/27/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/5/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Drywall Nailing
|
5/8/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
5/8/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
5/9/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/9/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
5/9/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
5/11/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
5/15/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
5/16/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/18/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
5/19/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/22/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Light Gage Steel Frame
|
5/23/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
5/24/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
5/25/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
5/30/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Light Gage Steel Frame
|
6/2/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Light Gage Steel Frame
|
6/5/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
6/5/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/8/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/9/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/9/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/12/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
6/12/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/13/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/13/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/14/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/15/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/15/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/16/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/20/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/20/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/21/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/21/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/22/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Drywall Nailing
|
6/26/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/27/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/28/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
6/28/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/30/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/3/2023
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
7/5/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/6/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/6/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/10/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/11/2023
|
Partial Approval
|
KENNETH ROBERTS
|
|
Insulation
|
7/11/2023
|
Partial Approval
|
KENNETH ROBERTS
|
|
Insulation
|
7/12/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
7/12/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
7/13/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/17/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/17/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/19/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/20/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/20/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
7/24/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Insulation
|
7/24/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
METHANE-Barrier
|
7/24/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
METHANE-Subgrade
|
7/24/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Drywall Nailing
|
7/25/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/25/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/26/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/28/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/31/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
8/2/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
8/3/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
8/3/2023
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/7/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
8/7/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
8/7/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
8/8/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
8/9/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
8/10/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
8/10/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/11/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
8/11/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Barrier
|
8/11/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Subgrade
|
8/11/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/16/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/18/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/21/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
8/21/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
8/23/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/25/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
8/25/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
8/29/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Barrier
|
8/29/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
METHANE-Subgrade
|
8/29/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
8/30/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
8/30/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
8/31/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
9/5/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Drywall Nailing
|
9/8/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
T-Bar Ceiling
|
9/11/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/15/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
9/15/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
9/18/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
9/20/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
9/22/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
2/2/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
2/7/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
2/8/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
2/12/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
2/13/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
2/27/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
4/9/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
4/10/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
4/15/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
4/17/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
4/18/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
10/24/2024
|
OK to Issue CofO
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Green Building Final
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
METHANE-Barrier
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
METHANE-Final
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
METHANE-Rough
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
METHANE-Subgrade
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
10/24/2024
|
SGSOV No Gas
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
10/24/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Green Building Final
|
10/25/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
10/25/2024
|
Approved
|
DANNY RODRIGUEZ
|