Footing/Foundation/Slab
|
9/20/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Footing/Foundation/Slab
|
9/27/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
9/27/2023
|
Partial Approval
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
10/2/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
11/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Piling/Pier/Caisson
|
11/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
11/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/11/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/18/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/25/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/25/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/31/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/14/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
2/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/1/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/14/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/22/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/25/2024
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
3/25/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
3/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
4/1/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
4/1/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
4/1/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
4/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
4/12/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
4/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
5/1/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
5/9/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
5/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/6/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Green Building Rough
|
6/6/2024
|
Not Ready for Inspection
|
JEROME BLACKWOOD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/14/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/17/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
6/17/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/21/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/10/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
7/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
7/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/25/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
7/31/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/13/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Verify Sprinkler Sign Off
|
8/13/2024
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
8/13/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
8/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
8/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/6/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
9/9/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/16/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/30/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
9/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/15/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/15/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
10/15/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/24/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
10/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
10/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
11/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
11/14/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
11/18/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/18/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
11/19/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/19/2024
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Green Building Rough
|
11/21/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/21/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
11/21/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
11/26/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
12/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
12/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
12/20/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
12/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/2/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/10/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/13/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/14/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/16/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/21/2025
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/23/2025
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
1/24/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
1/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
1/30/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/31/2025
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
2/12/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/24/2025
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
2/26/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
2/27/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
3/4/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
3/12/2025
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
4/4/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2025
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
5/12/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/21/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
7/24/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
T-Bar Ceiling
|
7/28/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Pre-Inspection
|
8/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
Final
|
10/14/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
10/14/2025
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
10/14/2025
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/15/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/15/2025
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
10/15/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/16/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/16/2025
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/16/2025
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
10/16/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
10/31/2025
|
OK for TCO
|
JAMES POWERS
|
|
Special/Order Compliance
|
11/1/2025
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
12/17/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
1/7/2026
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
1/7/2026
|
OK to Issue CofO
|
JAMES POWERS
|