1031 W DOWNEY WAY 90089

Certificate Information: 1031 W DOWNEY WAY 90089

Application / Permit
21010-10000-01745
Plan Check / Job No.
B21LA06607
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
NEW TYPE IA 5 STORY GINSBURG HALL COMPUTER SCIENCE BUILDING WITH 2 BASEMENT LEVELS
Permit Issued
Issued on 6/9/2022
Issuing Office
Metro
Current Status
CofO Issued on 7/11/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/30/2021 APPLICANT
Green Plans Picked Up 5/11/2021 APPLICANT
Assigned to Plan Check Engineer 5/20/2021 KEVIN MORALES
Disabled Access Plans Picked Up 5/26/2021 APPLICANT
Corrections Issued 6/2/2021 KEVIN MORALES
Quality Review Completed 6/3/2021 EUGENE BARBEAU
Applicant returned to address corrections 1/3/2022 KEVIN MORALES
Plan Check Approved 6/8/2022 KEVIN MORALES
Issued 6/9/2022 APPLICANT
TCO Issued (Expire Date: 03-04-2025) 9/5/2024 ERNESTO CORRAL
TCO Issued (Expire Date: 08-31-2025) 3/4/2025 ERNESTO CORRAL
CofO in Progress 7/11/2025 JAMES POWERS
Permit Finaled 7/11/2025 ERNESTO CORRAL
CofO Issued 7/11/2025 ERNESTO CORRAL
Permit Finaled 7/11/2025 ERNESTO CORRAL

Permit Application Clearance Information

Historic Resource Verification Cleared 6/14/2021 MICAELA TORRES-GIL
Redevelopment Project Area Cleared 6/16/2021 GISELLE CORELLA
ZA Case Cleared 6/16/2021 DENZEL HENDERSON
Eng Process Fee Ord 176,300 Cleared 6/22/2021 CELINA MORENO
Address approval Cleared 10/13/2021 THOMAS LANG
Hydrant and Access approval Cleared 2/8/2022 MATTHEW CRAIG
Green Code Cleared 2/15/2022 AARON COSTA
Fire Marshal Fire Life Safety Cleared 4/14/2022 OSCAR SALGADO JR
Low Impact Development Cleared 4/22/2022 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 5/3/2022 JEANETTE VONG
CPC Cleared 5/19/2022 KYLE WINSTON
Site Plan review Cleared 5/19/2022 KYLE WINSTON
Specific Plan Cleared 5/19/2022 KYLE WINSTON
ZA Case Cleared 5/19/2022 KYLE WINSTON
ZI Cleared 5/19/2022 KYLE WINSTON
ZI Cleared 5/19/2022 RUBEN VASQUEZ
DAS Clearance Cleared 5/20/2022 SHINE LIN
Building over 36-ft Cleared 6/2/2022 CALOSHA APPROVED
Sewer availability Cleared 6/6/2022 STEVE MELGAR

Contact Information

Contractor Turner Construction Company; Lic. No.: 210639-B 1900 S STATE COLLEGE BLVD   STE 150    ANAHEIM, CA 92806
Engineer Timmers,, Matthew; Lic. No.: S5560 950 S. GRAND AVE 4TH FLR      LOS ANGELES, CA 90015

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 6/21/2022 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 7/13/2022 Partial Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 10/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 10/14/2022 Partial Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 10/17/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Methane Barrier 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/14/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 11/14/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 11/29/2022 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/5/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 12/5/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/9/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/9/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 12/9/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 12/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/12/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 12/12/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/12/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/28/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 12/28/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/24/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/24/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 1/24/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/24/2023 Partial Approval JAMES POWERS
Green Building Rough 1/24/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/24/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/24/2023 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 1/25/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/25/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/25/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/25/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/27/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/27/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/14/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 2/14/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/14/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/14/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/24/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 2/24/2023 Conditional Approval MARTIN TAVITIAN
Deputy Steel/Welding 2/24/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/22/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 3/22/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/29/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/29/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 3/29/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/29/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/30/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/30/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 3/30/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/30/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 4/25/2023 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 4/26/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/26/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 4/26/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/26/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/26/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/4/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/4/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 5/4/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/4/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/4/2023 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 5/8/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/15/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/15/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/15/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 5/15/2023 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 5/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 5/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/18/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 5/18/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/18/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 5/18/2023 Partial Approval JAMES POWERS
Green Building Rough 5/18/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/18/2023 Partial Approval JAMES POWERS
Structural Steel Frame 5/18/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 5/18/2023 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 5/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/25/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/25/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/25/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 5/26/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/26/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/26/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 5/30/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/30/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/30/2023 Conditional Approval LARRY ARNICK
Insulation 5/30/2023 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 5/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/31/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 5/31/2023 Partial Approval LARRY ARNICK
Insulation 5/31/2023 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 6/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 6/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/2/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/2/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Fireproofing 6/5/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/7/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 6/7/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 6/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/9/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/9/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 6/14/2023 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/14/2023 Partial Approval RAFAEL ESPINOZA
Deputy Fireproofing 6/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 6/26/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 6/27/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/27/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/27/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/28/2023 Partial Approval JAMES POWERS
Insulation 6/28/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/29/2023 Partial Approval JAMES POWERS
Insulation 6/30/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/5/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/6/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2023 Partial Approval JAMES POWERS
Insulation 7/10/2023 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/18/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 7/25/2023 Partial Approval JAMES POWERS
Insulation 7/25/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 8/1/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/1/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/2/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 8/4/2023 Partial Approval JAMES POWERS
Masonry Wall/Backfill 8/8/2023 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/9/2023 Partial Approval JAMES POWERS
Masonry Wall/Backfill 8/11/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 8/14/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 8/15/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/17/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/28/2023 Not Ready for Inspection JAMES POWERS
Wall Anchors 8/29/2023 Partial Approval JAMES POWERS
Insulation 8/30/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/1/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/6/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/7/2023 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/8/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/11/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/11/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/12/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/14/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/14/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/14/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/15/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/18/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/19/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/20/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/21/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/22/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/22/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 9/25/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/27/2023 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 10/2/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/2/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/3/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/4/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/5/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/6/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/10/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/11/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/12/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/13/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/13/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/16/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/17/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/18/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/26/2023 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 10/31/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 11/1/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 11/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/3/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 11/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/7/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/7/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/14/2023 Partial Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/16/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 11/17/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 11/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/21/2023 Conditional Approval MICHAEL ROSENBERG
Interior/Exterior Lathing 11/28/2023 Not Ready for Inspection JAMES POWERS
Deputy Fireproofing 11/29/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 11/30/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/1/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/1/2023 Not Ready for Inspection JAMES POWERS
Deputy Fireproofing 12/4/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/5/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/5/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/7/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/8/2023 Partial Approval JAMES POWERS
Insulation 12/8/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/11/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/12/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/13/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/15/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/18/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/19/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/19/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/20/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/28/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 12/29/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 1/2/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 1/3/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 1/4/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/17/2024 Not Ready for Inspection JAMES POWERS
Interior/Exterior Lathing 1/22/2024 Partial Inspection GREGORY POMISH
Deputy Fireproofing 1/24/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 1/25/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 1/26/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/26/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 1/29/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 1/30/2024 Partial Approval JAMES POWERS
Drywall Nailing 1/30/2024 Partial Approval JAMES POWERS
Green Building Rough 1/30/2024 Approved JAMES POWERS
Light Gage Steel Frame 1/30/2024 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 2/1/2024 Partial Approval GREGORY POMISH
Drywall Nailing 2/12/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/14/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/15/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/16/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/20/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/21/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/23/2024 Partial Approval JAMES POWERS
Drywall Nailing 2/26/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/26/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/27/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/27/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/28/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 2/29/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/1/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/5/2024 Partial Approval JAMES POWERS
Interior/Exterior Lathing 3/5/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/6/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/7/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/8/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/11/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/12/2024 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/15/2024 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/18/2024 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/19/2024 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/20/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 3/20/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/21/2024 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/21/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/22/2024 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/22/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/26/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/27/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 3/28/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 4/4/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 4/9/2024 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/10/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/10/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 4/11/2024 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/11/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/11/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 4/12/2024 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/12/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 4/15/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 4/15/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 4/16/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 4/17/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 4/23/2024 Not Ready for Inspection JAMES POWERS
Insulation 4/24/2024 Not Ready for Inspection JAMES POWERS
T-Bar Ceiling 4/26/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 4/30/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/2/2024 Partial Approval JAMES POWERS
Pre-Inspection 5/3/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 5/13/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/21/2024 Partial Approval LARRY ARNICK
Insulation 5/23/2024 Partial Inspection LARRY ARNICK
Light Gage Steel Frame 5/24/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 5/29/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/31/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 6/10/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 6/14/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 6/21/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/24/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/27/2024 Partial Approval JAMES POWERS
Insulation 6/28/2024 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 7/2/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/9/2024 Not Ready for Inspection JAMES POWERS
Insulation 7/12/2024 Not Ready for Inspection JAMES POWERS
Drywall Nailing 7/26/2024 Approved JAMES POWERS
Final 7/26/2024 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 7/26/2024 Approved JAMES POWERS
Green Building Final 7/26/2024 Approved JAMES POWERS
Insulation 7/26/2024 Approved JAMES POWERS
Reinforced Concrete Frame 7/26/2024 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 7/26/2024 SGSOV Not Ready JAMES POWERS
Smoke Detectors 7/26/2024 Approved JAMES POWERS
Structural Steel Frame 7/26/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 7/26/2024 Not Ready for Inspection JAMES POWERS
Final 8/2/2024 No Result Entered ERNESTO CORRAL
Light Gage Steel Frame 8/2/2024 Approved JAMES POWERS
Reinforced Concrete Frame 8/2/2024 No Result Entered ERNESTO CORRAL
SGSOV-Seismic Gas S/O Valve 8/2/2024 No Result Entered ERNESTO CORRAL
Structural Steel Frame 8/2/2024 No Result Entered ERNESTO CORRAL
Verify Sprinkler Sign Off 8/2/2024 Approved JAMES POWERS
Verify Sprinkler Sign Off 8/2/2024 No Result Entered ERNESTO CORRAL
Final 8/5/2024 OK for TCO JAMES POWERS
Reinforced Concrete Frame 8/5/2024 Not Ready for Inspection JAMES POWERS
SGSOV-Seismic Gas S/O Valve 8/5/2024 SGSOV No Gas JAMES POWERS
Structural Steel Frame 8/5/2024 Not Ready for Inspection JAMES POWERS
Final 8/14/2024 OK for TCO JAMES POWERS
Insulation 8/14/2024 Approved JAMES POWERS
Special/Order Compliance 2/4/2025 Approved JAMES POWERS
Deputy Fireproofing 7/11/2025 Partial Approval JAMES POWERS
Deputy Methane Barrier 7/11/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/11/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/11/2025 Partial Approval JAMES POWERS
Final 7/11/2025 OK to Issue CofO JAMES POWERS