15200 W BLEDSOE ST 91342

Certificate Information: 15200 W BLEDSOE ST 91342

Application / Permit
21010-10000-01637
Plan Check / Job No.
B21LA06196
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(8) Garage - Public
Work Description
NEW 6-LEVEL CAST-IN-PLACE CONCRETE OPEN PARKING STRUCTURE WITH POST PRODUCTION AND RESTAURANT SPACE, CORE & SHELL ONLY FOR POST PRODUCTION AREA AND RESTAURANT.
Permit Issued
Issued on 4/12/2022
Issuing Office
Metro
Current Status
Issued on 4/12/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/11/2021 APPLICANT
Assigned to Plan Check Engineer 5/20/2021 LARRY LEE
Plans on Hold 5/20/2021 ALLEN MANALANSAN
Hold Released 6/9/2021 ALLEN MANALANSAN
Disabled Access Plans Picked Up 6/10/2021 APPLICANT
Corrections Issued 6/18/2021 LARRY LEE
Quality Review Completed 6/28/2021 SAI KHUM
Applicant returned to address corrections 7/20/2021 LARRY LEE
Applicant returned to address corrections 8/3/2021 LARRY LEE
Applicant returned to address corrections 8/10/2021 LARRY LEE
Applicant returned to address corrections 8/24/2021 LARRY LEE
Applicant returned to address corrections 8/25/2021 LARRY LEE
Applicant returned to address corrections 8/30/2021 LARRY LEE
Green Plans Picked Up 9/15/2021 APPLICANT
Applicant returned to address corrections 12/9/2021 LARRY LEE
Applicant returned to address corrections 2/15/2022 LARRY LEE
Plan Check Approved 3/23/2022 LARRY LEE
Issued 4/12/2022 APPLICANT
Building Plans Picked Up 9/27/2022 APPLICANT

Permit Application Clearance Information

ZA Case Cleared 6/18/2021 LAUREN PADICK
Miscellaneous Cleared 7/16/2021 DANIEL CORONADO
Miscellaneous Cleared 7/16/2021 DANIEL CORONADO
Tract Map conditions Cleared 7/16/2021 DANIEL CORONADO
Prkng lot landscape/Water mgmt Cleared 7/22/2021 DANIEL CORONADO
Permit Cleared 7/27/2021 GABRIEL ROBLES
Building over 36-ft Cleared 8/24/2021 CALOSHA APPROVED
Eng Process Fee Ord 176,300 Cleared 9/1/2021 GABRIEL ROBLES
Sewer availability Cleared 11/1/2021 CARLOS AGUILERA
Green Code Cleared 11/2/2021 LARRY LEE
Hydrant and Access approval Cleared 11/15/2021 KURT CORRAL
Trees in Parkway Cleared 12/15/2021 ADALBERTO VERA
Construction near power lines Cleared 12/16/2021 WALTER RAMIREZ
Metro Rail approval Cleared 12/23/2021 LARRY LEE
Food Service Establishment Cleared 12/29/2021 RAMESHBHAIR PATEL
Highway dedication Cleared 1/11/2022 LEE GUILBEAUX
Fire Marshal Fire Life Safety Cleared 1/31/2022 ANDREW KO
Driveway location Cleared 2/18/2022 SHEILA AHORAIAN
Internal circulation Cleared 2/18/2022 SHEILA AHORAIAN
Low Impact Development Cleared 2/24/2022 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 2/24/2022 JOHN LIN
DAS Clearance Cleared 3/10/2022 LARRY LEE

Contact Information

Architect Minyard,, Charles Nolan; Lic. No.: C33826 650 NORTH CANBRIDGE      ORANGE, CA 92867
Contractor Bomel Construction Co Inc; Lic. No.: 265409-B 96 CORPORATE PARK      IRVINE, CA 92606
Engineer King,, Darren; Lic. No.: S5254 3182 SESPE CREEK WAY      CHICO, CA 95973

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/14/2022 Partial Inspection DANNY RODRIGUEZ
Deputy Grading 4/20/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 4/27/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 4/29/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/29/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/29/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/2/2022 Partial Approval DANNY RODRIGUEZ
Deputy Grading 5/5/2022 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/5/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/6/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/9/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/10/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/13/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/17/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/17/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/18/2022 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 5/19/2022 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/24/2022 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 5/24/2022 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 5/25/2022 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Masonry Frame 5/31/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/3/2022 Partial Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/17/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/21/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/27/2022 Partial Inspection DANNY RODRIGUEZ
Green Building Rough 6/27/2022 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 6/27/2022 Partial Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 6/27/2022 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/28/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/30/2022 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 7/19/2022 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 8/2/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/18/2022 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/19/2022 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 8/22/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/23/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/24/2022 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/26/2022 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/29/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/1/2022 Corrections Issued DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/2/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/2/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/8/2022 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/9/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/9/2022 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Masonry Frame 9/9/2022 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/12/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/13/2022 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/14/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/14/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/15/2022 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/16/2022 Conditional Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 9/19/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 9/21/2022 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 9/29/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/29/2022 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 9/29/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 10/3/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/3/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 10/4/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/4/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 10/6/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/6/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/7/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/11/2022 Partial Inspection DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 10/12/2022 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 10/13/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/13/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 10/14/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/14/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/14/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/18/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/18/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/20/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/21/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/25/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/26/2022 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/26/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 10/28/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/28/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/4/2022 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/7/2022 Partial Approval DANNY RODRIGUEZ
Deputy Other (see comments) 11/9/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/9/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/9/2022 Partial Approval DANNY RODRIGUEZ
Deputy Other (see comments) 11/10/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/10/2022 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/14/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/15/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/15/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/16/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/17/2022 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/17/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/18/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 11/22/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/22/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 11/23/2022 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/29/2022 Not Ready for Inspection JOHN KITCKO
Deputy Pre-Stress Concrete 11/30/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/30/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/30/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/1/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/1/2022 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/1/2022 Partial Inspection ANDREW DORSO
Special/Order Compliance 12/1/2022 Partial Inspection DEANDRE HOFFMAN
Deputy Pre-Stress Concrete 12/2/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/2/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/5/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/5/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/6/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/6/2022 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 12/6/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/7/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/7/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/7/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/12/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/13/2022 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 12/13/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/14/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/14/2022 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 12/14/2022 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/15/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/15/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/15/2022 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/16/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/16/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/19/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/19/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 12/20/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/20/2022 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 12/20/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/22/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/23/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/27/2022 Conditional Approval DANIEL VARNUM
Deputy Reinf. Masonry 12/30/2022 Conditional Approval ANDREW DORSO
Reinforced Masonry Frame 1/4/2023 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 2/9/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/9/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/10/2023 No Access for Inspection DANIEL VARNUM
Deputy Pre-Stress Concrete 2/10/2023 No Access for Inspection DANIEL VARNUM
Deputy Reinf. Concrete 2/10/2023 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 2/13/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/13/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/13/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/14/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/14/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/14/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/14/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/15/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/15/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/15/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/16/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/16/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/16/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/16/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/21/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/21/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/21/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/21/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/22/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/22/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/22/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/23/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/23/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/23/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/23/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/24/2023 Conditional Approval STEVEN LEVITT
Deputy Pre-Stress Concrete 2/24/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/24/2023 Conditional Approval STEVEN LEVITT
Deputy Drilled-In Anchors 2/27/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/27/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/27/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/27/2023 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/27/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/28/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 2/28/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/28/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/1/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/1/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/1/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/2/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/2/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/2/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 3/2/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/2/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/3/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/3/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/3/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/6/2023 Approved DANNY RODRIGUEZ
Deputy Other (see comments) 3/6/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/6/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/6/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/6/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/7/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/7/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/7/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/7/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/8/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/8/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/8/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/9/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/9/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/9/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/10/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/10/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/10/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/13/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/13/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/13/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/13/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/14/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/14/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/14/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/14/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/15/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/15/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/15/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/15/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/16/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/16/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/16/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/17/2023 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 3/17/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 3/17/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 3/17/2023 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 3/20/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/20/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/20/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/21/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/21/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/21/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/22/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/22/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/22/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/22/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/23/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/23/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/23/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/24/2023 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/24/2023 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/24/2023 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/28/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/28/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/28/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/28/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/28/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/29/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/29/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/29/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/29/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 3/29/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/30/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/30/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/30/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/30/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/30/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/31/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/31/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/31/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/3/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/3/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/3/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/4/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/4/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/4/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/5/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/5/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/5/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/6/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/6/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/6/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/7/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/7/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/7/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/7/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/10/2023 Conditional Approval RICKEY JACKSON
Deputy Pre-Stress Concrete 4/10/2023 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 4/10/2023 Conditional Approval RICKEY JACKSON
Deputy Drilled-In Anchors 4/11/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/11/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/11/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/12/2023 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 4/12/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 4/12/2023 Approved JOHN KITCKO
Deputy Drilled-In Anchors 4/13/2023 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 4/13/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/13/2023 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 4/14/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/14/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/14/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 4/14/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/17/2023 Conditional Approval CAMERON CHABAN
Deputy Drilled-In Anchors 4/18/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/18/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/18/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 4/18/2023 Partial Approval CAMERON CHABAN
Deputy Drilled-In Anchors 4/19/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/19/2023 Conditional Approval CAMERON CHABAN
Deputy Drilled-In Anchors 4/20/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/20/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/20/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/21/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/21/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/21/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/21/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/24/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/24/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/24/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/25/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/25/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/25/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/25/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/26/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/26/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/26/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/27/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 4/27/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/27/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/1/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/1/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/1/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/1/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/2/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/2/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/2/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/3/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/3/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/3/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/3/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/4/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/4/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/4/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/5/2023 Conditional Approval JOHN KITCKO
Deputy Pre-Stress Concrete 5/5/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 5/5/2023 Conditional Approval JOHN KITCKO
Deputy Drilled-In Anchors 5/8/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/8/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/8/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/9/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/9/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/9/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/10/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/10/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/10/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/11/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/11/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/11/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/12/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/12/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/12/2023 Approved DANNY RODRIGUEZ
Green Building Rough 5/12/2023 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 5/12/2023 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 5/12/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/15/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 5/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/15/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 5/16/2023 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 5/16/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/17/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/17/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/17/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 5/17/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/18/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/18/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/18/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 5/18/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/19/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 5/19/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/19/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 5/19/2023 Conditional Approval DANNY RODRIGUEZ
Green Building Rough 5/19/2023 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 5/19/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 5/19/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/22/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Steel/Welding 5/23/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/24/2023 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 5/25/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/26/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/30/2023 Conditional Approval BRIAN KELLY
Deputy Reinf. Concrete 5/30/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 5/30/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 5/31/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 6/1/2023 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/2/2023 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/5/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 6/6/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/7/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/8/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/8/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/9/2023 Conditional Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 6/9/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/12/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 6/13/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/13/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/14/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/15/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 6/15/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/16/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/20/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 6/20/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/21/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/22/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Steel/Welding 6/23/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/26/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 6/27/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/27/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 6/27/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/28/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/29/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/30/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/3/2023 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/5/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/6/2023 Conditional Approval DANNY RODRIGUEZ
Green Building Rough 7/6/2023 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 7/6/2023 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 7/6/2023 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 7/6/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 7/7/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/10/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 7/10/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/22/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/23/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/24/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/25/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/28/2023 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 9/5/2023 Conditional Approval ANDREW DORSO
Light Gage Steel Frame 9/5/2023 Partial Inspection ANDREW DORSO
Reinforced Concrete Frame 9/5/2023 Partial Inspection ANDREW DORSO
Verify Sprinkler Sign Off 9/5/2023 Not Ready for Inspection ANDREW DORSO
Deputy Drilled-In Anchors 9/7/2023 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 9/7/2023 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 9/12/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 9/13/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 9/14/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 9/15/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/22/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 9/22/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/26/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/27/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/28/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/29/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/3/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/3/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/4/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/4/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/5/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/5/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/6/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/6/2023 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 10/10/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/10/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/11/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/11/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/12/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/12/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/13/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/13/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/16/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/23/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/24/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/25/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/26/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/27/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Fireproofing 12/5/2023 Approved DANNY RODRIGUEZ
Insulation 1/16/2024 Partial Approval DANNY RODRIGUEZ
Insulation 3/12/2024 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 5/20/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 6/10/2024 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 8/1/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 8/2/2024 Conditional Approval DANNY RODRIGUEZ