448 S SAN PEDRO ST 1-98 90013

Certificate Information: 448 S SAN PEDRO ST 1-98 90013

Application / Permit
21010-10000-01448
Plan Check / Job No.
B21LA05652
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 5 STORY TYPE IIIA 98 UNITS (5 ELI, 6 VLI, 86 LI, ONE MANAGER UNIT) 100% AFFORDABLE HOUSING APARTMENT OVER 1 LEVEL TYPE IA SUBTERRANEAN PARKING, PER MEASURE JJJ
Permit Issued
Issued on 3/20/2025
Issuing Office
Metro
Current Status
Issued on 3/20/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 3/5/2025 VU NGUYEN
Issued 3/20/2025 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/17/2024 ADRIAN SANCHEZ
Address approval Cleared 9/27/2024 JESSICA OPINION
Sewer availability Cleared 12/18/2024 JESSICA OPINION
Low Impact Development Cleared 12/27/2024 SARAH YOUSSEF
Work Adjacent to Public Way Cleared 12/30/2024 ALEXANDER PHAM
Hydrant and Access approval Cleared 1/2/2025 LAVEON RIDER
Roof/Waste drainage to street Cleared 1/3/2025 ABEL CASILLAS
Public Housing Cleared 1/15/2025 JESUS VALDEZ JR
Green Code Cleared 1/30/2025 AARON COSTA
Permit Cleared 2/4/2025 MATIAS FARFAN
Trees in Parkway Cleared 2/11/2025 MIGUEL ORNELAS
Historic Resource Verification Cleared 2/18/2025 YASMINE BASHIRI
Miscellaneous Cleared 2/18/2025 YASMINE BASHIRI
Redevelopment Project Area Cleared 2/18/2025 YASMINE BASHIRI
City owned building/parcel Cleared 2/20/2025 HAROOT AVANESIA
Highway dedication Cleared 2/20/2025 JUSTIN BICOL
DAS Clearance Cleared 2/22/2025 VU NGUYEN
"D" conditions Cleared 2/24/2025 ALEX VELA
Miscellaneous Cleared 2/24/2025 ALEX VELA
Frnt yard landscape/Water mgmt Cleared 2/26/2025 ALEX VELA
Opn space landscape/Water mgmt Cleared 2/26/2025 ALEX VELA
CPC Cleared 3/3/2025 ALEX VELA
Density Bonus 14.00.A.13 Cleared 3/3/2025 JULIE LIEU
Fire Marshal Fire Life Safety Cleared 3/3/2025 MENOA AGHAJANI
Site Plan review Cleared 3/3/2025 ALEX VELA
Miscellaneous Cleared 3/4/2025 ALEX VELA

Contact Information

Architect Arnold,, John Howard; Lic. No.: C30834 2166 W 30TH STREET      LOS ANGELES, CA 90018
Contractor United Building Company Inc; Lic. No.: 1034972-B 250 N. HARBOR DRIVE   SUITE 311    REDONDO BEACH, CA 90277
Engineer Berliner,, Neal David; Lic. No.: GE2576 4913 MONUMENT ST      SIMI VALLEY, CA 93063
Engineer Weldon,, Kelly; Lic. No.: S5780 24305 LA MONTURA DR.      VALENCIA, CA 91354

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/29/2025 Partial Inspection NICK DANERI
Piling/Pier/Caisson 5/19/2025 Partial Approval RAFAEL CORTES
Pre-Inspection 5/23/2025 Partial Approval RAFAEL CORTES
Piling/Pier/Caisson 6/5/2025 Not Ready for Inspection RAFAEL CORTES
Piling/Pier/Caisson 6/20/2025 Partial Inspection RAFAEL ESPINOZA
Piling/Pier/Caisson 7/7/2025 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/17/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 7/17/2025 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 7/23/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 7/24/2025 Conditional Approval JOEY BUCHANAN
Deputy Reinf. Concrete 7/25/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 7/25/2025 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 7/31/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 8/6/2025 Conditional Approval RAFAEL CORTES
Deputy Shotcrete 8/6/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/6/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 8/7/2025 Conditional Approval RAFAEL CORTES
Deputy Shotcrete 8/7/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/7/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 8/8/2025 Conditional Approval RAFAEL CORTES
Deputy Shotcrete 8/8/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/8/2025 Not Ready for Inspection RAFAEL CORTES
Deputy Reinf. Concrete 8/11/2025 Conditional Approval RAFAEL CORTES
Deputy Shotcrete 8/11/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/11/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 8/13/2025 Conditional Approval RAFAEL CORTES
Deputy Shotcrete 8/13/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/13/2025 Partial Approval RAFAEL CORTES
Deputy Shotcrete 8/18/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/18/2025 No Access for Inspection RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/19/2025 Partial Inspection RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/20/2025 No Access for Inspection RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/20/2025 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/21/2025 No Access for Inspection RAFAEL CORTES
METHANE-Barrier 8/21/2025 Approved RAFAEL CORTES
METHANE-Subgrade 8/21/2025 Approved RAFAEL CORTES
Deputy Reinf. Concrete 8/22/2025 Conditional Approval RONALD JIMENEZ
Deputy Shotcrete 8/22/2025 Conditional Approval RONALD JIMENEZ
Reinforced Concrete Frame 8/22/2025 Partial Approval RONALD JIMENEZ
Deputy Shotcrete 8/26/2025 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/26/2025 Partial Approval LARRY ARNICK
Green Building Rough 8/27/2025 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 8/27/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 8/27/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 8/27/2025 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 8/29/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 8/29/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 9/2/2025 Conditional Approval RAFAEL CORTES
Deputy Shotcrete 9/2/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 9/2/2025 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 9/22/2025 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 10/9/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 10/17/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 10/17/2025 Not Ready for Inspection RAFAEL CORTES
Deputy Reinf. Concrete 10/31/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 10/31/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 11/17/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 11/17/2025 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 11/21/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 11/26/2025 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/26/2025 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/26/2025 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/8/2026 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 1/8/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 1/16/2026 Conditional Approval RAFAEL CORTES
Deputy Shotcrete 1/16/2026 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 1/16/2026 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 1/22/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 2/13/2026 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/13/2026 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/25/2026 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 2/26/2026 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 2/26/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 3/2/2026 Conditional Approval RONALD JIMENEZ
Structural Steel Frame 3/2/2026 Not Ready for Inspection RONALD JIMENEZ
Deputy Wood Construction 3/25/2026 Conditional Approval RAFAEL CORTES
Wood Frame 3/25/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Masonry 3/26/2026 Conditional Approval RAFAEL CORTES
Deputy Wood Construction 3/26/2026 Conditional Approval RAFAEL CORTES
Masonry Wall/Backfill 3/26/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Masonry 3/31/2026 Conditional Approval RONALD JIMENEZ
Masonry Wall/Backfill 3/31/2026 Partial Approval RONALD JIMENEZ
Deputy Reinf. Masonry 4/3/2026 Conditional Approval RONALD JIMENEZ
Masonry Wall/Backfill 4/3/2026 Partial Approval RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 4/16/2026 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 4/28/2026 Partial Approval RONALD JIMENEZ
Deputy Reinf. Concrete 4/29/2026 Conditional Approval RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 4/29/2026 Partial Approval RONALD JIMENEZ
Masonry Wall/Backfill 5/1/2026 Partial Approval PAUL BAZERKANIAN
Floor/Roof Diaphrgm/Shear Wall 5/5/2026 Not Ready for Inspection RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 5/13/2026 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 6/3/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 6/10/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 6/11/2026 Not Ready for Inspection RONALD JIMENEZ
Light Gage Steel Frame 6/16/2026 Partial Approval PAUL BAZERKANIAN