13134 N GLENOAKS BLVD 91342

Certificate Information: 13134 N GLENOAKS BLVD 91342

Application / Permit
21010-10000-01055
Plan Check / Job No.
B21LA03975
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
PROPOSED ONE STORY A.D.U. AT REAR OF LOT PER STATE LAW. CONSTRUCTION PER W.F.P.P. “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.”
Permit Issued
Issued on 10/5/2021
Issuing Office
Current Status
CofO Issued on 11/12/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/3/2021 APPLICANT
Assigned to Plan Check Engineer 3/8/2021 LAWRENCE QUIRANTE
Corrections Issued 3/9/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 5/18/2021 ADAM HEGAZI
Applicant returned to address corrections 9/5/2021 TSE MING HUANG
Plan Check Approved 9/24/2021 FERNANDO FLORES
Building Plans Picked Up 9/27/2021 APPLICANT
Issued 10/5/2021 APPLICANT
CofO in Progress 11/2/2022 ARAM AVEDISIAN
CofO Issued 11/12/2022 MICHAEL SMITH
Permit Finaled 11/12/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 3/16/2021 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 3/16/2021 GABRIEL ROBLES
Sewer availability Cleared 3/17/2021 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 3/22/2021 GABRIEL ROBLES
Hydrant and Access approval Cleared 8/13/2021 MATTHEW CRAIG

Contact Information

Contractor Homescapes Design And Construction Inc; Lic. No.: 1055222-B 16133 VENTURA BLVD SUITE 700      ENCINO, CA 91436

Inspector Information

KEVIN BERBERYAN, (818) 374-9931 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/13/2021 Corrections Issued JOHN HAYES
PLUMBING-Rough 10/13/2021 Not Ready for Inspection JOHN HAYES
Footing/Foundation/Slab 10/19/2021 Approved JOHN HAYES
PLUMBING-Rough 10/19/2021 Approved JOHN HAYES
Floor/Roof Diaphrgm/Shear Wall 11/3/2021 Partial Approval JOHN HAYES
BUILDING-Rough-Frame 11/12/2021 Corrections Issued JOHN HAYES
ELECTRICAL-Rough 11/12/2021 Not Ready for Inspection JOHN HAYES
Green Building Rough 11/12/2021 Not Ready for Inspection JOHN HAYES
HVAC-Rough 11/12/2021 Not Ready for Inspection JOHN HAYES
Interior/Exterior Lathing 11/12/2021 Not Ready for Inspection JOHN HAYES
PLUMBING-Rough 11/12/2021 Not Ready for Inspection JOHN HAYES
Verify Sprinkler Sign Off 11/12/2021 Not Ready for Inspection JOHN HAYES
Rough-Elec/Plmb/HVAC 11/30/2021 Not Ready for Inspection JOHN HAYES
Shower Pan 11/30/2021 Approved JOHN HAYES
BUILDING-Rough-Frame 12/9/2021 Partial Approval JOHN HAYES
ELECTRICAL-Rough 12/9/2021 Not Ready for Inspection JOHN HAYES
Green Building Rough 12/9/2021 Partial Approval JOHN HAYES
HVAC-Rough 12/9/2021 Not Ready for Inspection JOHN HAYES
PLUMBING-Rough 12/9/2021 Not Ready for Inspection JOHN HAYES
Verify Sprinkler Sign Off 12/9/2021 Approved JOHN HAYES
BUILDING-Rough-Frame 12/14/2021 Approved JESUS RODRIGUEZ
ELECTRICAL-Rough 12/14/2021 Approved JESUS RODRIGUEZ
Green Building Rough 12/14/2021 Approved JESUS RODRIGUEZ
HVAC-Rough 12/14/2021 Conditional Approval JESUS RODRIGUEZ
Insulation 12/14/2021 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 12/14/2021 Approved JESUS RODRIGUEZ
PLUMBING-Rough 12/14/2021 Approved JESUS RODRIGUEZ
Drywall Nailing 12/17/2021 Approved JOHN HAYES
Underground Mechanical 1/5/2022 Partial Approval JOHN HAYES
Underground Mechanical 1/11/2022 Partial Approval JOHN HAYES
ELECTRICAL-Final 2/22/2022 Not Ready for Inspection JOHN HAYES
Final 2/22/2022 Corrections Issued JOHN HAYES
Green Building Final 2/22/2022 Not Ready for Inspection JOHN HAYES
HVAC-Final 2/22/2022 Not Ready for Inspection JOHN HAYES
PLUMBING-Final 2/22/2022 Not Ready for Inspection JOHN HAYES
SGSOV-Seismic Gas S/O Valve 2/22/2022 SGSOV Not Ready JOHN HAYES
Service/Power Release 2/22/2022 Not Ready for Inspection JOHN HAYES
Smoke Detectors 2/22/2022 Not Ready for Inspection JOHN HAYES
ELECTRICAL-Final 4/22/2022 Not Ready for Inspection JOHN HAYES
Final 4/22/2022 Corrections Issued JOHN HAYES
Green Building Final 4/22/2022 Not Ready for Inspection JOHN HAYES
HVAC-Final 4/22/2022 Not Ready for Inspection JOHN HAYES
PLUMBING-Final 4/22/2022 Not Ready for Inspection JOHN HAYES
SGSOV-Seismic Gas S/O Valve 4/22/2022 SGSOV Not Ready JOHN HAYES
Service/Power Release 4/22/2022 Not Ready for Inspection JOHN HAYES
Smoke Detectors 4/22/2022 Not Ready for Inspection JOHN HAYES
ELECTRICAL-Final 10/27/2022 Approved ARAM AVEDISIAN
Final 10/27/2022 Corrections Issued ARAM AVEDISIAN
Green Building Final 10/27/2022 Approved ARAM AVEDISIAN
HVAC-Final 10/27/2022 Approved ARAM AVEDISIAN
PLUMBING-Final 10/27/2022 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 10/27/2022 SGSOV Approved ARAM AVEDISIAN
Smoke Detectors 10/27/2022 Approved ARAM AVEDISIAN
Final 11/2/2022 OK to Issue CofO ARAM AVEDISIAN
Service/Power Release 11/2/2022 Approved ARAM AVEDISIAN