2460 E 24TH ST 90058

Certificate Information: 2460 E 24TH ST 90058

Application / Permit
21010-10000-00891
Plan Check / Job No.
B21LA03207
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(12) Manufacturing
Work Description
NEW ONE STORY CONCRETE TILT UP SOLID WASTE TRANSFER & PROCESSING FACILITY.
Permit Issued
Issued on 11/17/2021
Issuing Office
Metro
Current Status
Issued on 11/17/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 2/24/2021 APPLICANT
Assigned to Plan Check Engineer 3/18/2021 GARO TELMI
Corrections Issued 3/22/2021 GARO TELMI
Quality Review Completed 3/30/2021 KEN GILL
Disabled Access Plans Picked Up 4/22/2021 APPLICANT
Green Plans Picked Up 5/11/2021 APPLICANT
Applicant returned to address corrections 5/25/2021 GARO TELMI
Applicant returned to address corrections 6/3/2021 GARO TELMI
Applicant returned to address corrections 8/31/2021 GARO TELMI
Applicant returned to address corrections 9/28/2021 GARO TELMI
Applicant returned to address corrections 10/29/2021 GARO TELMI
Plan Check Approved 11/10/2021 GARO TELMI
Building Plans Picked Up 11/16/2021 APPLICANT
Issued 11/17/2021 APPLICANT

Permit Application Clearance Information

Address approval Cleared 4/12/2021 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 4/12/2021 JEANIE LAM
Metro Rail approval Cleared 4/30/2021 GARO TELMI
Green Code Cleared 5/6/2021 AARON COSTA
Trees in Parkway Cleared 5/11/2021 JOHN KIM
Hydrant and Access approval Cleared 6/2/2021 MATTHEW CRAIG
Highway dedication Cleared 6/23/2021 JEANIE LAM
Bicycle Parking Cleared 7/14/2021 JEREMY CHOK
Construction near power lines Cleared 8/13/2021 RIDWAN HARDY
Miscellaneous Cleared 9/9/2021 MSTAFA AL-MSARI
Low Impact Development Cleared 9/14/2021 MITESH PATEL
Internal circulation Cleared 9/19/2021 MOHAMMAD HASAN
Encroachment in public way Cleared 10/12/2021 JEREMY CHOK
DAS Clearance Cleared 10/14/2021 GARO TELMI
Sewer availability Cleared 10/19/2021 RENZ SORIANO
Drainage to Storm Drain Cleared 10/21/2021 BIJAN ZADEH
Permit Cleared 10/21/2021 BIJAN ZADEH
Roof/Waste drainage to street Cleared 10/21/2021 BIJAN ZADEH
Miscellaneous Cleared 10/25/2021 ANNA VIDAL
Prkng lot landscape/Water mgmt Cleared 10/25/2021 ANNA VIDAL
ZI Cleared 10/25/2021 ANNA VIDAL
Work Adjacent to Public Way Cleared 11/4/2021 JOSE RODRIGUEZ
Building over 36-ft Cleared 11/10/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/10/2021 CALOSHA APPROVED

Contact Information

Architect Simon,, Matthew Evans; Lic. No.: C29326 3956 GUNDRY AVENUE      LONG BEACH, CA 90807
Contractor Ryan Davidson Construction; Lic. No.: 960161-B 2834 HAMNER AVE #527      NORCO, CA 92860
Engineer Babayan,, Raffi Samuel; Lic. No.: C72168 7718 DAY STREET      LOS ANGELES, CA 91042
Engineer Bushra,, Rafeek L; Lic. No.: S4490 2564 W WOODLAND DR      ANAHEIM, CA 92801
Engineer Kirk,, Matthew Leo; Lic. No.: C51619 17520 NEWHOPE STREET SUITE 140      FOUNTAIN VALLEY, CA 92708

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/29/2021 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 11/29/2021 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 12/6/2021 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/6/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/27/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 12/27/2021 Partial Approval NICK DANERI
Deputy Reinf. Masonry 1/3/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/4/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/5/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/6/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/6/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 1/6/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/11/2022 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 1/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/11/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 1/11/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/12/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 1/12/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/13/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/18/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 1/18/2022 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 1/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/20/2022 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 1/20/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/21/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 1/21/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/25/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/25/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 1/25/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/27/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/27/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 1/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/2/2022 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/2/2022 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/2/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/3/2022 Conditional Approval RAFAEL ESPINOZA
Pre-Inspection 2/3/2022 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/4/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/10/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 2/11/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/16/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/17/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/22/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/22/2022 Partial Approval TED RIES
Deputy Reinf. Masonry 2/23/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/23/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/1/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/1/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 3/1/2022 Partial Approval RAFAEL ESPINOZA
Structural Steel Frame 3/1/2022 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/1/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/2/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/3/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/3/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/3/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 3/3/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/4/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/4/2022 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/8/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/8/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 3/8/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/8/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/9/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/11/2022 Conditional Approval NICK DANERI
Reinforced Masonry Frame 3/11/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 3/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/16/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/16/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 3/16/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/17/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 3/17/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/18/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 3/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/22/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/22/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 3/22/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 3/25/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 3/25/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 3/25/2022 Conditional Approval NICK DANERI
Pre-Inspection 3/25/2022 Partial Inspection NICK DANERI
Deputy Steel/Welding 3/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/30/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 3/30/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 3/31/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/4/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 4/4/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/4/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/5/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 4/5/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/6/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/7/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 4/7/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/8/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 4/8/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 4/12/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/13/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/14/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/14/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 4/14/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/18/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 4/18/2022 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/20/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/21/2022 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 5/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/25/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/23/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 6/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/27/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Other (see comments) 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 10/4/2022 Conditional Approval MICHAEL ROSENBERG
Pre-Inspection 12/5/2022 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 9/25/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 4/8/2026 Partial Inspection RONALD JIMENEZ
Pre-Inspection 5/6/2026 Corrections Issued RONALD JIMENEZ