935 N MICHELTORENA ST 90026

Certificate Information: 935 N MICHELTORENA ST 90026

Application / Permit
21010-10000-00872
Plan Check / Job No.
B21LA03130
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
PROPOSED NEW DETACHED ADU IN HILLSIDE PER ENGINEER DESIGN, NFPA 13D THRU OUT (1200 SF MAX PER ORDINANCE, 12.22A 33 (C)-(D))
Permit Issued
Issued on 6/17/2021
Issuing Office
Current Status
CofO Issued on 4/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/23/2021 APPLICANT
Assigned to Plan Check Engineer 2/25/2021 AUNG SOE
Corrections Issued 3/4/2021 AUNG SOE
Quality Review Completed 3/8/2021 EUGENE BARBEAU
Plan Check Approved 6/9/2021 AUNG SOE
Issued 6/17/2021 APPLICANT
Building Plans Picked Up 6/18/2021 APPLICANT
CofO in Progress 3/30/2022 STUART CHAPMAN
Permit Finaled 4/1/2022 DEROLD HAUFF
CofO Issued 4/1/2022 DEROLD HAUFF
Permit Finaled 4/1/2022 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/31/2021 JEANIE LAM
Address approval Cleared 4/7/2021 RENZ SORIANO
Grading Pre-Inspection Cleared 4/7/2021 AUNG SOE
Roof/Waste drainage to street Cleared 4/7/2021 RENZ SORIANO
Sewer availability Cleared 4/15/2021 PAMELA TENEZA
Hydrant and Access approval Cleared 5/18/2021 KURT CORRAL

Contact Information

Architect Sabikhi,, Sidhartha; Lic. No.: C32564 923 E. 3RD STREET SUITE 100      LOS ANGELES, CA 90013
Contractor Owner-Builder       ,
Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Other (see comments) 6/22/2021 Approved WILLIAM WREN
Excavation/Setback/Form/Re-Bar 6/24/2021 Approved ROBERT VORHIS
Piling/Pier/Caisson 6/24/2021 Approved ROBERT VORHIS
Deputy Reinf. Concrete 6/25/2021 Conditional Approval ROBERT VORHIS
Excavation/Setback/Form/Re-Bar 6/30/2021 Approved ROBERT VORHIS
Deputy Reinf. Concrete 7/2/2021 Conditional Approval ROBERT VORHIS
PLUMBING-Rough 7/13/2021 Partial Inspection ROBERT VORHIS
Excavation/Setback/Form/Re-Bar 7/22/2021 Approved ROBERT VORHIS
Footing/Foundation/Slab 7/22/2021 Approved ROBERT VORHIS
Floor/Roof Diaphrgm/Shear Wall 12/2/2021 Not Ready for Inspection SHAVONNE ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/7/2021 Approved ALIZAH MAYAGOITIA
Rough-Elec/Plmb/HVAC 12/7/2021 Corrections Issued ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 12/10/2021 Approved STUART CHAPMAN
Green Building Rough 12/10/2021 Approved STUART CHAPMAN
Interior/Exterior Lathing 12/10/2021 Partial Approval STUART CHAPMAN
Verify Sprinkler Sign Off 12/10/2021 Approved STUART CHAPMAN
Floor/Roof Diaphrgm/Shear Wall 12/15/2021 Approved ALIZAH MAYAGOITIA
Insulation 12/15/2021 Approved ALIZAH MAYAGOITIA
Rough-Elec/Plmb/HVAC 12/15/2021 Approved ALIZAH MAYAGOITIA
Shower Pan 12/15/2021 Approved ALIZAH MAYAGOITIA
Drywall Nailing 12/20/2021 Approved RUBEN SALAS
Interior/Exterior Lathing 12/20/2021 Approved RUBEN SALAS
Sewer 1/12/2022 Corrections Issued ALIZAH MAYAGOITIA
ELECTRICAL-Final 3/3/2022 Corrections Issued ADAM ESCOTO
Green Building Final 3/3/2022 Approved ADAM ESCOTO
HVAC-Final 3/3/2022 Approved ADAM ESCOTO
PLUMBING-Final 3/3/2022 Approved ADAM ESCOTO
ELECTRICAL-Final 3/23/2022 Approved STUART CHAPMAN
Final 3/23/2022 Partial Approval STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 3/23/2022 SGSOV Approved STUART CHAPMAN
Service/Power Release 3/23/2022 Approved STUART CHAPMAN
Smoke Detectors 3/23/2022 Approved STUART CHAPMAN
Final 3/29/2022 OK to Issue CofO STUART CHAPMAN