3937-3939 N BRILLIANT DR 90065

Certificate Information: 3937-3939 N BRILLIANT DR 90065

Application / Permit
21010-10000-00583
Plan Check / Job No.
B21LA02107
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW SINGLE FAMILY DWELLING, ADU WITH ATTACHED GARAGE PER ZA-2020-5549-ZAD-SPP (NFPA 13D THRU OUT) (ATTACHED ADU CONTAINED IN PROPOSED SFD PER STATE LAW, CA GOVT. CODE 65852.2(e)(1)(A))
Permit Issued
Issued on 7/27/2023
Issuing Office
Metro
Current Status
CofO Issued on 11/9/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/4/2021 APPLICANT
Assigned to Plan Check Engineer 2/25/2021 AUNG SOE
Corrections Issued 3/8/2021 AUNG SOE
Quality Review Completed 3/10/2021 EUGENE BARBEAU
Applicant returned to address corrections 12/20/2021 AUNG SOE
Applicant returned to address corrections 12/29/2021 AUNG SOE
Building Plans Picked Up 5/3/2022 APPLICANT
Plan Check Approved 7/27/2023 AUNG SOE
Issued 7/27/2023 APPLICANT
CofO in Progress 11/6/2025 NICHOLAS LOPEZ
Permit Finaled 11/9/2025 DEROLD HAUFF
CofO Issued 11/9/2025 DEROLD HAUFF
Permit Finaled 11/9/2025 DEROLD HAUFF

Permit Application Clearance Information

Disturb/Remove Protected Trees Cleared 4/9/2021 STEPHEN DUPREY
BHO/Hillside ordinance Cleared 4/22/2021 THOMAS LANG
BHO/Hillside ordinance Cleared 4/22/2021 THOMAS LANG
Sewer availability Cleared 4/27/2021 THOMAS LANG
Distance to fire station Cleared 6/8/2021 KURT CORRAL
Hydrant and Access approval Cleared 6/8/2021 KURT CORRAL
Eng Process Fee Ord 176,300 Cleared 6/9/2021 THOMAS LANG
Low Impact Development Cleared 3/18/2022 KHAING AYE
BHO/Hillside ordinance Cleared 4/16/2022 JEANETTE VONG
BHO/Hillside ordinance Cleared 4/16/2022 JEANETTE VONG
Trees in Parkway Cleared 5/4/2022 ADALBERTO VERA
Roof/Waste drainage to street Cleared 5/12/2022 JEANETTE VONG
Certificate of Compliance Cleared 5/16/2022 MARC WOERSCHING
Miscellaneous Cleared 5/16/2022 MARC WOERSCHING
Specific Plan Cleared 7/12/2022 MAYELA VILLA
ZA Case Cleared 7/12/2022 MAYELA VILLA
BHO/Hillside ordinance Cleared 10/24/2022 TREVOR QUAN
Permit Cleared 11/8/2022 THAN WIN
Grading Pre-Inspection Cleared 5/16/2023 AUNG SOE
Private sewage disp. approval Cleared 6/1/2023 DAN RYAN EVANGELISTA
Address approval Cleared 6/26/2023 CINDY QI

Contact Information

Architect Storey,, Simon Joseph; Lic. No.: C35346 1416 FAIRBANKS PLACE      LOS ANGELES, CA 90026
Contractor Owner-Builder       ,
Engineer Hansen,, Neil Christian; Lic. No.: L9027 1545 VICTORY BLVD 2ND FLOOR   N.C. HANSEN INC.    GLENDALE, CA 91201
Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026
Engineer Tsai,, Steve Shi-Shen; Lic. No.: GE2268 1545 VICTORY BLVD      GLENDALE, CA 91201
Geologist Fishburn,, Scott David; Lic. No.: EG2114 1545 VICTORY BLVD.      GLENDALE, CA 91201

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/14/2023 Partial Inspection HAMIK HARTOUNIAN
Excavation/Setback/Form/Re-Bar 3/27/2024 Partial Approval HAMIK HARTOUNIAN
Excavation/Setback/Form/Re-Bar 3/29/2024 Approved HAMIK HARTOUNIAN
Deputy Reinf. Concrete 4/1/2024 Conditional Approval BRENDAN MORELLI
Deputy Reinf. Concrete 5/3/2024 Conditional Approval HAMIK HARTOUNIAN
Excavation/Setback/Form/Re-Bar 6/4/2024 Partial Inspection THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 6/7/2024 Partial Approval THOMAS LOGRASSO
Grounding or Bonding 6/7/2024 Partial Approval THOMAS LOGRASSO
Deputy Reinf. Concrete 6/13/2024 Conditional Approval THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 7/3/2024 Partial Approval FREDDIE RIVERA
Deputy Drilled-In Anchors 7/5/2024 Conditional Approval FREDDIE RIVERA
Deputy Reinf. Concrete 7/5/2024 Conditional Approval FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 7/17/2024 Partial Approval BRENDAN MORELLI
Deputy Reinf. Concrete 7/19/2024 Conditional Approval THOMAS LOGRASSO
PLUMBING-Rough 8/8/2024 Partial Approval CRAIG VAUGHAN
Floor/Roof Diaphrgm/Shear Wall 8/26/2024 Partial Inspection THOMAS LOGRASSO
PLUMBING-Rough 8/26/2024 Partial Approval THOMAS LOGRASSO
Footing/Foundation/Slab 8/29/2024 Partial Approval THOMAS LOGRASSO
Deputy Reinf. Concrete 9/3/2024 Conditional Approval THOMAS LOGRASSO
Floor/Roof Diaphrgm/Shear Wall 9/9/2024 Approved ROY SPAULDING
PLUMBING-Rough 9/11/2024 Partial Approval THOMAS LOGRASSO
Deputy Wood Construction 9/13/2024 Conditional Approval THOMAS LOGRASSO
Floor/Roof Diaphrgm/Shear Wall 9/17/2024 Partial Approval THOMAS LOGRASSO
Deputy Drilled-In Anchors 9/30/2024 Conditional Approval JOHN QUINTANILLA
Floor/Roof Diaphrgm/Shear Wall 10/4/2024 Partial Approval THOMAS LOGRASSO
ELECTRICAL-Rough 11/7/2024 Corrections Issued THOMAS LOGRASSO
PLUMBING-Rough 12/2/2024 Partial Approval THOMAS LOGRASSO
BUILDING-Rough-Frame 12/19/2024 Corrections Issued THOMAS LOGRASSO
Green Building Rough 12/19/2024 Not Ready for Inspection THOMAS LOGRASSO
HVAC-Rough 12/19/2024 Approved THOMAS LOGRASSO
PLUMBING-Rough 12/19/2024 Approved THOMAS LOGRASSO
Verify Sprinkler Sign Off 12/19/2024 Approved THOMAS LOGRASSO
BUILDING-Rough-Frame 2/11/2025 Approved THOMAS LOGRASSO
ELECTRICAL-Rough 2/11/2025 Approved THOMAS LOGRASSO
Insulation 3/14/2025 Approved NICHOLAS LOPEZ
Drywall Nailing 3/17/2025 Partial Approval REGINA MENDEZ
Drywall Nailing 3/18/2025 Approved REGINA MENDEZ
Interior/Exterior Lathing 3/18/2025 Not Ready for Inspection REGINA MENDEZ
Interior/Exterior Lathing 4/1/2025 Approved REGINA MENDEZ
Shower Pan 4/1/2025 Approved REGINA MENDEZ
Pre-Inspection 4/8/2025 Partial Inspection NICHOLAS LOPEZ
BUILDING-Rough-Frame 8/29/2025 Approved NICHOLAS LOPEZ
ELECTRICAL-Final 8/29/2025 Corrections Issued NICHOLAS LOPEZ
Final 8/29/2025 Corrections Issued NICHOLAS LOPEZ
Footing/Foundation/Slab 8/29/2025 Approved NICHOLAS LOPEZ
Green Building Final 8/29/2025 Not Ready for Inspection NICHOLAS LOPEZ
Green Building Rough 8/29/2025 Approved NICHOLAS LOPEZ
HVAC-Final 8/29/2025 Corrections Issued NICHOLAS LOPEZ
PLUMBING-Final 8/29/2025 Corrections Issued NICHOLAS LOPEZ
SGSOV-Seismic Gas S/O Valve 8/29/2025 SGSOV No Gas NICHOLAS LOPEZ
Smoke Detectors 8/29/2025 Approved NICHOLAS LOPEZ
ELECTRICAL-Final 9/3/2025 Approved NICHOLAS LOPEZ
PLUMBING-Final 9/3/2025 Approved NICHOLAS LOPEZ
Service/Power Release 9/8/2025 Approved NICHOLAS LOPEZ
Final 11/6/2025 OK to Issue CofO NICHOLAS LOPEZ
Green Building Final 11/6/2025 Approved NICHOLAS LOPEZ