953 N EVERETT ST 90026

Certificate Information: 953 N EVERETT ST 90026

Application / Permit
21010-10000-00567
Plan Check / Job No.
B21LA02070
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2 STORY SFD WITH BASEMENT GARAGE PER SMALL LOT SUBDIVISION PURSUANT TO TENTATIVE TRACT MAP NO / PRELIMINARY PARCEL MAP NO. 83390 A CERTIFICATE OF OCCUPANCY (TEMPORARY OR FINAL) SHALL NOT BE ISSUED UNTIL AFTER THE FINAL MAP HAS BEEN RECORDED.
Permit Issued
Issued on 12/13/2022
Issuing Office
Current Status
CofO Issued on 3/22/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Plan Check Approved 10/26/2022 MANUEL MONTUFAR
Issued 12/13/2022 APPLICANT
CofO in Progress 3/19/2025 BRENDAN MORELLI
No Progress 3/22/2025 DEROLD HAUFF
CofO in Progress 3/22/2025 DEROLD HAUFF
Permit Finaled 3/22/2025 DEROLD HAUFF
CofO Issued 3/22/2025 DEROLD HAUFF
Permit Finaled 3/22/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 11/3/2021 JEANETTE VONG
Permit Cleared 11/3/2021 JEANETTE VONG
Construction near power lines Cleared 2/15/2022 TINA MIRANDA
Low Impact Development Cleared 2/25/2022 AMMAR ELTAWIL
Hydrant and Access approval Cleared 3/2/2022 RUEL COLE
Eng Process Fee Ord 176,300 Cleared 3/3/2022 JEANETTE VONG
Excavation more than 5-ft deep Cleared 3/7/2022 CALOSHA APPROVED
GPI Written Notices Cleared 3/7/2022 MANUEL MONTUFAR
Grading Pre-Inspection Cleared 3/7/2022 MANUEL MONTUFAR
Trees in Parkway Cleared 5/24/2022 ADALBERTO VERA
Roof/Waste drainage to street Cleared 7/5/2022 AMAAN MALIK
Sewer availability Cleared 7/14/2022 JEANETTE VONG
"Q" conditions Cleared 9/7/2022 RUBEN VASQUEZ
Frnt yard landscape/Water mgmt Cleared 9/7/2022 RUBEN VASQUEZ
Landscape for retaining wall Cleared 9/7/2022 RUBEN VASQUEZ
Miscellaneous Cleared 9/7/2022 RUBEN VASQUEZ
Miscellaneous Cleared 9/7/2022 RUBEN VASQUEZ
Miscellaneous Cleared 9/12/2022 ALBERT TAM

Contact Information

Architect Moss,, Kyle A; Lic. No.: C28077 2627 30TH STREET      SANTA MONICA, CA 90405
Contractor Owner-Builder       ,
Engineer Gentry,, Bryan Douglas; Lic. No.: L6345 255 E EASY ST UNIT B      SIMI VALLEY, CA 93065
Engineer Pukkanasut,, Jirayus; Lic. No.: C73728 1424 ROLLING HILLS DR      FULLERTON, CA 92835
Engineer Tosounian,, Oshin Bedros; Lic. No.: C43739 18333 ALGIERS ST      VAN NUYS, CA 91406
Geologist Minas,, Shant; Lic. No.: EG2607 566 RIVERDALE DRIVE      GLENDALE, CA 91204

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/14/2023 Partial Inspection ALIZAH MAYAGOITIA
Excavation/Setback/Form/Re-Bar 2/22/2023 Partial Approval STUART CHAPMAN
Deputy Reinf. Concrete 2/23/2023 Conditional Approval STUART CHAPMAN
Footing/Foundation/Slab 4/19/2023 Corrections Issued ALIZAH MAYAGOITIA
METHANE-Barrier 4/19/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
METHANE-Subgrade 4/19/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
Footing/Foundation/Slab 4/20/2023 Partial Approval ALIZAH MAYAGOITIA
Deputy Reinf. Masonry 6/6/2023 Conditional Approval ALIZAH MAYAGOITIA
Reinforced Masonry Frame 6/8/2023 Partial Approval ALIZAH MAYAGOITIA
Deputy Reinf. Masonry 6/14/2023 Conditional Approval ALIZAH MAYAGOITIA
Reinforced Concrete Frame 6/14/2023 Partial Approval ALIZAH MAYAGOITIA
Reinforced Concrete Frame 6/21/2023 Partial Approval ALIZAH MAYAGOITIA
METHANE-Barrier 8/3/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
METHANE-Subgrade 8/7/2023 Approved ALIZAH MAYAGOITIA
Footing/Foundation/Slab 8/23/2023 Approved ALIZAH MAYAGOITIA
METHANE-Barrier 8/23/2023 Approved ALIZAH MAYAGOITIA
Drywall Nailing 9/8/2023 Partial Approval ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 9/19/2023 Corrections Issued ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 9/26/2023 Partial Approval ALIZAH MAYAGOITIA
Drywall Nailing 10/3/2023 Partial Approval ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 10/12/2023 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 10/18/2023 Partial Approval BRENDAN MORELLI
Drywall Nailing 10/23/2023 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 11/9/2023 Partial Approval ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 11/29/2023 Partial Approval ALIZAH MAYAGOITIA
Drywall Nailing 12/4/2023 Partial Approval ALIZAH MAYAGOITIA
Deputy Wood Construction 1/24/2024 Conditional Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 1/26/2024 Conditional Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 2/7/2024 Approved BRENDAN MORELLI
PLUMBING-Rough 2/7/2024 Approved BRENDAN MORELLI
BUILDING-Rough-Frame 2/15/2024 Partial Approval BRENDAN MORELLI
ELECTRICAL-Rough 2/15/2024 Approved BRENDAN MORELLI
HVAC-Rough 2/26/2024 Approved BRENDAN MORELLI
Insulation 2/26/2024 Partial Approval BRENDAN MORELLI
Interior/Exterior Lathing 2/26/2024 Partial Approval BRENDAN MORELLI
Shower Pan 2/29/2024 Approved BRENDAN MORELLI
BUILDING-Rough-Frame 3/5/2024 Approved JOSEPH MCGARRY
Green Building Rough 3/5/2024 Approved JOSEPH MCGARRY
METHANE-Rough 3/5/2024 Approved JOSEPH MCGARRY
Verify Sprinkler Sign Off 3/5/2024 Approved JOSEPH MCGARRY
Wood Frame 3/5/2024 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 3/6/2024 Partial Approval JOSEPH MCGARRY
Insulation 3/12/2024 Approved JOSEPH MCGARRY
Drywall Nailing 3/21/2024 Approved JOSEPH MCGARRY
Gas Test 3/21/2024 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 4/1/2024 Approved JOSEPH MCGARRY
Underground Mechanical 6/24/2024 Partial Approval BRENDAN MORELLI
Underground Mechanical 7/1/2024 Partial Approval BRENDAN MORELLI
Underground Mechanical 7/3/2024 Not Ready for Inspection SCOTT FINNILA
Underground Mechanical 7/8/2024 Partial Approval BRENDAN MORELLI
Deputy Reinf. Concrete 8/6/2024 Conditional Approval BRENDAN MORELLI
PLUMBING-Final 11/14/2024 Corrections Issued BRENDAN MORELLI
Special/Order Compliance 11/14/2024 Corrections Issued BRENDAN MORELLI
ELECTRICAL-Final 11/19/2024 Corrections Issued BRENDAN MORELLI
PLUMBING-Final 11/19/2024 Approved BRENDAN MORELLI
ELECTRICAL-Final 11/25/2024 Approved BRENDAN MORELLI
Service/Power Release 12/3/2024 Approved BRENDAN MORELLI
Final 3/7/2025 Corrections Issued BRENDAN MORELLI
Gas Test 3/7/2025 Approved BRENDAN MORELLI
Green Building Final 3/7/2025 Not Ready for Inspection BRENDAN MORELLI
HVAC-Final 3/7/2025 Corrections Issued BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 3/7/2025 SGSOV Approved BRENDAN MORELLI
Smoke Detectors 3/7/2025 Approved BRENDAN MORELLI
Final 3/10/2025 Not Ready for Inspection BRENDAN MORELLI
Green Building Final 3/10/2025 Not Ready for Inspection BRENDAN MORELLI
HVAC-Final 3/10/2025 Not Ready for Inspection BRENDAN MORELLI
Final 3/12/2025 Not Ready for Inspection BRENDAN MORELLI
Green Building Final 3/12/2025 Approved BRENDAN MORELLI
Final 3/19/2025 OK to Issue CofO BRENDAN MORELLI