9200 N WINNETKA AVE 1-89 91311

Certificate Information: 9200 N WINNETKA AVE 1-89 91311

Application / Permit
21010-10000-00502
Plan Check / Job No.
B21LA01742
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 6-STORY (1 STORY TYPE IA OVER 5-STORY TYPE VA) MIXED USE APARTMENT, STORAGE, RETAIL AND ATTACHED GARAGE (BUILDING B1). NEW 2-STORY (TYPE IIIA) RECREATION AREA. (BUILDING B2)
Permit Issued
Issued on 8/2/2022
Issuing Office
Metro
Current Status
CofO Issued on 11/4/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/8/2021 APPLICANT
Assigned to Plan Check Engineer 3/11/2021 KEVIN MORALES
Corrections Issued 3/30/2021 KEVIN MORALES
Quality Review Completed 4/1/2021 EUGENE BARBEAU
Building Plans Picked Up 4/8/2021 APPLICANT
Applicant returned to address corrections 5/27/2021 KEVIN MORALES
Applicant returned to address corrections 7/21/2021 KEVIN MORALES
Applicant returned to address corrections 9/1/2021 KEVIN MORALES
Applicant returned to address corrections 5/18/2022 KEVIN MORALES
Plan Check Approved 8/1/2022 KEVIN MORALES
Issued 8/2/2022 APPLICANT
CofO in Progress 11/4/2024 GREGORY POMISH
Permit Finaled 11/4/2024 RICKEY JACKSON
CofO Issued 11/4/2024 RICKEY JACKSON
Permit Finaled 11/4/2024 RICKEY JACKSON

Permit Application Clearance Information

Flood clearance Cleared 6/14/2021 TIFFANY WONG
Construction within easement Cleared 7/28/2021 WALTER RAMIREZ
Eng Process Fee Ord 176,300 Cleared 7/29/2021 GABRIEL ROBLES
Trees in Parkway Cleared 8/11/2021 JOHN KIM
Sewer availability Cleared 9/28/2021 LEE GUILBEAUX
Address approval Cleared 10/4/2021 GABRIEL ROBLES
Metro Rail approval Cleared 10/19/2021 KEVIN MORALES
Highway dedication Cleared 10/26/2021 CARLOS AGUILERA
Permit Cleared 10/26/2021 CARLOS AGUILERA
Watercourse Cleared 10/27/2021 CARLOS AGUILERA
Green Code Cleared 6/14/2022 AARON COSTA
Fire Marshal Fire Life Safety Cleared 6/22/2022 MENOA AGHAJANI
DAS Clearance Cleared 6/23/2022 KEVIN MORALES
Hydrant and Access approval Cleared 7/5/2022 KURT CORRAL
Building over 36-ft Cleared 7/8/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/8/2022 CALOSHA APPROVED
Miscellaneous Cleared 7/13/2022 LEE GUILBEAUX
Tract Map conditions Cleared 7/21/2022 KIMBERLY HENRY
ZA Case Cleared 7/21/2022 KIMBERLY HENRY
ZA Case Cleared 7/21/2022 KIMBERLY HENRY
"Q" conditions Cleared 7/22/2022 KIMBERLY HENRY
"T" removal Cleared 7/22/2022 KIMBERLY HENRY
CPC Cleared 7/22/2022 KIMBERLY HENRY
Miscellaneous Cleared 7/22/2022 KIMBERLY HENRY
Miscellaneous Cleared 7/22/2022 KIMBERLY HENRY
Miscellaneous Cleared 7/22/2022 LOUIS ORTEGA
Tract Map conditions Cleared 7/22/2022 KIMBERLY HENRY
ZI Cleared 7/22/2022 LOUIS ORTEGA
Low Impact Development Cleared 7/28/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 7/29/2022 LEE GUILBEAUX

Contact Information

Contractor Uncommon Builders Llc; Lic. No.: 1046026-B 9220 WINNETKA AVE      CHATSWORTH, CA 91311
Engineer Nishi,, Thomas Yoshimasa; Lic. No.: S4030 1615 BUCKINGHAM RD      LOS ANGELES, CA 90019

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 8/24/2022 Partial Inspection CAMERON CHABAN
Pre-Inspection 8/24/2022 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 8/29/2022 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 9/1/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/2/2022 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 9/2/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/6/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 10/13/2022 Partial Approval CAMERON CHABAN
Footing/Foundation/Slab 10/17/2022 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/18/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/21/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 10/21/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/24/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/25/2022 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 10/25/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/26/2022 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 10/26/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/27/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/28/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/1/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 11/1/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/2/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 11/2/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/3/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/3/2022 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 11/3/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/4/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 11/4/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 11/14/2022 Approved JOHN KITCKO
Deputy Shotcrete 11/16/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/17/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/18/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 11/22/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/23/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/28/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/29/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 11/29/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 11/29/2022 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 11/29/2022 Not Ready for Inspection CAMERON CHABAN
Deputy Shotcrete 11/30/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 11/30/2022 Partial Inspection CAMERON CHABAN
Masonry Wall/Backfill 11/30/2022 Partial Inspection CAMERON CHABAN
Deputy Shotcrete 12/1/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/2/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 12/12/2022 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 12/14/2022 Partial Approval CAMERON CHABAN
Footing/Foundation/Slab 12/17/2022 Off-Hour Fees Due
Footing/Foundation/Slab 12/17/2022 Partial Approval CAMERON CHABAN
Green Building Rough 12/17/2022 Approved CAMERON CHABAN
Green Building Rough 12/17/2022 Off-Hour Fees Due
Reinforced Concrete Frame 12/17/2022 Off-Hour Fees Due
Reinforced Concrete Frame 12/17/2022 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 12/17/2022 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 12/17/2022 Off-Hour Fees Due
Masonry Wall/Backfill 12/29/2022 Partial Approval CAMERON CHABAN
Reinforced Masonry Frame 12/29/2022 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 12/29/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 1/3/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 1/18/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 1/18/2023 Partial Inspection DEANDRE HOFFMAN
Piling/Pier/Caisson 1/20/2023 Corrections Issued DANNY RODRIGUEZ
Footing/Foundation/Slab 1/23/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/24/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/24/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/25/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 1/25/2023 Partial Approval CAMERON CHABAN
Deputy Shotcrete 1/26/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 1/26/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/27/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/27/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/31/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/2/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 2/2/2023 Conditional Approval CAMERON CHABAN
Reinforced Concrete Frame 2/2/2023 Partial Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 2/2/2023 Not Ready for Inspection CAMERON CHABAN
Piling/Pier/Caisson 2/3/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 2/4/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 2/6/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 2/6/2023 Conditional Approval STEVEN LEVITT
Deputy Pre-Stress Concrete 2/7/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/7/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 2/7/2023 Partial Approval DANIEL VARNUM
Special/Order Compliance 2/7/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Masonry 2/8/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 2/8/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Masonry 2/9/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 2/9/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Masonry 2/10/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 2/10/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 2/10/2023 Partial Approval STEVEN LEVITT
Deputy Pre-Stress Concrete 2/13/2023 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 2/13/2023 Conditional Approval DANIEL VARNUM
Masonry Wall/Backfill 2/13/2023 Partial Approval DANIEL VARNUM
Deputy Pre-Stress Concrete 2/14/2023 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 2/14/2023 Conditional Approval DANIEL VARNUM
Reinforced Concrete Frame 2/14/2023 Partial Approval DANIEL VARNUM
Deputy Pre-Stress Concrete 2/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/15/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 2/16/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/16/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 2/17/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 2/17/2023 Conditional Approval CAMERON CHABAN
Reinforced Concrete Frame 2/17/2023 Partial Inspection CAMERON CHABAN
Special/Order Compliance 2/17/2023 Partial Approval STEVEN LEVITT
Verify Sprinkler Sign Off 2/17/2023 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 2/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/23/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 2/23/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 2/27/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 2/28/2023 Approved DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 3/1/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 3/3/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 3/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/8/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 3/8/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/9/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/9/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/9/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/10/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/13/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 3/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/28/2023 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 3/29/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/31/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 4/3/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/5/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 4/5/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/11/2023 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 4/12/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 4/12/2023 Partial Approval STEVEN LEVITT
Piling/Pier/Caisson 4/13/2023 Partial Approval CAMERON CHABAN
Piling/Pier/Caisson 4/14/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/17/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 4/18/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 4/19/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 4/20/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 4/20/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 4/20/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/21/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 4/25/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 4/25/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/26/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/5/2023 Conditional Approval DEANDRE HOFFMAN
Footing/Foundation/Slab 5/5/2023 Partial Inspection DEANDRE HOFFMAN
Deputy Reinf. Concrete 5/8/2023 Conditional Approval CAMERON CHABAN
Pre-Inspection 5/10/2023 Partial Inspection CAMERON CHABAN
Special/Order Compliance 5/10/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 5/11/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 5/12/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/15/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 5/15/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 5/22/2023 Conditional Approval JEFFREY FULTON
Masonry Wall/Backfill 5/22/2023 Partial Inspection JEFFREY FULTON
Special/Order Compliance 5/22/2023 Conditional Approval STEVEN LEVITT
Footing/Foundation/Slab 5/24/2023 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/25/2023 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 5/25/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 5/26/2023 Conditional Approval KENNETH ROBERTS
Floor/Roof Diaphrgm/Shear Wall 5/26/2023 Partial Approval KENNETH ROBERTS
Deputy Reinf. Concrete 5/30/2023 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 5/30/2023 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/31/2023 Partial Approval CAMERON CHABAN
Footing/Foundation/Slab 6/1/2023 Not Ready for Inspection CAMERON CHABAN
Masonry Wall/Backfill 6/1/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 6/2/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 6/8/2023 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/8/2023 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/9/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 6/13/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/13/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 6/13/2023 Not Ready for Inspection CAMERON CHABAN
Masonry Wall/Backfill 6/14/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 6/15/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 6/15/2023 Partial Approval CAMERON CHABAN
Deputy Wood Construction 6/16/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/21/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/21/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 6/21/2023 Not Ready for Inspection CAMERON CHABAN
Deputy Wood Construction 6/23/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/26/2023 Partial Approval STEVEN LEVITT
Deputy Steel/Welding 6/27/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 6/28/2023 Partial Approval CAMERON CHABAN
Insulation 6/28/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 6/30/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/3/2023 Conditional Approval JEFFREY FULTON
Verify Sprinkler Sign Off 7/3/2023 Not Ready for Inspection JEFFREY FULTON
Wood Frame 7/3/2023 Not Ready for Inspection JEFFREY FULTON
Reinforced Masonry Frame 7/7/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 7/10/2023 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 7/12/2023 Partial Approval CAMERON CHABAN
Insulation 7/12/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 7/13/2023 Partial Inspection CAMERON CHABAN
Insulation 7/13/2023 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 7/13/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 7/13/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 7/13/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 7/17/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 7/17/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 7/17/2023 Partial Inspection CAMERON CHABAN
Drywall Nailing 7/18/2023 Partial Approval CAMERON CHABAN
Insulation 7/18/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 7/18/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 7/21/2023 Not Ready for Inspection ANDREW DORSO
Footing/Foundation/Slab 7/21/2023 Not Ready for Inspection ANDREW DORSO
Insulation 7/21/2023 Not Ready for Inspection ANDREW DORSO
Light Gage Steel Frame 7/21/2023 Not Ready for Inspection ANDREW DORSO
Verify Sprinkler Sign Off 7/21/2023 Not Ready for Inspection ANDREW DORSO
Wood Frame 7/21/2023 Not Ready for Inspection ANDREW DORSO
Insulation 7/24/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 7/24/2023 Partial Inspection CAMERON CHABAN
Drywall Nailing 7/25/2023 Conditional Approval STEVEN LEVITT
Floor/Roof Diaphrgm/Shear Wall 7/25/2023 Conditional Approval STEVEN LEVITT
Pre-Inspection 7/25/2023 Conditional Approval STEVEN LEVITT
Verify Sprinkler Sign Off 7/25/2023 Conditional Approval STEVEN LEVITT
Wood Frame 7/25/2023 Conditional Approval STEVEN LEVITT
Deputy Steel/Welding 7/26/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 7/26/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 7/31/2023 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/31/2023 Partial Inspection JEFFREY FULTON
Insulation 7/31/2023 Not Ready for Inspection JEFFREY FULTON
Wood Frame 7/31/2023 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/2/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/2/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 8/2/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 8/2/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 8/3/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 8/3/2023 Partial Inspection CAMERON CHABAN
Structural Steel Frame 8/5/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 8/8/2023 Partial Approval CAMERON CHABAN
Insulation 8/8/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 8/8/2023 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 8/8/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 8/8/2023 Not Ready for Inspection CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/10/2023 Partial Approval CAMERON CHABAN
Insulation 8/10/2023 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 8/10/2023 Not Ready for Inspection CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/14/2023 Partial Approval STEVEN LEVITT
Insulation 8/14/2023 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 8/14/2023 Partial Inspection STEVEN LEVITT
Verify Sprinkler Sign Off 8/14/2023 Not Ready for Inspection STEVEN LEVITT
Wood Frame 8/14/2023 Partial Approval STEVEN LEVITT
Drywall Nailing 8/15/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/15/2023 Partial Approval CAMERON CHABAN
Insulation 8/15/2023 Partial Approval CAMERON CHABAN
Insulation 8/16/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 8/16/2023 Partial Inspection CAMERON CHABAN
Wood Frame 8/16/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 8/21/2023 Not Ready for Inspection CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/21/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 8/21/2023 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 8/21/2023 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 8/21/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 8/21/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 8/23/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/23/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 8/23/2023 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 8/23/2023 Not Ready for Inspection CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/28/2023 Partial Approval STEVEN LEVITT
Insulation 8/28/2023 Partial Approval STEVEN LEVITT
Light Gage Steel Frame 8/28/2023 Partial Approval STEVEN LEVITT
Drywall Nailing 8/29/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/29/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 8/29/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 8/29/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/30/2023 Partial Approval CAMERON CHABAN
Insulation 8/30/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 8/30/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 9/5/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/5/2023 Partial Inspection CAMERON CHABAN
Insulation 9/5/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 9/5/2023 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 9/5/2023 Partial Approval CAMERON CHABAN
Wood Frame 9/5/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 9/6/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/6/2023 Not Ready for Inspection CAMERON CHABAN
Footing/Foundation/Slab 9/6/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 9/7/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 9/7/2023 Partial Approval CAMERON CHABAN
Structural Steel Frame 9/7/2023 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 9/7/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 9/8/2023 Not Ready for Inspection CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/8/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 9/8/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 9/8/2023 Not Ready for Inspection CAMERON CHABAN
Structural Steel Frame 9/8/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 9/8/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/11/2023 Partial Approval STEVEN LEVITT
Insulation 9/11/2023 Partial Approval STEVEN LEVITT
Drywall Nailing 9/12/2023 Not Ready for Inspection ANDREW DORSO
Insulation 9/12/2023 Not Ready for Inspection ANDREW DORSO
Light Gage Steel Frame 9/12/2023 Not Ready for Inspection ANDREW DORSO
Drywall Nailing 9/19/2023 Partial Approval STEVEN LEVITT
Final 9/19/2023 Not Ready for Inspection STEVEN LEVITT
Footing/Foundation/Slab 9/19/2023 Not Ready for Inspection STEVEN LEVITT
Green Building Final 9/19/2023 Not Ready for Inspection STEVEN LEVITT
Insulation 9/19/2023 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 9/19/2023 Partial Approval STEVEN LEVITT
Reinforced Concrete Frame 9/19/2023 Not Ready for Inspection STEVEN LEVITT
Reinforced Masonry Frame 9/19/2023 Not Ready for Inspection STEVEN LEVITT
SGSOV-Seismic Gas S/O Valve 9/19/2023 SGSOV Not Ready STEVEN LEVITT
Smoke Detectors 9/19/2023 Not Ready for Inspection STEVEN LEVITT
Verify Sprinkler Sign Off 9/19/2023 Not Ready for Inspection STEVEN LEVITT
Wood Frame 9/19/2023 Partial Approval STEVEN LEVITT
Insulation 9/20/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 9/20/2023 Partial Inspection CAMERON CHABAN
Deputy Steel/Welding 9/21/2023 Conditional Approval STEVEN LEVITT
Drywall Nailing 9/21/2023 Partial Approval STEVEN LEVITT
Insulation 9/21/2023 Partial Approval STEVEN LEVITT
Light Gage Steel Frame 9/21/2023 Partial Approval STEVEN LEVITT
Insulation 9/22/2023 Partial Approval STEVEN LEVITT
Light Gage Steel Frame 9/22/2023 Not Ready for Inspection STEVEN LEVITT
Deputy Steel/Welding 9/25/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 9/26/2023 Partial Approval CAMERON CHABAN
Insulation 9/26/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 9/26/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 9/27/2023 Partial Approval CAMERON CHABAN
Insulation 9/27/2023 Not Ready for Inspection CAMERON CHABAN
Interior/Exterior Lathing 9/27/2023 Partial Approval CAMERON CHABAN
Structural Steel Frame 9/27/2023 Partial Approval CAMERON CHABAN
Insulation 9/28/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 9/28/2023 Partial Approval CAMERON CHABAN
Structural Steel Frame 9/28/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 9/29/2023 Partial Approval CAMERON CHABAN
Interior/Exterior Lathing 9/29/2023 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 9/29/2023 Not Ready for Inspection CAMERON CHABAN
Structural Steel Frame 9/29/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 9/29/2023 Partial Inspection CAMERON CHABAN
Wood Frame 9/29/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 10/3/2023 Partial Inspection JEFFREY FULTON
Insulation 10/3/2023 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 10/3/2023 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 10/3/2023 Not Ready for Inspection JEFFREY FULTON
Insulation 10/4/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/4/2023 Partial Approval CAMERON CHABAN
Insulation 10/5/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/5/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 10/11/2023 Partial Approval CAMERON CHABAN
Insulation 10/11/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/11/2023 Partial Approval CAMERON CHABAN
Insulation 10/12/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/12/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 10/16/2023 Partial Approval CAMERON CHABAN
Insulation 10/16/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/16/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 10/17/2023 Partial Approval CAMERON CHABAN
Insulation 10/17/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 10/19/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 10/19/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/19/2023 Not Ready for Inspection CAMERON CHABAN
Special/Order Compliance 10/20/2023 Corrections Issued CAMERON CHABAN
Drywall Nailing 10/23/2023 Partial Approval JOHN KITCKO
Light Gage Steel Frame 10/23/2023 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 10/24/2023 Partial Approval CAMERON CHABAN
Insulation 10/24/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/24/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 10/25/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/25/2023 Partial Approval CAMERON CHABAN
Insulation 10/26/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/26/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 10/30/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/30/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/30/2023 Conditional Approval CAMERON CHABAN
Insulation 10/31/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 10/31/2023 Partial Approval CAMERON CHABAN
Deputy Drilled-In Anchors 11/1/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 11/2/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 11/2/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 11/2/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 11/7/2023 Partial Approval STEVEN LEVITT
Insulation 11/7/2023 Partial Approval STEVEN LEVITT
Light Gage Steel Frame 11/7/2023 Partial Approval STEVEN LEVITT
Insulation 11/8/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 11/8/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 11/9/2023 Partial Approval CAMERON CHABAN
Insulation 11/9/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 11/9/2023 Partial Approval CAMERON CHABAN
Deputy Drilled-In Anchors 11/15/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 11/20/2023 Partial Approval STEVEN LEVITT
Insulation 11/20/2023 Partial Approval STEVEN LEVITT
Light Gage Steel Frame 11/20/2023 Partial Approval STEVEN LEVITT
Insulation 11/21/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 11/21/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 12/1/2023 Partial Approval CAMERON CHABAN
Insulation 12/1/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 12/1/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 12/5/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 12/6/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 12/6/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 12/6/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 12/6/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 12/8/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 12/8/2023 Partial Approval CAMERON CHABAN
Insulation 12/11/2023 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 12/11/2023 Not Ready for Inspection STEVEN LEVITT
Drywall Nailing 12/12/2023 Not Ready for Inspection STEVEN LEVITT
Insulation 12/12/2023 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 12/12/2023 Not Ready for Inspection STEVEN LEVITT
Insulation 12/13/2023 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 12/13/2023 Not Ready for Inspection STEVEN LEVITT
Insulation 12/18/2023 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 12/18/2023 Not Ready for Inspection STEVEN LEVITT
Drywall Nailing 12/19/2023 Partial Approval STEVEN LEVITT
Light Gage Steel Frame 12/19/2023 Partial Approval STEVEN LEVITT
Drywall Nailing 12/20/2023 Partial Inspection CAMERON CHABAN
Insulation 12/20/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 12/20/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 12/21/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 12/21/2023 Partial Inspection CAMERON CHABAN
Drywall Nailing 12/27/2023 Partial Inspection CAMERON CHABAN
Insulation 12/27/2023 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 12/27/2023 Partial Inspection CAMERON CHABAN
Footing/Foundation/Slab 12/28/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 12/28/2023 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 1/2/2024 Partial Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 1/2/2024 Partial Inspection CAMERON CHABAN
Insulation 1/2/2024 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 1/2/2024 Partial Inspection CAMERON CHABAN
Insulation 1/4/2024 Not Ready for Inspection CAMERON CHABAN
Interior/Exterior Lathing 1/4/2024 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 1/4/2024 Not Ready for Inspection CAMERON CHABAN
Drywall Nailing 1/5/2024 Not Ready for Inspection STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 1/5/2024 Not Ready for Inspection STEVEN LEVITT
Insulation 1/5/2024 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 1/5/2024 Not Ready for Inspection STEVEN LEVITT
Drywall Nailing 1/9/2024 Not Ready for Inspection STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 1/9/2024 Not Ready for Inspection STEVEN LEVITT
Insulation 1/9/2024 Not Ready for Inspection STEVEN LEVITT
Light Gage Steel Frame 1/9/2024 Not Ready for Inspection STEVEN LEVITT
Drywall Nailing 1/18/2024 Not Ready for Inspection MARTIN TAVITIAN
Insulation 1/18/2024 Not Ready for Inspection MARTIN TAVITIAN
Light Gage Steel Frame 1/18/2024 Not Ready for Inspection MARTIN TAVITIAN
Insulation 1/19/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 1/19/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 1/22/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 1/22/2024 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 1/26/2024 Partial Approval STEVEN LEVITT
Drywall Nailing 1/31/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/6/2024 Partial Inspection JEFFREY FULTON
Insulation 2/6/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 2/6/2024 Partial Inspection JEFFREY FULTON
Insulation 2/7/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 2/7/2024 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 2/9/2024 Conditional Approval JEFFREY FULTON
Drywall Nailing 2/13/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 2/13/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 2/13/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Drilled-In Anchors 2/14/2024 Conditional Approval JEFFREY FULTON
Insulation 2/14/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 2/14/2024 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 2/22/2024 Partial Inspection JEFFREY FULTON
Insulation 2/29/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/29/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/8/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 3/11/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 3/27/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/3/2024 Partial Approval GREGORY POMISH
Drywall Nailing 4/9/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 4/18/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/23/2024 Partial Approval GREGORY POMISH
Deputy Steel/Welding 4/25/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/26/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/26/2024 Not Ready for Inspection GREGORY POMISH
Deputy Steel/Welding 4/29/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/30/2024 Conditional Approval DEANDRE HOFFMAN
Deputy Steel/Welding 5/1/2024 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 5/1/2024 Partial Approval JEFFREY DURAN
Drywall Nailing 5/2/2024 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/6/2024 Partial Approval ROBERT DAVIS
Insulation 5/6/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/10/2024 Partial Approval GREGORY POMISH
Drywall Nailing 5/13/2024 Partial Inspection GREGORY POMISH
Final 5/13/2024 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 5/13/2024 Partial Inspection GREGORY POMISH
Green Building Final 5/13/2024 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 5/13/2024 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 5/13/2024 Partial Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 5/13/2024 SGSOV Not Ready GREGORY POMISH
Smoke Detectors 5/13/2024 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 5/13/2024 Partial Inspection GREGORY POMISH
Wood Frame 5/13/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/14/2024 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 5/15/2024 Conditional Approval GREGORY POMISH
Posting Pre-Inspection 5/15/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 5/17/2024 Partial Approval GREGORY POMISH
Pre-Inspection 5/21/2024 Partial Inspection GREGORY POMISH
Pre-Inspection 5/22/2024 Partial Inspection GREGORY POMISH
Pre-Inspection 5/23/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/24/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/28/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/29/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/30/2024 Partial Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 5/31/2024 Partial Approval DEANDRE HOFFMAN
Excavation/Setback/Form/Re-Bar 6/3/2024 Partial Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 6/4/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 6/5/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 6/6/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 6/7/2024 Partial Inspection GREGORY POMISH
Special/Order Compliance 6/10/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/12/2024 Partial Inspection ROBERT DAVIS
Drywall Nailing 6/13/2024 Partial Approval DEANDRE HOFFMAN
Light Gage Steel Frame 6/14/2024 Partial Approval DEANDRE HOFFMAN
Insulation 6/17/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/18/2024 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/18/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 6/20/2024 Partial Inspection GREGORY POMISH
Insulation 6/21/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/25/2024 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 7/5/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 7/8/2024 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 7/12/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/15/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 7/22/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/24/2024 Partial Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 7/25/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 9/18/2024 Approved GREGORY POMISH
Final 9/18/2024 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 9/18/2024 Approved GREGORY POMISH
Green Building Final 9/18/2024 Approved GREGORY POMISH
Reinforced Concrete Frame 9/18/2024 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 9/18/2024 Partial Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 9/18/2024 SGSOV Approved GREGORY POMISH
Smoke Detectors 9/18/2024 Approved GREGORY POMISH
Verify Sprinkler Sign Off 9/18/2024 Not Ready for Inspection GREGORY POMISH
Wood Frame 9/18/2024 Partial Inspection GREGORY POMISH
Final 11/1/2024 OK to Issue CofO GREGORY POMISH
Reinforced Concrete Frame 11/1/2024 Approved GREGORY POMISH
Reinforced Masonry Frame 11/1/2024 Approved GREGORY POMISH
Verify Sprinkler Sign Off 11/1/2024 Approved GREGORY POMISH
Wood Frame 11/1/2024 Approved GREGORY POMISH