NEW 6-STORY APARTMENT (2 STORIES TYPE VA OVER 4 STORIES TYPE IA OVER 1 TYPE IA BASEMENT LEVEL) WITH ATTACHED GARAGE AND COMMON RECREATION AREA. (BUILDING A1). NEW 5-STORY APARTMENT (TYPE IIIA WITH FIRST FLOOR MEZZANINE) WITH COMMON RECREATION AREA (BUILDING A2)
Permit Issued
Issued on 8/26/2022
Issuing Office
Metro
Current Status
CofO Issued on 12/12/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/8/2021 APPLICANT
Assigned to Plan Check Engineer 3/11/2021 KEVIN MORALES
Corrections Issued 3/30/2021 KEVIN MORALES
Quality Review Completed 4/1/2021 EUGENE BARBEAU
Building Plans Picked Up 4/8/2021 APPLICANT
Applicant returned to address corrections 5/27/2021 KEVIN MORALES
Applicant returned to address corrections 7/21/2021 KEVIN MORALES
Applicant returned to address corrections 9/1/2021 KEVIN MORALES
Applicant returned to address corrections 5/18/2022 KEVIN MORALES
Plan Check Approved 8/15/2022 KEVIN MORALES
Issued 8/26/2022 APPLICANT
CofO in Progress 12/11/2025 MANUEL TEJADA
Permit Finaled 12/12/2025 JEFFREY DURAN
CofO Issued 12/12/2025 JEFFREY DURAN
Permit Finaled 12/12/2025 JEFFREY DURAN

Permit Application Clearance Information

Flood clearance Cleared 6/14/2021 TIFFANY WONG
Eng Process Fee Ord 176,300 Cleared 7/19/2021 GABRIEL ROBLES
Construction within easement Cleared 7/28/2021 WALTER RAMIREZ
Trees in Parkway Cleared 9/2/2021 JOHN KIM
Sewer availability Cleared 9/28/2021 LEE GUILBEAUX
Address approval Cleared 10/4/2021 GABRIEL ROBLES
Metro Rail approval Cleared 10/19/2021 KEVIN MORALES
Highway dedication Cleared 10/26/2021 CARLOS AGUILERA
Permit Cleared 10/26/2021 CARLOS AGUILERA
Watercourse Cleared 10/27/2021 CARLOS AGUILERA
DAS Clearance Cleared 6/23/2022 KEVIN MORALES
Hydrant and Access approval Cleared 7/5/2022 KURT CORRAL
Building over 36-ft Cleared 7/8/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/8/2022 CALOSHA APPROVED
Miscellaneous Cleared 7/13/2022 LEE GUILBEAUX
Green Code Cleared 7/14/2022 AARON COSTA
Fire Marshal Fire Life Safety Cleared 7/20/2022 MENOA AGHAJANI
Low Impact Development Cleared 7/28/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 7/29/2022 LEE GUILBEAUX
"Q" conditions Cleared 8/10/2022 KIMBERLY HENRY
"T" removal Cleared 8/10/2022 KIMBERLY HENRY
CPC Cleared 8/10/2022 KIMBERLY HENRY
Miscellaneous Cleared 8/10/2022 JAZMIN ROQUE
Miscellaneous Cleared 8/10/2022 KIMBERLY HENRY
Opn space landscape/Water mgmt Cleared 8/10/2022 KIMBERLY HENRY
Tract Map conditions Cleared 8/10/2022 KIMBERLY HENRY
Tract Map conditions Cleared 8/10/2022 KIMBERLY HENRY
ZA Case Cleared 8/10/2022 KIMBERLY HENRY
ZA Case Cleared 8/10/2022 KIMBERLY HENRY
ZI Cleared 8/10/2022 JAZMIN ROQUE

Contact Information

Contractor Uncommon Builders Llc; Lic. No.: 1046026-B 9220 WINNETKA AVE      CHATSWORTH, CA 91311
Engineer Nishi,, Thomas Yoshimasa; Lic. No.: S4030 1615 BUCKINGHAM RD      LOS ANGELES, CA 90019

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 9/7/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/8/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/9/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/12/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/13/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/14/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/15/2022 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 9/15/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/16/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/19/2022 Conditional Approval JOHN KITCKO
Piling/Pier/Caisson 9/19/2022 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 9/20/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/21/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/22/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/27/2022 Conditional Approval JEFFREY DURAN
Piling/Pier/Caisson 10/12/2022 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/17/2022 Not Ready for Inspection ROBERT DAVIS
Footing/Foundation/Slab 10/17/2022 Not Ready for Inspection ROBERT DAVIS
Footing/Foundation/Slab 11/17/2022 Partial Inspection CAMERON CHABAN
Green Building Rough 11/18/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 11/18/2022 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 11/18/2022 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 11/21/2022 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 11/21/2022 Partial Inspection CAMERON CHABAN
Footing/Foundation/Slab 11/23/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/28/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/29/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 11/29/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/30/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/1/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/2/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/5/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/6/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/6/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/7/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/7/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 12/7/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/8/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/8/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/9/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/9/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/12/2022 Conditional Approval DANIEL VARNUM
Deputy Shotcrete 12/14/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/15/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/16/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 12/21/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/23/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/27/2022 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/29/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 12/29/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/30/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 1/5/2023 Not Ready for Inspection CAMERON CHABAN
Special/Order Compliance 1/5/2023 Not Ready for Inspection STEVEN LEVITT
Footing/Foundation/Slab 1/6/2023 Partial Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 1/7/2023 Partial Approval CAMERON CHABAN
Piling/Pier/Caisson 1/20/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/23/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 1/23/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 1/24/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 1/24/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/25/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/25/2023 Conditional Approval STEVEN LEVITT
Piling/Pier/Caisson 1/25/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 1/26/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/27/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/27/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 1/27/2023 Partial Approval CAMERON CHABAN
Deputy Shotcrete 1/31/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 1/31/2023 Partial Approval CAMERON CHABAN
Piling/Pier/Caisson 1/31/2023 Partial Inspection CAMERON CHABAN
Deputy Shotcrete 2/1/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 2/1/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/2/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/2/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/6/2023 Conditional Approval STEVEN LEVITT
Deputy Shotcrete 2/6/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/6/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 2/6/2023 Not Ready for Inspection CAMERON CHABAN
Special/Order Compliance 2/6/2023 Not Ready for Inspection STEVEN LEVITT
Deputy Reinf. Concrete 2/8/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/8/2023 Conditional Approval STEVEN LEVITT
Footing/Foundation/Slab 2/8/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 2/8/2023 Partial Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/9/2023 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 2/9/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/10/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 2/10/2023 Partial Inspection CAMERON CHABAN
Special/Order Compliance 2/10/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/14/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/14/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/15/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 2/15/2023 Partial Approval CAMERON CHABAN
Piling/Pier/Caisson 2/15/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/16/2023 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 2/16/2023 Partial Approval DANIEL VARNUM
Deputy Reinf. Concrete 2/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/17/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 2/21/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/22/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/22/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/23/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/23/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 2/23/2023 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 2/24/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/2/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/3/2023 Conditional Approval JEFFREY FULTON
Deputy Pre-Stress Concrete 3/6/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/7/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 3/7/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/8/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/8/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/9/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/10/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 3/14/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/17/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 3/17/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 3/18/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/20/2023 Conditional Approval STEVEN LEVITT
Deputy Pre-Stress Concrete 3/23/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 3/23/2023 Conditional Approval STEVEN LEVITT
Deputy Pre-Stress Concrete 3/24/2023 Conditional Approval STEVEN LEVITT
Deputy Pre-Stress Concrete 3/28/2023 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 3/29/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 3/30/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Pre-Stress Concrete 3/31/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/31/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/3/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 4/3/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/4/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 4/4/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/5/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 4/6/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/7/2023 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 4/7/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 4/10/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 4/11/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 4/12/2023 Conditional Approval CAMERON CHABAN
Green Building Rough 4/12/2023 Not Ready for Inspection CAMERON CHABAN
Reinforced Masonry Frame 4/12/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 4/12/2023 Partial Approval STEVEN LEVITT
Verify Sprinkler Sign Off 4/12/2023 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 4/13/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/14/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 4/14/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/19/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 4/20/2023 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 4/20/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/21/2023 Conditional Approval STEVEN LEVITT
Deputy Shotcrete 4/24/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 4/25/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 4/27/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 4/28/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/28/2023 Conditional Approval STEVEN LEVITT
Footing/Foundation/Slab 4/28/2023 Partial Inspection CAMERON CHABAN
Masonry Wall/Backfill 5/3/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 5/4/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/5/2023 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 5/9/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 5/10/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 5/10/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 5/11/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/12/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 5/12/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 5/16/2023 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 5/17/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 5/17/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 5/18/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 5/18/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 5/19/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 5/19/2023 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 5/19/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 5/23/2023 Conditional Approval JEFFREY FULTON
Reinforced Concrete Frame 5/23/2023 Partial Inspection JEFFREY FULTON
Deputy Fireproofing 5/25/2023 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 5/25/2023 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 5/25/2023 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/26/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 5/30/2023 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/31/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/1/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/2/2023 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 6/2/2023 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 6/5/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/6/2023 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/8/2023 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/12/2023 Conditional Approval STEVEN LEVITT
Special/Order Compliance 6/12/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/13/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/14/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/15/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 6/16/2023 Conditional Approval STEVEN LEVITT
Deputy Shotcrete 6/16/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/20/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/21/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/22/2023 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 6/22/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 6/23/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/23/2023 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 6/26/2023 Partial Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 6/29/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/3/2023 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 7/3/2023 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 7/5/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/6/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/10/2023 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 7/11/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/13/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/17/2023 Partial Approval CAMERON CHABAN
Green Building Rough 7/18/2023 Not Ready for Inspection CAMERON CHABAN
Reinforced Masonry Frame 7/18/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 7/18/2023 Not Ready for Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/19/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/20/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/20/2023 Partial Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/25/2023 Partial Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 7/26/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/27/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 7/31/2023 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 8/1/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/3/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/4/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 8/4/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 8/7/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/8/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/10/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/14/2023 Approved STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 8/16/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/17/2023 Partial Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 8/18/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/18/2023 Partial Approval CAMERON CHABAN
Footing/Foundation/Slab 8/21/2023 Not Ready for Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/23/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 8/23/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/24/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/28/2023 Conditional Approval KENNETH ROBERTS
Excavation/Setback/Form/Re-Bar 8/29/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/31/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 9/6/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 9/14/2023 Corrections Issued JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/15/2023 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/19/2023 No Result Entered RICKEY JACKSON
Masonry Wall/Backfill 9/19/2023 Partial Approval STEVEN LEVITT
Deputy Steel/Welding 9/20/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 9/20/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 9/21/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 9/22/2023 Conditional Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 9/27/2023 Not Ready for Inspection CAMERON CHABAN
Masonry Wall/Backfill 9/27/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 9/28/2023 Partial Approval CAMERON CHABAN
Green Building Rough 9/28/2023 Partial Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 9/28/2023 Not Ready for Inspection CAMERON CHABAN
Wood Frame 9/28/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 9/29/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/3/2023 Partial Inspection JEFFREY FULTON
Masonry Wall/Backfill 10/4/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/6/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/11/2023 Not Ready for Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/13/2023 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 10/17/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 10/17/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 10/18/2023 Conditional Approval CAMERON CHABAN
Green Building Rough 10/18/2023 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 10/18/2023 Partial Approval CAMERON CHABAN
Verify Sprinkler Sign Off 10/18/2023 Partial Inspection CAMERON CHABAN
Wood Frame 10/18/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 10/19/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/23/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 10/24/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/24/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 10/25/2023 Partial Approval CAMERON CHABAN
Green Building Rough 10/25/2023 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 10/25/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/27/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 10/30/2023 Not Ready for Inspection CAMERON CHABAN
Green Building Rough 10/30/2023 Not Ready for Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/31/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/1/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 11/2/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 11/6/2023 Partial Approval STEVEN LEVITT
Deputy Steel/Welding 11/9/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 11/9/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 11/13/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 11/13/2023 Partial Approval CAMERON CHABAN
Green Building Rough 11/13/2023 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 11/15/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 11/16/2023 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 11/16/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 11/21/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 11/21/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 11/22/2023 Conditional Approval CAMERON CHABAN
Deputy Drilled-In Anchors 11/27/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 11/27/2023 Conditional Approval CAMERON CHABAN
Pre-Inspection 11/27/2023 Partial Inspection CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 11/28/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 11/29/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 11/30/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 12/1/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 12/1/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 12/4/2023 Conditional Approval JEFFREY FULTON
Drywall Nailing 12/4/2023 Partial Inspection JEFFREY FULTON
Green Building Rough 12/4/2023 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 12/4/2023 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 12/5/2023 Conditional Approval CAMERON CHABAN
Light Gage Steel Frame 12/7/2023 Partial Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 12/11/2023 Not Ready for Inspection STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 12/13/2023 Partial Approval STEVEN LEVITT
Deputy Steel/Welding 12/27/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 1/9/2024 Not Ready for Inspection STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 1/10/2024 Partial Approval STEVEN LEVITT
Floor/Roof Diaphrgm/Shear Wall 1/11/2024 Partial Approval STEVEN LEVITT
Insulation 1/11/2024 Partial Approval STEVEN LEVITT
Drywall Nailing 1/18/2024 Partial Approval MARTIN TAVITIAN
Green Building Rough 1/18/2024 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 1/18/2024 Partial Approval MARTIN TAVITIAN
Wood Frame 1/18/2024 Partial Approval MARTIN TAVITIAN
Floor/Roof Diaphrgm/Shear Wall 1/23/2024 Partial Approval STEVEN LEVITT
Drywall Nailing 1/25/2024 Partial Approval STEVEN LEVITT
Floor/Roof Diaphrgm/Shear Wall 1/29/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 1/29/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 1/29/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 1/29/2024 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 1/30/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/31/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 1/31/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 2/6/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 2/6/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 2/15/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 2/15/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 2/15/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 2/15/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 2/21/2024 Partial Inspection JEFFREY FULTON
Wall Anchors 2/23/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/27/2024 Partial Approval ROBERT DAVIS
Green Building Rough 2/27/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 2/28/2024 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 2/29/2024 Partial Approval GREGORY POMISH
Green Building Rough 3/4/2024 Partial Inspection GREGORY POMISH
Insulation 3/4/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 3/4/2024 Partial Inspection GREGORY POMISH
Wood Frame 3/4/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/6/2024 Partial Approval GREGORY POMISH
Special/Order Compliance 3/6/2024 Partial Approval GREGORY POMISH
Deputy Wood Construction 3/8/2024 Conditional Approval GREGORY POMISH
Green Building Rough 3/8/2024 Partial Inspection GREGORY POMISH
Deputy Wood Construction 3/11/2024 Conditional Approval GREGORY POMISH
Deputy Wood Construction 3/13/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/13/2024 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/13/2024 Partial Approval GREGORY POMISH
Deputy Wood Construction 3/15/2024 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/18/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 3/19/2024 Conditional Approval GREGORY POMISH
Deputy Wood Construction 3/20/2024 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/21/2024 Partial Approval ROBERT DAVIS
Insulation 3/21/2024 Partial Approval ROBERT DAVIS
Deputy Wood Construction 3/22/2024 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 3/26/2024 No Access for Inspection DANIEL VARNUM
Drywall Nailing 3/26/2024 Partial Approval DEANDRE HOFFMAN
Green Building Rough 3/26/2024 No Access for Inspection DANIEL VARNUM
Insulation 3/27/2024 Partial Approval GREGORY POMISH
Insulation 4/3/2024 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 4/4/2024 Partial Approval GREGORY POMISH
Green Building Rough 4/4/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 4/8/2024 Partial Inspection GREGORY POMISH
Green Building Rough 4/8/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 4/8/2024 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 4/8/2024 Partial Inspection GREGORY POMISH
Insulation 4/10/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/11/2024 Partial Approval GREGORY POMISH
Insulation 4/15/2024 Partial Approval GREGORY POMISH
Drywall Nailing 4/18/2024 Partial Approval GREGORY POMISH
Green Building Rough 4/18/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/18/2024 Partial Approval GREGORY POMISH
Insulation 4/19/2024 Partial Approval GREGORY POMISH
Drywall Nailing 4/24/2024 Partial Approval GREGORY POMISH
Green Building Rough 4/24/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 4/24/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 4/25/2024 Partial Approval GREGORY POMISH
Insulation 4/29/2024 Not Ready for Inspection DEANDRE HOFFMAN
Insulation 5/1/2024 Not Ready for Inspection JEFFREY DURAN
Light Gage Steel Frame 5/1/2024 Not Ready for Inspection JEFFREY DURAN
Light Gage Steel Frame 5/2/2024 Partial Approval JOHN KITCKO
Drywall Nailing 5/6/2024 Partial Approval ROBERT DAVIS
Green Building Rough 5/6/2024 Approved ROBERT DAVIS
Insulation 5/6/2024 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 5/7/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 5/8/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/9/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 5/15/2024 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 5/15/2024 Partial Approval GREGORY POMISH
Drywall Nailing 5/16/2024 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 5/16/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/16/2024 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 5/17/2024 Partial Inspection GREGORY POMISH
Insulation 5/17/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/20/2024 Partial Approval GREGORY POMISH
Insulation 5/21/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/21/2024 Partial Inspection GREGORY POMISH
Insulation 5/22/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/22/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/23/2024 Partial Approval GREGORY POMISH
Drywall Nailing 5/24/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 5/24/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/28/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 5/29/2024 Partial Approval GREGORY POMISH
Insulation 6/10/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/11/2024 Partial Approval DEANDRE HOFFMAN
Insulation 6/11/2024 Partial Approval DEANDRE HOFFMAN
Light Gage Steel Frame 6/11/2024 Partial Approval DEANDRE HOFFMAN
Insulation 6/13/2024 Not Ready for Inspection DEANDRE HOFFMAN
Drywall Nailing 6/17/2024 Partial Approval GREGORY POMISH
Insulation 6/17/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/17/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 6/20/2024 Partial Approval GREGORY POMISH
Deputy Steel/Welding 6/26/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/27/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/28/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/1/2024 Conditional Approval DEANDRE HOFFMAN
Insulation 7/1/2024 Partial Approval DEANDRE HOFFMAN
Light Gage Steel Frame 7/1/2024 Partial Inspection DEANDRE HOFFMAN
Deputy Steel/Welding 7/3/2024 Conditional Approval JEFFREY DURAN
Light Gage Steel Frame 7/3/2024 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 7/8/2024 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 7/10/2024 Partial Approval GREGORY POMISH
Insulation 7/11/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 7/12/2024 Partial Approval GREGORY POMISH
Insulation 7/12/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 7/15/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 7/16/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 7/17/2024 Partial Approval GREGORY POMISH
Drywall Nailing 7/22/2024 Partial Approval ROBERT DAVIS
Insulation 7/22/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/22/2024 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 8/1/2024 Partial Approval GREGORY POMISH
Insulation 8/1/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/1/2024 Partial Approval GREGORY POMISH
Drywall Nailing 8/5/2024 Partial Approval GREGORY POMISH
Drywall Nailing 8/12/2024 Partial Approval GREGORY POMISH
Insulation 8/12/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/12/2024 Partial Inspection GREGORY POMISH
Insulation 8/15/2024 Partial Approval GREGORY POMISH
Drywall Nailing 8/19/2024 Partial Approval GREGORY POMISH
Insulation 8/20/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/20/2024 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 8/21/2024 Partial Inspection GREGORY POMISH
Wood Frame 8/21/2024 Partial Approval GREGORY POMISH
Insulation 8/22/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 8/23/2024 Partial Approval GREGORY POMISH
Drywall Nailing 8/28/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/16/2024 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 9/16/2024 Partial Inspection GREGORY POMISH
Wood Frame 9/16/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 9/18/2024 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/18/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/18/2024 Partial Inspection GREGORY POMISH
Wood Frame 9/18/2024 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 9/23/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/23/2024 Partial Inspection GREGORY POMISH
Wood Frame 9/23/2024 Partial Approval GREGORY POMISH
Drywall Nailing 9/24/2024 Partial Inspection GREGORY POMISH
Insulation 9/24/2024 Partial Approval GREGORY POMISH
Insulation 9/27/2024 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 9/27/2024 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/30/2024 Not Ready for Inspection GREGORY POMISH
Insulation 9/30/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/30/2024 Partial Inspection GREGORY POMISH
Wood Frame 9/30/2024 Partial Approval GREGORY POMISH
Insulation 10/1/2024 Partial Approval GREGORY POMISH
Insulation 10/2/2024 Partial Inspection GREGORY POMISH
Insulation 10/3/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 10/3/2024 Partial Inspection GREGORY POMISH
Insulation 10/4/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 10/4/2024 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/7/2024 Partial Inspection GREGORY POMISH
Insulation 10/7/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/7/2024 Partial Inspection GREGORY POMISH
Insulation 10/16/2024 Partial Approval DEANDRE HOFFMAN
Light Gage Steel Frame 10/16/2024 Partial Approval DEANDRE HOFFMAN
Drywall Nailing 10/17/2024 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 10/17/2024 Not Ready for Inspection GREGORY POMISH
Wood Frame 10/17/2024 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/18/2024 Not Ready for Inspection GREGORY POMISH
Wood Frame 10/18/2024 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 10/23/2024 Partial Approval GREGORY POMISH
Insulation 10/23/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/23/2024 Partial Approval GREGORY POMISH
Insulation 10/30/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/30/2024 Partial Approval GREGORY POMISH
Insulation 11/1/2024 Partial Approval GREGORY POMISH
Drywall Nailing 11/6/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 11/6/2024 Partial Approval GREGORY POMISH
Insulation 11/14/2024 Partial Approval JOHN KITCKO
Light Gage Steel Frame 11/14/2024 Partial Approval JOHN KITCKO
Insulation 11/19/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/19/2024 Partial Approval GREGORY POMISH
Insulation 12/4/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 12/9/2024 Partial Approval GREGORY POMISH
Drywall Nailing 1/16/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/17/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/24/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/27/2025 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 1/31/2025 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 1/31/2025 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 2/4/2025 Partial Approval GREGORY POMISH
Drywall Nailing 2/10/2025 Partial Approval GREGORY POMISH
Insulation 2/18/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 2/18/2025 Not Ready for Inspection GREGORY POMISH
Insulation 2/19/2025 Partial Approval GREGORY POMISH
Insulation 2/21/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 2/21/2025 Partial Approval GREGORY POMISH
Drywall Nailing 2/24/2025 Partial Approval GREGORY POMISH
Insulation 3/7/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/7/2025 Partial Approval GREGORY POMISH
Drywall Nailing 3/13/2025 Partial Approval GREGORY POMISH
Drywall Nailing 3/19/2025 Partial Approval GREGORY POMISH
Insulation 4/3/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/3/2025 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 4/28/2025 No Access for Inspection MARTIN TAVITIAN
Verify Sprinkler Sign Off 4/28/2025 No Access for Inspection MARTIN TAVITIAN
Drywall Nailing 5/1/2025 Partial Approval GREGORY POMISH
Insulation 5/5/2025 Partial Approval GREGORY POMISH
Drywall Nailing 6/2/2025 Partial Inspection GREGORY POMISH
Final 6/2/2025 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 6/2/2025 Partial Inspection GREGORY POMISH
Green Building Final 6/2/2025 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 6/2/2025 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 6/2/2025 Partial Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 6/2/2025 SGSOV Not Ready GREGORY POMISH
Smoke Detectors 6/2/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 6/2/2025 Partial Inspection GREGORY POMISH
Wood Frame 6/2/2025 Partial Inspection GREGORY POMISH
Insulation 6/27/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/27/2025 Partial Approval GREGORY POMISH
Drywall Nailing 7/24/2025 Partial Approval GREGORY POMISH
Drywall Nailing 8/13/2025 Partial Approval DEANDRE HOFFMAN
Drywall Nailing 9/10/2025 Partial Inspection GREGORY POMISH
Drywall Nailing 10/21/2025 Partial Inspection GREGORY POMISH
Final 10/21/2025 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 10/21/2025 Partial Inspection GREGORY POMISH
Green Building Final 10/21/2025 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 10/21/2025 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 10/21/2025 Partial Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 10/21/2025 SGSOV Not Ready GREGORY POMISH
Smoke Detectors 10/21/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 10/21/2025 Partial Inspection GREGORY POMISH
Wood Frame 10/21/2025 Partial Inspection GREGORY POMISH
Drywall Nailing 11/18/2025 Approved GREGORY POMISH
Final 11/18/2025 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 11/18/2025 Approved GREGORY POMISH
Green Building Final 11/18/2025 Approved GREGORY POMISH
Reinforced Concrete Frame 11/18/2025 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 11/18/2025 Partial Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 11/18/2025 SGSOV Approved GREGORY POMISH
Smoke Detectors 11/18/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 11/18/2025 Partial Inspection GREGORY POMISH
Wood Frame 11/18/2025 Partial Inspection GREGORY POMISH
Final 11/29/2025 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 11/29/2025 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 11/29/2025 Partial Approval GREGORY POMISH
Smoke Detectors 11/29/2025 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/29/2025 Partial Approval GREGORY POMISH
Wood Frame 11/29/2025 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/3/2025 Approved GREGORY POMISH