1021 N VERMONT AVE 90029

Certificate Information: 1021 N VERMONT AVE 90029

Application / Permit
21010-10000-00389
Plan Check / Job No.
B21LA01309
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 6 STORY 100% (94 ELI + 91 VLI, AND 2 MARKET RATE) PERMANENT SUPPORTIVE HOUSING APARTMENT TO INCLUDE 5 STORY TYPE IIIA APARTMENT OVER 1 STORY TYPE IA COMMERCIAL OVER 1 LEVEL TYPE IA SUBTERRANEAN PARKING, TIER 4 TOC WITH ADDITIONAL INCENTIVES. ***NO CONSTRUCTION SHALL START UNTIL ALL AFFIDAVITS ARE RECORDED. A SUPPLEMENTAL PERMIT WILL BE REQUIRED TO CAPTURE AFFIDAVITS AND TO OBTAIN CLEARANCE WITH DEPARTMENT OF CITY PLANNING FOR AFFIDAVITS***
Permit Issued
Issued on 2/8/2022
Issuing Office
Metro
Current Status
CofO Issued on 7/31/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Plan Check Approved 2/8/2022 VU NGUYEN
Issued 2/8/2022 APPLICANT
TCO Issued (Expire Date: 08-19-2025) 2/20/2025 ADAM BURGESS
CofO in Progress 7/31/2025 DAVID BURKHEAD
Permit Finaled 7/31/2025 ADAM BURGESS
CofO Issued 7/31/2025 ADAM BURGESS
Permit Finaled 7/31/2025 ADAM BURGESS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 5/13/2021 THOMAS LANG
Permit Cleared 5/13/2021 THOMAS LANG
Highway dedication Cleared 8/4/2021 THOMAS LANG
Building over 36-ft Cleared 9/23/2021 CALOSHA APPROVED
Hydrant and Access approval Cleared 10/11/2021 ROBERT DUFF
Address approval Cleared 10/19/2021 THOMAS LANG
Construction near power lines Cleared 11/16/2021 RIDWAN HARDY
Metro Rail approval Cleared 12/8/2021 VU NGUYEN
Sewer availability Cleared 1/13/2022 STEVE MELGAR
Comm Cor/Mini-Mall Cleared 1/19/2022 MAXFIELD VERMY
Miscellaneous Cleared 1/19/2022 MAXFIELD VERMY
Miscellaneous Cleared 1/19/2022 MAXFIELD VERMY
Miscellaneous Cleared 1/19/2022 MAXFIELD VERMY
Miscellaneous Cleared 1/19/2022 MAXFIELD VERMY
ZA Case Cleared 1/19/2022 MAXFIELD VERMY
ZI Cleared 1/19/2022 MAXFIELD VERMY
Fire Marshal Fire Life Safety Cleared 1/24/2022 MENOA AGHAJANI
DCP conditions approval Cleared 1/25/2022 JAMES MCCARTHY
Density Bonus 12.22.A.31 Cleared 1/25/2022 JAMES MCCARTHY
Green Code Cleared 1/25/2022 VU NGUYEN
Public Housing Cleared 1/25/2022 JOEL LAUNCHBAUGH
Low Impact Development Cleared 1/27/2022 MARTIN FRAGOSO
Frnt yard landscape/Water mgmt Cleared 1/28/2022 MAXFIELD VERMY
Miscellaneous Cleared 1/28/2022 MAXFIELD VERMY
Opn space landscape/Water mgmt Cleared 1/28/2022 MAXFIELD VERMY
Site Plan review Cleared 1/28/2022 MAXFIELD VERMY
Bicycle Parking Cleared 1/31/2022 JEREMY CHOK
DAS Clearance Cleared 2/1/2022 VU NGUYEN
Trees in Parkway Cleared 2/3/2022 ADRIAN SANCHEZ
Miscellaneous Cleared 2/4/2022 MAXFIELD VERMY
Roof/Waste drainage to street Cleared 2/4/2022 THAN WIN
Specific Plan Cleared 2/4/2022 MAXFIELD VERMY
Work Adjacent to Public Way Cleared 2/4/2022 JOSE RODRIGUEZ

Contact Information

Architect Koning,, Hendrik; Lic. No.: C13530 1454 25TH STREET      SANTA MONICA, CA 90404
Contractor Walton Construction Inc; Lic. No.: 1034491-B 358 E FOOTHILL BLVD STE 100      SAN DIMAS, CA 91773
Engineer Funk,, David Lyle; Lic. No.: S5421 319 MAIN STREET      EL SEGUNDO, CA 90245
Engineer Knur,, Reinard Thomas; Lic. No.: GE2755 1435 MONCADO DR      GLENDALE, CA 91207

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/29/2022 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/19/2022 Corrections Issued TED RIES
Grading Pre-Inspection 6/9/2022 Partial Inspection DAVID BURKHEAD
Deputy Grading 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 6/23/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/23/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 6/23/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/29/2022 Partial Approval DAVID BURKHEAD
Structural Steel Frame 6/29/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/5/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/5/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/8/2022 Conditional Approval ERNESTO CORRAL
Piling/Pier/Caisson 7/8/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 7/11/2022 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/11/2022 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/11/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/11/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Grading 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Grading 7/14/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/14/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 7/14/2022 Partial Approval TED RIES
Deputy Grading 7/15/2022 Conditional Approval TED RIES
Deputy Grading 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Grading 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Grading 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Grading 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Grading 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Grading 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Grading 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/2/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/2/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/2/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/2/2022 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 8/2/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/8/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/8/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/17/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/18/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/18/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 8/18/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 8/18/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/19/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 8/19/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 8/22/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/24/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/24/2022 Conditional Approval TED RIES
Green Building Rough 8/24/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/24/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 8/24/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 8/25/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/25/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/26/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/26/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/29/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/29/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/29/2022 Conditional Approval TED RIES
Green Building Rough 8/29/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/29/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 8/29/2022 Not Ready for Inspection TED RIES
Deputy Shotcrete 8/30/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 8/30/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 8/31/2022 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/31/2022 Partial Approval TED RIES
Footing/Foundation/Slab 8/31/2022 Partial Approval TED RIES
Masonry Wall/Backfill 8/31/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 9/1/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/1/2022 Conditional Approval TED RIES
Deputy Shotcrete 9/1/2022 Conditional Approval TED RIES
Green Building Rough 9/1/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 9/1/2022 Conditional Approval TED RIES
Verify Sprinkler Sign Off 9/1/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/6/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/6/2022 Conditional Approval TED RIES
Deputy Shotcrete 9/6/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/7/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 9/7/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/7/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/7/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 9/8/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/8/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/8/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/8/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/9/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/9/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 9/9/2022 Conditional Approval NICK DANERI
Deputy Shotcrete 9/9/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/9/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 9/14/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 9/14/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 9/14/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/15/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/16/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/16/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/19/2022 Conditional Approval TED RIES
Deputy Shotcrete 9/19/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 9/19/2022 Not Ready for Inspection TED RIES
Reinforced Masonry Frame 9/19/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 9/20/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/20/2022 Conditional Approval TED RIES
Deputy Shotcrete 9/20/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/21/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 9/22/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 9/22/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 9/22/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 9/26/2022 Conditional Approval TED RIES
Deputy Shotcrete 9/26/2022 Conditional Approval TED RIES
Deputy Shotcrete 9/27/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 9/29/2022 Partial Inspection TED RIES
Green Building Rough 9/29/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 9/29/2022 Partial Inspection TED RIES
Verify Sprinkler Sign Off 9/29/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 10/3/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 10/7/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/7/2022 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 10/7/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/7/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/7/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/13/2022 Conditional Approval TED RIES
Deputy Shotcrete 10/13/2022 Conditional Approval TED RIES
Green Building Rough 10/13/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 10/13/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 10/13/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 10/17/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 10/20/2022 Not Ready for Inspection TED RIES
Reinforced Masonry Frame 10/21/2022 Not Ready for Inspection TED RIES
Special/Order Compliance 10/21/2022 Approved TED RIES
Green Building Rough 10/24/2022 Not Ready for Inspection TED RIES
Insulation 10/24/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 10/24/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 10/24/2022 Not Ready for Inspection TED RIES
Deputy Grading 10/26/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/26/2022 Conditional Approval TED RIES
Deputy Shotcrete 10/26/2022 Conditional Approval TED RIES
Piling/Pier/Caisson 10/26/2022 Partial Approval TED RIES
Wall Anchors 10/26/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 10/28/2022 Partial Approval TED RIES
Green Building Rough 10/31/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 10/31/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 10/31/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 11/2/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 11/2/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 11/2/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 11/7/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 11/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 11/18/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 11/21/2022 Conditional Approval TED RIES
Green Building Rough 11/21/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/21/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/21/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/30/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/8/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/9/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/12/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 12/12/2022 Not Ready for Inspection TED RIES
Green Building Rough 12/12/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 12/12/2022 Not Ready for Inspection TED RIES
Verify Sprinkler Sign Off 12/12/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 12/13/2022 Conditional Approval TED RIES
Masonry Wall/Backfill 12/13/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 12/13/2022 Partial Approval TED RIES
Reinforced Masonry Frame 12/13/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 12/14/2022 Conditional Approval TED RIES
Green Building Rough 12/19/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 12/19/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 12/19/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 12/20/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/20/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 12/20/2022 No Access for Inspection TED RIES
Deputy Reinf. Concrete 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/22/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/22/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 12/22/2022 Conditional Approval TED RIES
Verify Sprinkler Sign Off 12/22/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 12/23/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/23/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 12/28/2022 Partial Approval TED RIES
Light Gage Steel Frame 1/13/2023 Corrections Issued TED RIES
Drywall Nailing 1/17/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/26/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/26/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/26/2023 Conditional Approval TED RIES
Deputy Wood Construction 1/26/2023 Conditional Approval TED RIES
Footing/Foundation/Slab 1/26/2023 Partial Approval TED RIES
Green Building Rough 1/26/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 1/26/2023 Partial Approval TED RIES
Verify Sprinkler Sign Off 1/26/2023 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 1/27/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/27/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/27/2023 Conditional Approval TED RIES
Deputy Wood Construction 1/27/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/30/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/30/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/30/2023 Conditional Approval TED RIES
Deputy Wood Construction 1/30/2023 Conditional Approval TED RIES
Footing/Foundation/Slab 1/30/2023 Partial Approval TED RIES
Masonry Wall/Backfill 1/30/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 1/31/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/31/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/31/2023 Conditional Approval TED RIES
Deputy Wood Construction 1/31/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/1/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/1/2023 Conditional Approval TED RIES
Deputy Steel/Welding 2/1/2023 Conditional Approval TED RIES
Deputy Wood Construction 2/1/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 2/1/2023 Partial Approval TED RIES
Masonry Wall/Backfill 2/1/2023 Not Ready for Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 2/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/7/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/7/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/7/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 2/7/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/14/2023 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 2/14/2023 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/16/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/16/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/21/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 2/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 2/23/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/23/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/23/2023 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 2/24/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/27/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 3/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/3/2023 Conditional Approval TED RIES
Light Gage Steel Frame 3/3/2023 Corrections Issued TED RIES
Deputy Reinf. Masonry 3/6/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/6/2023 Conditional Approval TED RIES
Masonry Wall/Backfill 3/6/2023 Partial Approval TED RIES
Deputy Steel/Welding 3/7/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 3/7/2023 Partial Approval TED RIES
Deputy Steel/Welding 3/8/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/8/2023 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/10/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 3/28/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 3/29/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/29/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/29/2023 Conditional Approval TED RIES
Deputy Wood Construction 3/29/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/30/2023 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 3/30/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/30/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 3/30/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/30/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/3/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/3/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/3/2023 Conditional Approval TED RIES
Deputy Wood Construction 4/3/2023 Conditional Approval TED RIES
Light Gage Steel Frame 4/3/2023 Partial Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/6/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/10/2023 Not Ready for Inspection TED RIES
Wood Frame 4/12/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/13/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/13/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/14/2023 Not Ready for Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/17/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/17/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 4/18/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 4/18/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/18/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/18/2023 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 4/20/2023 Conditional Approval TED RIES
Deputy Wood Construction 4/20/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/20/2023 Partial Approval TED RIES
Deputy Steel/Welding 4/21/2023 Conditional Approval TED RIES
Deputy Wood Construction 4/21/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/24/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 4/24/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 4/24/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/25/2023 Partial Approval TED RIES
Verify Sprinkler Sign Off 4/25/2023 Conditional Approval TED RIES
Wood Frame 4/26/2023 Partial Approval RAFAEL ESPINOZA
Wood Frame 4/27/2023 Partial Inspection DAVID BURKHEAD
Insulation 4/28/2023 Partial Approval TED RIES
Insulation 5/2/2023 Partial Approval TED RIES
Wood Frame 5/3/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 5/4/2023 Not Ready for Inspection EDWIN GREGORYONA
Insulation 5/4/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 5/8/2023 Partial Inspection TED RIES
SGSOV-Seismic Gas S/O Valve 5/10/2023 SGSOV Not Ready EDWIN GREGORYONA
Wood Frame 5/10/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 5/11/2023 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/15/2023 Partial Approval DAVID BURKHEAD
Insulation 5/16/2023 Partial Approval DAVID BURKHEAD
Wood Frame 5/17/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Insulation 5/19/2023 Partial Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 5/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/23/2023 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/23/2023 Conditional Approval GREGORY POMISH
Wood Frame 5/23/2023 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/24/2023 Partial Approval EDWIN GREGORYONA
Insulation 5/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/31/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/31/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 5/31/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/1/2023 Conditional Approval MICHAEL ROSENBERG
Wood Frame 6/1/2023 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/2/2023 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Insulation 6/5/2023 Partial Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 6/6/2023 Conditional Approval TED RIES
Deputy Steel/Welding 6/6/2023 Conditional Approval TED RIES
Insulation 6/6/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 6/7/2023 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/7/2023 Conditional Approval GREGORY POMISH
Insulation 6/7/2023 Partial Inspection GREGORY POMISH
Wood Frame 6/7/2023 Partial Approval GREGORY POMISH
Wood Frame 6/8/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 6/13/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/13/2023 Conditional Approval RAFAEL ESPINOZA
Insulation 6/13/2023 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/13/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/14/2023 Partial Approval EDWIN GREGORYONA
Insulation 6/14/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 6/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/16/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/16/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 6/16/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/20/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/20/2023 Conditional Approval DAVID BURKHEAD
Insulation 6/20/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/21/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/21/2023 Conditional Approval DAVID BURKHEAD
Insulation 6/21/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/22/2023 Conditional Approval TIMOTHY POWELL
Deputy Steel/Welding 6/22/2023 Conditional Approval TIMOTHY POWELL
Drywall Nailing 6/22/2023 Partial Approval TIMOTHY POWELL
Deputy Drilled-In Anchors 6/26/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/26/2023 Conditional Approval DAVID BURKHEAD
Insulation 6/26/2023 Partial Approval DAVID BURKHEAD
Insulation 6/27/2023 Partial Approval TED RIES
Wood Frame 6/27/2023 Partial Approval TED RIES
Insulation 6/28/2023 Partial Approval EDWIN GREGORYONA
Insulation 6/29/2023 Partial Approval TED RIES
Insulation 7/5/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/6/2023 Partial Approval EDWIN GREGORYONA
Insulation 7/6/2023 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 7/10/2023 Partial Approval TED RIES
Wood Frame 7/10/2023 Partial Approval TED RIES
Drywall Nailing 7/11/2023 Partial Approval EDWIN GREGORYONA
Insulation 7/13/2023 Partial Approval TED RIES
Insulation 7/17/2023 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 7/19/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 7/19/2023 Partial Approval DAVID BURKHEAD
Insulation 7/21/2023 Not Ready for Inspection TED RIES
Insulation 7/26/2023 Not Ready for Inspection TIMOTHY POWELL
Insulation 7/28/2023 Partial Approval TED RIES
Wood Frame 7/31/2023 Partial Inspection DAVID BURKHEAD
Insulation 8/2/2023 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 8/7/2023 Partial Approval TED RIES
Wood Frame 8/7/2023 Partial Approval TED RIES
Insulation 8/9/2023 Partial Approval RAFAEL ESPINOZA
Wood Frame 8/10/2023 Partial Inspection DAVID BURKHEAD
Drywall Nailing 8/15/2023 Partial Approval TED RIES
Insulation 8/17/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 8/23/2023 Partial Approval TED RIES
Wood Frame 8/25/2023 Partial Approval EDWIN GREGORYONA
Insulation 8/30/2023 Partial Approval TIMOTHY POWELL
Insulation 8/31/2023 Partial Approval TIMOTHY POWELL
Insulation 9/1/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/5/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/7/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/8/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/3/2023 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 10/6/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/11/2023 Partial Approval TED RIES
Structural Steel Frame 10/11/2023 Partial Approval TED RIES
Drywall Nailing 10/25/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/2/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 11/13/2023 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 11/15/2023 Partial Approval EDWIN GREGORYONA
Pre-Inspection 11/28/2023 Partial Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 1/11/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 3/15/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/9/2024 Approved DAVID BURKHEAD
T-Bar Ceiling 8/13/2024 Partial Approval DAVID BURKHEAD
Deputy Grading 8/20/2024 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 8/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/23/2024 Conditional Approval DAVID BURKHEAD
Deputy Grading 8/26/2024 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 8/26/2024 Approved DAVID BURKHEAD
Deputy Grading 11/12/2024 Conditional Approval DAVID BURKHEAD
Pre-Inspection 1/29/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 1/30/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 2/4/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 2/11/2025 Approved DAVID BURKHEAD
Green Building Final 2/19/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 2/19/2025 Partial Inspection DAVID BURKHEAD
Final 2/20/2025 OK for TCO DAVID BURKHEAD
Footing/Foundation/Slab 2/20/2025 Approved DAVID BURKHEAD
Green Building Rough 2/20/2025 Approved DAVID BURKHEAD
Reinforced Concrete Frame 2/20/2025 Approved DAVID BURKHEAD
Reinforced Masonry Frame 2/20/2025 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 2/20/2025 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 2/20/2025 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 2/20/2025 Approved DAVID BURKHEAD
Special/Order Compliance 7/22/2025 Approved DAVID BURKHEAD
Final 7/30/2025 OK to Issue CofO DAVID BURKHEAD
Green Building Final 7/30/2025 Approved DAVID BURKHEAD