4720 N DESERET DR 91364

Certificate Information: 4720 N DESERET DR 91364

Application / Permit
20047-30000-02086
Plan Check / Job No.
B20WL05072
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
new pool & spa 30'x16'
Permit Issued
Issued on 1/4/2021
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/17/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Building Plans Picked Up 1/5/2020 APPLICANT
Submitted 11/30/2020 APPLICANT
Assigned to Plan Check Engineer 12/7/2020 MARJAN SHENASI
Corrections Issued 12/8/2020 MARJAN SHENASI
Plan Check Approved 12/24/2020 JASON JANGADA
Issued 1/4/2021 APPLICANT
CofO in Progress 5/6/2021 DAVID SANDOVAL
Permit Finaled 5/17/2021 MICHAEL SMITH
CofO Issued 5/17/2021 MICHAEL SMITH
Permit Finaled 5/17/2021 MICHAEL SMITH

Permit Application Clearance Information

Grading Pre-Inspection Cleared 12/24/2020 MARJAN SHENASI

Contact Information

Contractor Sunset Built Inc; Lic. No.: 1005054-B 5455 WILSHIRE BLVD #1811      LOS ANGELES, CA 90036
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

JOHN HAYES, (818) 774-4302 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 1/19/2021 Approved PAUL CHOPP
Rough-Electrical 1/19/2021 Partial Approval PAUL CHOPP
Rough-Plumbing 1/19/2021 Approved PAUL CHOPP
Deputy Shotcrete 1/20/2021 No Access for Inspection PETER FOLLING
Gas Piping or Gas Test 2/1/2021 Approved PAUL CHOPP
Grounding or Bonding 2/1/2021 Approved PAUL CHOPP
Deck 2/8/2021 Not Ready for Inspection PAUL CHOPP
Deck 2/10/2021 Approved PAUL CHOPP
Enclosure/Fence 3/26/2021 No Access for Inspection DAVID SANDOVAL
Enclosure/Fence 4/9/2021 Approved DAVID SCANTLIN
Pool Equipment Noise Test 4/9/2021 Approved ALFREDO FLORES
Excavation/Setback/Form/Re-Bar 4/20/2021 Approved DAVID SANDOVAL
Final 4/20/2021 Corrections Issued DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 4/20/2021 SGSOV Not Ready DAVID SANDOVAL
Final 5/5/2021 OK to Issue CofO DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 5/5/2021 SGSOV Approved DAVID SANDOVAL