4135 N FULTON AVE 91423

Certificate Information: 4135 N FULTON AVE 91423

Application / Permit
20047-20000-02310
Plan Check / Job No.
B20VN16449
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
REMODEL EXISTING 38' X 21' POOL TO ADD NEW 30'5" X 13'6" SWIMMING POOL WITH 8' X 8' ATTACHED SPA AS PER STANDARD PLAN # 268 INSIDE EXISTING POOL SHELL- SEE COMMENTS
Permit Issued
Issued on 3/12/2021
Issuing Office
Current Status
CofO Issued on 8/28/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/22/2020 APPLICANT
Assigned to Plan Check Engineer 12/30/2020 RARES BODEA
Corrections Issued 12/31/2020 RARES BODEA
Plan Check Approved 3/12/2021 RARES BODEA
Issued 3/12/2021 APPLICANT
Building Plans Picked Up 3/12/2021 APPLICANT
CofO in Progress 7/21/2021 ARAM AVEDISIAN
Permit Finaled 8/28/2021 MICHAEL SMITH
CofO Issued 8/28/2021 MICHAEL SMITH
Permit Finaled 8/28/2021 MICHAEL SMITH

Permit Application Clearance Information

Construction near power lines Cleared 3/5/2021 WALTER RAMIREZ
Grading Pre-Inspection Cleared 3/12/2021 RARES BODEA

Contact Information

Contractor Symphony Pools Inc; Lic. No.: 466383-C53 4685 RUNWAY STREET UNIT P      SIMI VALLEY, CA 93063
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/15/2021 Approved ARAM AVEDISIAN
Grounding or Bonding 4/15/2021 Partial Approval ARAM AVEDISIAN
Pool Piping 4/15/2021 Approved ARAM AVEDISIAN
Pre-Gunite 4/15/2021 Approved ARAM AVEDISIAN
Gas Piping or Gas Test 4/26/2021 Approved ARAM AVEDISIAN
Grounding or Bonding 4/26/2021 Approved ARAM AVEDISIAN
Gas Piping or Gas Test 5/25/2021 Approved ARAM AVEDISIAN
Enclosure/Fence 7/1/2021 Approved ARAM AVEDISIAN
Pool Equipment Noise Test 7/14/2021 No Access for Inspection FELIPE PENICHE
Pool Equipment Noise Test 7/15/2021 Approved FELIPE PENICHE
Final 7/19/2021 Corrections Issued ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 7/19/2021 SGSOV Approved ARAM AVEDISIAN
Final 7/21/2021 OK to Issue CofO ARAM AVEDISIAN