10740 W LINDBROOK DR 90024

Certificate Information: 10740 W LINDBROOK DR 90024

Application / Permit
20047-20000-01773
Plan Check / Job No.
B20VN13366
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 27'-7" X 20'-0" SWIMMING POOL AND 8'-0" X 8'-0" SPA WITHIN PER STANDARD PLAN #270
Permit Issued
Issued on 11/19/2020
Issuing Office
Current Status
CofO Issued on 4/26/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/14/2020 APPLICANT
Assigned to Plan Check Engineer 10/23/2020 JEROME MAGAT PALMA
Plan Check Approved 10/26/2020 JEROME MAGAT PALMA
Issued 11/19/2020 APPLICANT
CofO in Progress 4/26/2022 DANIEL ORRANTE
CofO in Progress 4/26/2022 DANIEL ORRANTE
Permit Finaled 4/26/2022 DANIEL ORRANTE
CofO Issued 4/26/2022 DANIEL ORRANTE
Permit Finaled 4/26/2022 DANIEL ORRANTE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 10/26/2020 JEROME MAGAT PALMA

Contact Information

Contractor Royal Moon Pools Inc; Lic. No.: 1041907-C53 2518 SAN MACHID WAY      ROSAMOND, CA 93560
Engineer Cristescu,, Barbu D; Lic. No.: C72038 14401 SYLVAN STREET 209      VAN NUYS, CA 91401

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pool Piping 11/25/2020 Approved GERMAN RODRIGUEZ MENDOZA
Pre-Gunite 11/25/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Deputy Shotcrete 12/4/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Deck 1/11/2021 Approved CARLOS MATAMOROS
Enclosure/Fence 2/18/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 2/18/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Enclosure/Fence 3/24/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Enclosure/Fence 3/30/2021 Corrections Issued ANTHONY MCDOWALL
Enclosure/Fence 4/19/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Enclosure/Fence 4/23/2021 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Equipment Noise Level 4/29/2021 Not Ready for Inspection ROBERT CHAVEZ
SGSOV-Seismic Gas S/O Valve 4/29/2021 SGSOV Not Ready GERMAN RODRIGUEZ MENDOZA
Excavation/Setback/Form/Re-Bar 5/5/2021 Approved GERMAN RODRIGUEZ MENDOZA
Final 5/5/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Pre-Gunite 5/5/2021 Approved GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 5/5/2021 SGSOV Not Required GERMAN RODRIGUEZ MENDOZA
Pool Equipment Noise Test 5/6/2021 Approved ROBERT CHAVEZ
Final 10/20/2021 Corrections Issued BRENDAN LOONEY
Final 11/5/2021 Not Ready for Inspection BRENDAN LOONEY
Final 11/10/2021 Corrections Issued BRENDAN LOONEY
Final 11/22/2021 Corrections Issued BRENDAN LOONEY
Final 12/8/2021 Corrections Issued BRENDAN LOONEY
Final 3/2/2022 Corrections Issued BRENDAN LOONEY
Final 4/25/2022 OK to Issue CofO DANIEL ORRANTE