10469 W LINDBROOK DR 90024

Certificate Information: 10469 W LINDBROOK DR 90024

Application / Permit
20047-20000-01322
Plan Check / Job No.
B20VN10821
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 32'-0" X 16'-0" SWIMMING POOL AND 8'-0" X 8'-0" SPA WITHIN PER STD. PLAN 268 AND ENGINEER DETAIL.
Permit Issued
Issued on 8/28/2020
Issuing Office
Current Status
CofO Issued on 2/10/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/20/2020 APPLICANT
Assigned to Plan Check Engineer 8/26/2020 GURUNATH NESARAJAH
Plan Check Approved 8/27/2020 JEROME MAGAT PALMA
Issued 8/28/2020 APPLICANT
CofO in Progress 2/8/2021 GERMAN RODRIGUEZ MENDOZA
CofO Issued 2/10/2021 VINCENT COTTON
Permit Finaled 2/10/2021 VINCENT COTTON

Permit Application Clearance Information

Grading Pre-Inspection Cleared 8/27/2020 JEROME MAGAT PALMA

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-C53 15021 VENTURA BLVD STE 520      SHERMAN OAKS, CA 91403
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Gas Piping or Gas Test 10/16/2020 Approved GERMAN RODRIGUEZ MENDOZA
Pool Piping 10/16/2020 Approved GERMAN RODRIGUEZ MENDOZA
Pre-Gunite 10/16/2020 Approved GERMAN RODRIGUEZ MENDOZA
Rough-Electrical 10/16/2020 Approved GERMAN RODRIGUEZ MENDOZA
Deputy Shotcrete 10/21/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Enclosure/Fence 11/30/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Grounding or Bonding 11/30/2020 Approved GERMAN RODRIGUEZ MENDOZA
Enclosure/Fence 12/4/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Pool Equipment Noise Test 12/14/2020 Approved ROBERT CHAVEZ
Excavation/Setback/Form/Re-Bar 12/17/2020 Approved GERMAN RODRIGUEZ MENDOZA
Final 12/17/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 12/17/2020 SGSOV Not Ready GERMAN RODRIGUEZ MENDOZA
Final 1/11/2021 Corrections Issued CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 1/11/2021 SGSOV Not Ready CARLOS MATAMOROS
Final 1/15/2021 Partial Approval ANTHONY MCDOWALL
SGSOV-Seismic Gas S/O Valve 1/15/2021 SGSOV Approved ANTHONY MCDOWALL
Final 1/27/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Final 1/29/2021 Conditional Approval GERMAN RODRIGUEZ MENDOZA