3219 N ETTRICK ST 90027

Certificate Information: 3219 N ETTRICK ST 90027

Application / Permit
20047-20000-01309
Plan Check / Job No.
B20VN10736
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 14'-6" X 32'-5" POOL WITH 8'-6" X 8'-10" SPA PER (LA CITY STANDARD PLAN #268 AND ENGINEERED DESIGN DETAIL # 271-60)
Permit Issued
Issued on 6/23/2022
Issuing Office
Current Status
CofO Issued on 5/28/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/18/2020 APPLICANT
Assigned to Plan Check Engineer 8/21/2020 TSE MING HUANG
Corrections Issued 8/25/2020 TSE MING HUANG
Applicant returned to address corrections 2/17/2022 JENNIFER LEE
Plan Check Approved 6/21/2022 ALEC MOUSAKHANIAN
Issued 6/23/2022 APPLICANT
Building Plans Picked Up 6/29/2022 APPLICANT
CofO in Progress 5/24/2023 JOSEPH MCGARRY
Permit Finaled 5/28/2023 DEROLD HAUFF
CofO Issued 5/28/2023 DEROLD HAUFF
Permit Finaled 5/28/2023 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/14/2020 JUAN ASHTON
Roof/Waste drainage to street Cleared 10/14/2020 JUAN ASHTON
Sewer availability Cleared 10/14/2020 JUAN ASHTON
Grading Pre-Inspection Cleared 2/17/2022 TSE MING HUANG
Construction near power lines Cleared 5/10/2022 RIDWAN HARDY

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-C53 15021 VENTURA BLVD STE 520      SHERMAN OAKS, CA 91403
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

ENRIQUE MIRELES, (213) 202-3438 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 10/27/2022 Corrections Issued JULIAN AMAYA
Pre-Gunite 11/16/2022 Not Ready for Inspection JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 11/29/2022 Approved MICHAEL LEWIS
Pool Piping 11/29/2022 Approved MICHAEL LEWIS
Pre-Gunite 11/29/2022 Approved MICHAEL LEWIS
Deputy Other (see comments) 12/2/2022 Partial Approval JOSEPH MCGARRY
Deck 1/3/2023 Approved JOSEPH MCGARRY
Enclosure/Fence 4/11/2023 Conditional Approval JOSEPH MCGARRY
Special/Order Compliance 4/11/2023 Corrections Issued JOSEPH MCGARRY
Equipment Noise Level 4/18/2023 Approved JUAN ESCOTO DELGADO
Final 4/26/2023 Corrections Issued JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 4/26/2023 SGSOV Not Ready JOSEPH MCGARRY
Final 5/4/2023 Corrections Issued JEFFREY MEAD
SGSOV-Seismic Gas S/O Valve 5/4/2023 SGSOV Approved JEFFREY MEAD
Final 5/22/2023 OK to Issue CofO JOSEPH MCGARRY