16613 W OLDHAM PL 91436

Certificate Information: 16613 W OLDHAM PL 91436

Application / Permit
20047-20000-00965
Plan Check / Job No.
B20VN08564
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
REMODEL (E) SWIMMING POOL - NEW ZERO EDGE AND INFINITY EDGE DETAILS AROUND (E) POOL. REMOVE 9' X 8' PORTION OF (E) POOL, RELOCATE POOL EQUIPMENT, AND SPLIT MAIN DRAIN. ALL WORK PER STANDARD PLAN #268 AND ENGINEER DETAILS.
Permit Issued
Issued on 8/14/2020
Issuing Office
Current Status
CofO Issued on 2/9/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/26/2020 APPLICANT
Assigned to Plan Check Engineer 7/5/2020 JENNIFER LEE
Corrections Issued 7/5/2020 JENNIFER LEE
Applicant returned to address corrections 8/7/2020 JEROME MAGAT PALMA
Plan Check Approved 8/14/2020 JEROME MAGAT PALMA
Issued 8/14/2020 APPLICANT
CofO in Progress 2/8/2021 DONALD SUNSERI
Permit Finaled 2/9/2021 MICHAEL SMITH
CofO Issued 2/9/2021 MICHAEL SMITH
Permit Finaled 2/9/2021 MICHAEL SMITH

Permit Application Clearance Information

Grading Pre-Inspection Cleared 7/5/2020 JENNIFER LEE

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-C53 15021 VENTURA BLVD STE 520      SHERMAN OAKS, CA 91403
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 9/2/2020 Approved RONALD COWAN
Rough-Electrical 9/2/2020 Approved RONALD COWAN
Rough-Plumbing 9/2/2020 Approved RONALD COWAN
Deck 9/17/2020 Approved RONALD COWAN
Grounding or Bonding 9/17/2020 Approved RONALD COWAN
Enclosure/Fence 11/20/2020 Approved RONALD COWAN
Equipment Noise Level 12/1/2020 Corrections Issued FELIPE PENICHE
Pool Equipment Noise Test 12/17/2020 Approved FELIPE PENICHE
SGSOV-Seismic Gas S/O Valve 12/21/2020 SGSOV Not Ready BRENDAN LOONEY
Final 12/23/2020 Corrections Issued DAVID SANDOVAL
Final 12/30/2020 Corrections Issued DONALD SUNSERI
SGSOV-Seismic Gas S/O Valve 12/30/2020 SGSOV Approved DONALD SUNSERI
Final 2/8/2021 OK to Issue CofO DONALD SUNSERI