12548 W COLLINS ST 91607

Certificate Information: 12548 W COLLINS ST 91607

Application / Permit
20047-20000-00907
Plan Check / Job No.
B20VN08209
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW IRREGULAR 14' X 31' POOL W/ 8' X 8' SPA PER LA CITY STANDARD PLAN #268
Permit Issued
Issued on 3/23/2021
Issuing Office
Current Status
CofO Issued on 9/16/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/19/2020 APPLICANT
Assigned to Plan Check Engineer 6/24/2020 LUIS RINCON
Corrections Issued 6/24/2020 LUIS RINCON
Applicant returned to address corrections 8/11/2020 JENNIFER LEE
Applicant returned to address corrections 2/5/2021 LUIS RINCON
Plan Check Approved 2/5/2021 LUIS RINCON
Building Plans Picked Up 3/2/2021 APPLICANT
Issued 3/23/2021 APPLICANT
CofO in Progress 9/15/2021 CHRISTOPHE COCHRAN
Permit Finaled 9/16/2021 MICHAEL SMITH
CofO Issued 9/16/2021 MICHAEL SMITH
Permit Finaled 9/16/2021 MICHAEL SMITH

Permit Application Clearance Information

Construction near power lines Cleared 12/12/2020 RIDWAN HARDY
Construction within easement Cleared 12/12/2020 RIDWAN HARDY

Contact Information

Contractor Babylon Pools; Lic. No.: 855670-C53 556 RIVERDALE DRIVE      GLENDALE, CA 91204
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pool Piping 4/14/2021 Not Ready for Inspection RICHARD DOCKUS
Pre-Gunite 4/14/2021 Corrections Issued RICHARD DOCKUS
Excavation/Setback/Form/Re-Bar 4/21/2021 Approved DAVID MATSON
Gas Piping or Gas Test 4/21/2021 Approved DAVID MATSON
Pool Piping 4/21/2021 Approved DAVID MATSON
Pre-Gunite 4/21/2021 Approved DAVID MATSON
Rough-Electrical 5/6/2021 Approved RICHARD DOCKUS
Deck 5/10/2021 Approved ARAM AVEDISIAN
Enclosure/Fence 6/30/2021 Corrections Issued CHARLES POWELL
Final 9/3/2021 Corrections Issued CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 9/3/2021 SGSOV Approved CHRISTOPHE COCHRAN
Final 9/15/2021 OK to Issue CofO CHRISTOPHE COCHRAN