3311 S CABRILLO BLVD 90066

Certificate Information: 3311 S CABRILLO BLVD 90066

Application / Permit
20047-20000-00854
Plan Check / Job No.
B20VN07892
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 8'-6" X 28'-0" SWIMMING POOL WITH 8'-6" X 7'-0" SPA PER L.A. STANDARD PLAN #270 AND ENGINEER DETAILS INCL 3'6" HIGH CONCR WALL ABOVE BOND BEAM. SEE COMMENTS.
Permit Issued
Issued on 8/11/2020
Issuing Office
Valley
Current Status
CofO Issued on 12/11/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/11/2020 APPLICANT
Assigned to Plan Check Engineer 6/17/2020 ROSENDO MEDINA
Corrections Issued 6/18/2020 ROSENDO MEDINA
Applicant returned to address corrections 6/25/2020 HAYATO TSUCHIYA
Plan Check Approved 7/27/2020 HAYATO TSUCHIYA
Issued 8/11/2020 APPLICANT
CofO in Progress 10/26/2020 ENRIQUE MIRELES
CofO Issued 12/11/2020 VINCENT COTTON
Permit Finaled 12/11/2020 VINCENT COTTON

Permit Application Clearance Information

Grading Pre-Inspection Cleared 6/18/2020 ROSENDO MEDINA

Contact Information

Contractor Mod Luxe Inc; Lic. No.: 1059519-B 11855 LAURELWOOD DR #1      STUDIO CITY, CA 91604
Engineer Cristescu,, Barbu D; Lic. No.: C72038 14401 SYLVAN STREET 209      VAN NUYS, CA 91401

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 8/31/2020 Approved GERMAN RODRIGUEZ MENDOZA
Grounding or Bonding 9/10/2020 Approved JOHNNY MIRANDA
ELECTRICAL-Final 10/14/2020 Not Ready for Inspection ENRIQUE MIRELES
Enclosure/Fence 10/14/2020 Corrections Issued ENRIQUE MIRELES
ELECTRICAL-Final 10/19/2020 Approved ENRIQUE MIRELES
Enclosure/Fence 10/19/2020 Approved ENRIQUE MIRELES
PLUMBING-Final 10/19/2020 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 10/19/2020 SGSOV Approved ENRIQUE MIRELES
Pool Equipment Noise Test 10/21/2020 Approved STEVEN BELTRAN
Excavation/Setback/Form/Re-Bar 10/22/2020 Approved ENRIQUE MIRELES
Final 10/22/2020 Corrections Issued ENRIQUE MIRELES
Pool/Spa Cover 10/22/2020 Approved ENRIQUE MIRELES
Final 10/26/2020 OK to Issue CofO ENRIQUE MIRELES