11771 W LAURELWOOD DR 91604

Certificate Information: 11771 W LAURELWOOD DR 91604

Application / Permit
20047-20000-00782
Plan Check / Job No.
B20VN07547
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
ADD 6' CIRCULAR SPA TO (E) POOL PER STANDARD PLAN #265 AND ENGINEER DETAILS
Permit Issued
Issued on 7/17/2020
Issuing Office
Current Status
CofO Issued on 5/8/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/3/2020 APPLICANT
Assigned to Plan Check Engineer 6/5/2020 JEROME MAGAT PALMA
Corrections Issued 6/8/2020 JEROME MAGAT PALMA
Applicant returned to address corrections 6/25/2020 HAYATO TSUCHIYA
Plan Check Approved 7/17/2020 ROSENDO MEDINA
Issued 7/17/2020 APPLICANT
CofO in Progress 2/10/2021 ARAM AVEDISIAN
CofO Issued 5/8/2021 MICHAEL SMITH
Permit Finaled 5/8/2021 MICHAEL SMITH

Permit Application Clearance Information

Miscellaneous Cleared 6/17/2020 STEVEN WECHSLER
ZA Case Cleared 6/17/2020 STEVEN WECHSLER
ZA Case Cleared 6/17/2020 STEVEN WECHSLER
ZA Case Cleared 6/17/2020 STEVEN WECHSLER
ZA Case Cleared 6/17/2020 STEVEN WECHSLER
ZA Case Cleared 6/17/2020 STEVEN WECHSLER
Grading Pre-Inspection Cleared 6/26/2020 HAYATO TSUCHIYA

Contact Information

Contractor G W P Services; Lic. No.: 974163-C53 5632 VAN NUYS BLVD #427      VAN NUYS, CA 91401
Engineer Zhang,, Yao; Lic. No.: C74572 538 ROCCO CIRCLE      CORONA, CA 92882

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/18/2020 Corrections Issued DANIEL ORRANTE
Pool Piping 8/18/2020 Approved DANIEL ORRANTE
Excavation/Setback/Form/Re-Bar 8/21/2020 Approved ARAM AVEDISIAN
Grounding or Bonding 8/21/2020 Approved ARAM AVEDISIAN
Pre-Gunite 8/21/2020 Approved ARAM AVEDISIAN
Enclosure/Fence 11/5/2020 Corrections Issued ARAM AVEDISIAN
Enclosure/Fence 11/5/2020 No Access for Inspection ARAM AVEDISIAN
Enclosure/Fence 11/6/2020 Not Ready for Inspection ARAM AVEDISIAN
Enclosure/Fence 11/9/2020 Not Ready for Inspection ARAM AVEDISIAN
Enclosure/Fence 11/12/2020 Approved ARAM AVEDISIAN
Equipment Noise Level 12/10/2020 Approved FELIPE PENICHE
Final 12/16/2020 No Access for Inspection ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 12/16/2020 SGSOV Not Ready ARAM AVEDISIAN
Final 1/11/2021 Corrections Issued ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 1/11/2021 SGSOV Not Ready ARAM AVEDISIAN
Final 2/10/2021 OK to Issue CofO ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 2/10/2021 SGSOV Approved ARAM AVEDISIAN