13470 W WEDDINGTON ST 91401

Certificate Information: 13470 W WEDDINGTON ST 91401

Application / Permit
20047-20000-00332
Plan Check / Job No.
B20VN03903
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 36'-0" X 12'-0" SWIMMING POOL AND ATTACHED 9'-0" X 9'-0" SPA PER STANDARD PLAN #268
Permit Issued
Issued on 5/26/2020
Issuing Office
Metro
Current Status
CofO Issued on 3/27/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/4/2020 APPLICANT
Assigned to Plan Check Engineer 3/4/2020 JEROME MAGAT PALMA
Corrections Issued 3/4/2020 JEROME MAGAT PALMA
Plan Check Approved 5/12/2020 ROSENDO MEDINA
Issued 5/26/2020 LADBS
CofO in Progress 9/23/2020 DANIEL ORRANTE
Permit Finaled 3/27/2021 MICHAEL SMITH
CofO Issued 3/27/2021 MICHAEL SMITH
Permit Finaled 3/27/2021 MICHAEL SMITH

Permit Application Clearance Information

Construction near power lines Cleared 4/24/2020 RIDWAN HARDY
Construction within easement Cleared 4/24/2020 RIDWAN HARDY

Contact Information

Contractor Pacific Outdoor Living; Lic. No.: 715731-B 8309 TUJUNGA AVE SUITE 201      SUN VALLEY, CA 91352
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

MISAEL ESPARZA, (818) 374-1169 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deck 6/11/2020 Not Ready for Inspection ARAM AVEDISIAN
Excavation/Setback/Form/Re-Bar 6/11/2020 Approved ARAM AVEDISIAN
Gas Piping or Gas Test 6/11/2020 Approved ARAM AVEDISIAN
Grounding or Bonding 6/11/2020 Partial Approval ARAM AVEDISIAN
Pool Piping 6/11/2020 Approved ARAM AVEDISIAN
Pre-Gunite 6/11/2020 Approved ARAM AVEDISIAN
Rough-Electrical 6/11/2020 Not Ready for Inspection ARAM AVEDISIAN
Deck 6/16/2020 Approved CHARLES POWELL
Rough-Electrical 6/16/2020 Approved CHARLES POWELL
Enclosure/Fence 8/27/2020 Approved BRENDAN LOONEY
Equipment Noise Level 9/4/2020 Approved FELIPE PENICHE
Final 9/9/2020 Corrections Issued THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 9/9/2020 SGSOV Approved THOMAS FINNILA
Final 9/22/2020 OK to Issue CofO DANIEL ORRANTE