10508 W WYTON DR 90024

Certificate Information: 10508 W WYTON DR 90024

Application / Permit
20047-20000-00104
Plan Check / Job No.
B20VN01142
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
REMODEL (E) POOL - REMOVE PORTION OF (E) POOL AND REVISE POOL DIMENSIONS TO (N) 24'-5" X 25'-0" W/ BAJA ENTRY. ALL WORK PER LA CITY STANDARD PLAN #268 AND DETAIL #: 551 AND 640.
Permit Issued
Issued on 2/12/2020
Issuing Office
Valley
Current Status
CofO Issued on 7/13/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/23/2020 APPLICANT
Assigned to Plan Check Engineer 1/23/2020 JENNIFER LEE
Corrections Issued 1/23/2020 JENNIFER LEE
Plan Check Approved 2/12/2020 HAYATO TSUCHIYA
Issued 2/12/2020 LADBS
CofO in Progress 7/1/2020 GERMAN RODRIGUEZ MENDOZA
Permit Finaled 7/13/2020 VINCENT COTTON
CofO Issued 7/13/2020 VINCENT COTTON
Permit Finaled 7/13/2020 VINCENT COTTON

Permit Application Clearance Information

Grading Pre-Inspection Cleared 2/12/2020 HAYATO TSUCHIYA

Contact Information

Contractor Novales Pool & Spa Inc; Lic. No.: 945233-C53 12500 VALLEY VISTA WAY      SYLMAR, CA 91342
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grounding or Bonding 3/6/2020 Partial Approval ANTHONY MCDOWALL
Pool Piping 3/6/2020 Approved ANTHONY MCDOWALL
Pre-Gunite 3/6/2020 Approved ANTHONY MCDOWALL
Deputy Shotcrete 3/12/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Deck 4/13/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
Enclosure/Fence 4/22/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Enclosure/Fence 4/27/2020 Approved KEVIN SARGSYAN
Equipment Noise Level 5/12/2020 Corrections Issued BRYAN EPSTEIN
Pool Equipment Noise Test 5/18/2020 Approved BRYAN EPSTEIN
Final 5/21/2020 Not Ready for Inspection KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/21/2020 SGSOV Not Ready KEVIN SARGSYAN
Final 5/27/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 5/27/2020 SGSOV Not Ready GERMAN RODRIGUEZ MENDOZA
Final 6/15/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 6/15/2020 SGSOV Not Ready GERMAN RODRIGUEZ MENDOZA
Final 6/23/2020 Corrections Issued ANTHONY MCDOWALL
SGSOV-Seismic Gas S/O Valve 6/23/2020 SGSOV Approved ANTHONY MCDOWALL
Final 6/26/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA