3001 S CAVENDISH DR 90064

Certificate Information: 3001 S CAVENDISH DR 90064

Application / Permit
20047-20000-00010
Plan Check / Job No.
B20VN00100
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 15' X 32' POOL AND 6'X 6' SPA PER STD PLAN # 268 AND DETAIL # 400 - 60.
Permit Issued
Issued on 1/8/2020
Issuing Office
Valley
Current Status
CofO Issued on 5/4/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/3/2020 APPLICANT
Assigned to Plan Check Engineer 1/3/2020 PINANK PATEL
Corrections Issued 1/3/2020 PINANK PATEL
Plan Check Approved 1/8/2020 YAQUB MIRZA
Issued 1/8/2020 LADBS
CofO in Progress 4/21/2021 KEVIN SARGSYAN
Permit Finaled 5/4/2021 KENNETH NAGLE
CofO Issued 5/4/2021 KENNETH NAGLE
Permit Finaled 5/4/2021 KENNETH NAGLE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 1/3/2020 PINANK PATEL
Construction near power lines Cleared 1/6/2020 WALTER RAMIREZ

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-C53 14930 VENTURA BLVD STE 310      SHERMAN OAKS, CA 91403
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 2/24/2020 Approved RONALD WEBER
Deputy Shotcrete 3/9/2020 Conditional Approval RONALD WEBER
Deck 4/22/2020 Approved OGANES TARAKHCHYAN
Grounding or Bonding 4/22/2020 Approved OGANES TARAKHCHYAN
Enclosure/Fence 5/8/2020 Corrections Issued EVAN COOPER
Enclosure/Fence 5/12/2020 Approved GERMAN RODRIGUEZ MENDOZA
Grounding or Bonding 5/12/2020 Partial Inspection GERMAN RODRIGUEZ MENDOZA
Equipment Noise Level 5/19/2020 Approved ROBERT CHAVEZ
Excavation/Setback/Form/Re-Bar 5/26/2020 Approved KEVIN SARGSYAN
Final 5/26/2020 Conditional Approval KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/26/2020 SGSOV Approved KEVIN SARGSYAN
ELECTRICAL-Final 4/20/2021 Approved KEVIN SARGSYAN
Final 4/20/2021 Conditional Approval KEVIN SARGSYAN