4343 N BELLAIRE AVE 91604

Certificate Information: 4343 N BELLAIRE AVE 91604

Application / Permit
20047-10000-01132
Plan Check / Job No.
B20LA13069
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
REMODEL EXISTING SWIMMING POOL, ADD A NEW SPA WITHIN THE EXISTING POOL FOOTPRINT, ADD A NEW AUTOMATED POOL COVER. PER STANDARD PLAN #268
Permit Issued
Issued on 9/17/2020
Issuing Office
Current Status
Issued on 9/17/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/28/2020 APPLICANT
Assigned to Plan Check Engineer 7/29/2020 FERNANDO FLORES
Corrections Issued 7/29/2020 FERNANDO FLORES
Plan Check Approved 9/3/2020 AMIR DANAI
Building Plans Picked Up 9/4/2020 APPLICANT
Issued 9/17/2020 APPLICANT

Permit Application Clearance Information

ZA Case Cleared 8/20/2020 JOE LUCKEY

Contact Information

Contractor Huntington Pools Inc; Lic. No.: 985267-C53 300 SO WALNUT AVE #401      SAN DIMAS, CA 91773
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Gas Piping or Gas Test 9/24/2020 Approved ARAM AVEDISIAN
Pre-Inspection 9/28/2020 Approved ARAM AVEDISIAN
Excavation/Setback/Form/Re-Bar 10/21/2020 Approved ARAM AVEDISIAN
Grounding or Bonding 10/21/2020 Partial Approval ARAM AVEDISIAN
Pool Piping 10/21/2020 Approved ARAM AVEDISIAN
Pre-Gunite 10/21/2020 Approved ARAM AVEDISIAN
Enclosure/Fence 2/1/2021 Corrections Issued MATTHEW NELSON
Pre-Gunite 2/1/2021 Not Ready for Inspection MATTHEW NELSON
Special/Order Compliance 2/1/2021 Approved DAVID MATSON
Enclosure/Fence 2/5/2021 No Access for Inspection THOMAS FINNILA
Pre-Gunite 2/5/2021 Not Ready for Inspection THOMAS FINNILA
Final 2/26/2021 Corrections Issued ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 2/26/2021 SGSOV Not Ready ARAM AVEDISIAN
Equipment Noise Level 3/5/2021 Approved FELIPE PENICHE
Final 3/5/2021 Not Ready for Inspection ARAM AVEDISIAN
Pool Equipment Noise Test 3/5/2021 Approved FELIPE PENICHE
SGSOV-Seismic Gas S/O Valve 3/5/2021 SGSOV Not Ready ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 3/31/2021 SGSOV Not Ready ARAM AVEDISIAN
Final 4/20/2021 Not Ready for Inspection ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 4/20/2021 SGSOV Not Ready ARAM AVEDISIAN