4541 N POE AVE 91364

Certificate Information: 4541 N POE AVE 91364

Application / Permit
20020-20000-02423
Plan Check / Job No.
B20VN14895
Group
Building
Type
Nonbldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Retaining Wall
Work Description
NEW 6'6"FT HIGH (6 FT RETAINING MAX) X 127 LF LONG RETAINING WALL ( 6 FT HIGH ABOVE NATURAL GRADE IN THE REQUIRED SIDE YARD AND 3 FT MAX ABOVE NATURAL GRADE IN THE REQUIRED FRONT YARD ) AND NEW 3' FT HIGH X 66.5 LF LONG , ALL WORK PER ENGINEERING
Permit Issued
Issued on 6/14/2022
Issuing Office
Current Status
Permit Finaled on 12/5/2023

Permit Application Status History

Submitted 11/16/2020 APPLICANT
Assigned to Plan Check Engineer 11/24/2020 RARES BODEA
Corrections Issued 11/26/2020 RARES BODEA
Building Plans Picked Up 12/1/2020 APPLICANT
Applicant returned to address corrections 12/13/2021 RARES BODEA
Applicant returned to address corrections 5/16/2022 RARES BODEA
Plan Check Approved 6/14/2022 RARES BODEA
Issued 6/14/2022 APPLICANT
Permit Finaled 12/5/2023 ROBERT PINA

Permit Application Clearance Information

Construction within easement Cleared 8/3/2021 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 8/9/2021 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 8/9/2021 GABRIEL ROBLES
Work Adjacent to Public Way Cleared 8/9/2021 GABRIEL ROBLES
Grading Pre-Inspection Cleared 5/17/2022 RARES BODEA

Contact Information

Architect Woodcraft,, Lawrence Albert; Lic. No.: C23651 20812 VENTURA BLVD, STE 205      WOODLAND HILLS, CA 91364
Contractor Owner-Builder       ,

Inspector Information

MANUEL TEJADA, (818) 374-4339 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/17/2023 Corrections Issued BRIAN MILLER
Excavation/Setback/Form/Re-Bar 4/21/2023 Partial Approval BRIAN MILLER
Excavation/Setback/Form/Re-Bar 4/28/2023 Approved ROBERT PINA
Excavation/Setback/Form/Re-Bar 5/10/2023 Partial Approval ROBERT PINA
Reinforced Concrete Frame 5/10/2023 Partial Approval ROBERT PINA
Reinforced Masonry Frame 5/10/2023 Partial Approval ROBERT PINA
Reinforced Concrete Frame 5/15/2023 Partial Inspection MANUEL TEJADA
Reinforced Masonry Frame 5/15/2023 Partial Inspection MANUEL TEJADA
Footing/Foundation/Slab 6/8/2023 Partial Approval ROBERT PINA
Special/Order Compliance 10/31/2023 Not Ready for Inspection ROBERT PINA
Final 11/9/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Special/Order Compliance 11/9/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 11/16/2023 Corrections Issued JOHNNY MIRANDA
Final 12/5/2023 Permit Finaled ROBERT PINA