5020 S 3RD AVE 90043
Certificate Information: 5020 S 3RD AVE 90043
- Application / Permit
- 20016-90000-31739
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Replace 10 window(s). Same size, location, number, type. Replace 4 door(s). Same size, location, number, type. Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings).
- Permit Issued
- Issued on 12/8/2020
- Issuing Office
- Current Status
- Permit Finaled on 5/6/2021
Permit Application Status History
| Issued | 12/8/2020 | INTERNET PERMIT |
| Permit Finaled | 5/6/2021 | CHRISTOPHER DELLEFIELD |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | L J Enterprise Investments; Lic. No.: 903105-B | 5701 LONG BEACH AVE STE 203 LOS ANGELES, CA 90058 |
Inspector Information
| LUIS CASTRO, (213) 202-3436 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| ELECTRICAL-Rough | 1/21/2021 | Corrections Issued | FREDDIE RIVERA |
| HVAC-Rough | 1/21/2021 | No Access for Inspection | FREDDIE RIVERA |
| PLUMBING-Rough | 1/21/2021 | No Access for Inspection | FREDDIE RIVERA |
| ELECTRICAL-Rough | 1/23/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| Gas Test | 1/23/2021 | Corrections Issued | FREDDIE RIVERA |
| HVAC-Rough | 1/23/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| PLUMBING-Rough | 1/23/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| ELECTRICAL-Rough | 1/28/2021 | Approved | ROBERT MCDOWELL |
| HVAC-Rough | 1/28/2021 | Approved | ROBERT MCDOWELL |
| PLUMBING-Rough | 1/28/2021 | Approved | ROBERT MCDOWELL |
| Drywall Nailing | 2/8/2021 | Approved | SABAS ALONSO |
| Interior/Exterior Lathing | 2/8/2021 | Partial Approval | SABAS ALONSO |
| Shower Pan | 2/12/2021 | Not Ready for Inspection | DAVID FEILER |
| Final | 4/15/2021 | Corrections Issued | DAVID FEILER |
| PLUMBING-Final | 4/15/2021 | Not Ready for Inspection | DAVID FEILER |
| SGSOV-Seismic Gas S/O Valve | 4/15/2021 | SGSOV Approved | DAVID FEILER |
| Smoke Detectors | 4/15/2021 | Approved | DAVID FEILER |
| ELECTRICAL-Final | 4/24/2021 | Approved | GERMAN RODRIGUEZ MENDOZA |
| Final | 4/24/2021 | Not Ready for Inspection | GERMAN RODRIGUEZ MENDOZA |
| HVAC-Final | 4/24/2021 | Not Ready for Inspection | GERMAN RODRIGUEZ MENDOZA |
| PLUMBING-Final | 4/24/2021 | Approved | GERMAN RODRIGUEZ MENDOZA |
| Final | 5/6/2021 | Permit Finaled | CHRISTOPHER DELLEFIELD |