5020 S 3RD AVE 90043

Certificate Information: 5020 S 3RD AVE 90043

Application / Permit
20016-90000-31739
Plan Check / Job No.
--
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Replace 10 window(s). Same size, location, number, type. Replace 4 door(s). Same size, location, number, type. Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings).
Permit Issued
Issued on 12/8/2020
Issuing Office
Current Status
Permit Finaled on 5/6/2021

Permit Application Status History

Issued 12/8/2020 INTERNET PERMIT
Permit Finaled 5/6/2021 CHRISTOPHER DELLEFIELD

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor L J Enterprise Investments; Lic. No.: 903105-B 5701 LONG BEACH AVE STE 203      LOS ANGELES, CA 90058

Inspector Information

LUIS CASTRO, (213) 202-3436 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 1/21/2021 Corrections Issued FREDDIE RIVERA
HVAC-Rough 1/21/2021 No Access for Inspection FREDDIE RIVERA
PLUMBING-Rough 1/21/2021 No Access for Inspection FREDDIE RIVERA
ELECTRICAL-Rough 1/23/2021 Not Ready for Inspection FREDDIE RIVERA
Gas Test 1/23/2021 Corrections Issued FREDDIE RIVERA
HVAC-Rough 1/23/2021 Not Ready for Inspection FREDDIE RIVERA
PLUMBING-Rough 1/23/2021 Not Ready for Inspection FREDDIE RIVERA
ELECTRICAL-Rough 1/28/2021 Approved ROBERT MCDOWELL
HVAC-Rough 1/28/2021 Approved ROBERT MCDOWELL
PLUMBING-Rough 1/28/2021 Approved ROBERT MCDOWELL
Drywall Nailing 2/8/2021 Approved SABAS ALONSO
Interior/Exterior Lathing 2/8/2021 Partial Approval SABAS ALONSO
Shower Pan 2/12/2021 Not Ready for Inspection DAVID FEILER
Final 4/15/2021 Corrections Issued DAVID FEILER
PLUMBING-Final 4/15/2021 Not Ready for Inspection DAVID FEILER
SGSOV-Seismic Gas S/O Valve 4/15/2021 SGSOV Approved DAVID FEILER
Smoke Detectors 4/15/2021 Approved DAVID FEILER
ELECTRICAL-Final 4/24/2021 Approved GERMAN RODRIGUEZ MENDOZA
Final 4/24/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
HVAC-Final 4/24/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
PLUMBING-Final 4/24/2021 Approved GERMAN RODRIGUEZ MENDOZA
Final 5/6/2021 Permit Finaled CHRISTOPHER DELLEFIELD