11416 W MCCUNE AVE 90066

Certificate Information: 11416 W MCCUNE AVE 90066

Application / Permit
20016-90000-27199
Plan Check / Job No.
--
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Reroof with 24 sqrs COMP SHINGLE roofing. Existing solid sheathing. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings).
Permit Issued
Issued on 10/22/2020
Issuing Office
Current Status
Permit Finaled on 5/28/2021

Permit Application Status History

Issued 10/22/2020 INTERNET PERMIT
Permit Finaled 5/27/2021 OGANES TARAKHCHYAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Guideline Builders Inc; Lic. No.: 1021305-B 18590 VENTURA BLVD UNIT 205      TARZANA, CA 91356

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 11/20/2020 Approved RICHARD ROBLES
PLUMBING-Rough 11/20/2020 Partial Approval RICHARD ROBLES
ELECTRICAL-Rough 11/30/2020 Partial Approval OGANES TARAKHCHYAN
Insulation 11/30/2020 Partial Approval OGANES TARAKHCHYAN
Interior/Exterior Lathing 11/30/2020 Partial Approval OGANES TARAKHCHYAN
Drywall Nailing 12/21/2020 Not Ready for Inspection RICHARD ROBLES
ELECTRICAL-Rough 12/21/2020 Corrections Issued RICHARD ROBLES
Insulation 12/21/2020 Not Ready for Inspection RICHARD ROBLES
PLUMBING-Rough 12/21/2020 Approved RICHARD ROBLES
PLUMBING-Rough 12/28/2020 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Rough 12/30/2020 Not Ready for Inspection EVAN COOPER
Gas Test 12/30/2020 Not Ready for Inspection EVAN COOPER
PLUMBING-Rough 12/30/2020 Not Ready for Inspection EVAN COOPER
Drywall Nailing 1/5/2021 Partial Approval OGANES TARAKHCHYAN
Gas Test 1/5/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Insulation 1/5/2021 Partial Approval OGANES TARAKHCHYAN
PLUMBING-Rough 1/5/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Final 5/27/2021 Permit Finaled OGANES TARAKHCHYAN