11811 S BELHAVEN ST 90059
Certificate Information: 11811 S BELHAVEN ST 90059
- Application / Permit
- 20016-70000-00662
- Plan Check / Job No.
- X20SL00086
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Kitchen/bathroom remodel for residential buildings (no structural changes). **Related Electrical, Heating, and Plumbing required**. Re-roof (House and detached garage) with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) of Title 24.
- Permit Issued
- Issued on 1/9/2020
- Issuing Office
- South Los Angeles
- Current Status
- Issued on 1/9/2020
Permit Application Status History
| Issued | 1/9/2020 | LADBS |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Zetino And Son'S Construction; Lic. No.: 817787-B | 841 S CALIFORNIA AVE WEST COVINA, CA 91790 |
Inspector Information
| JOHN KLARIN, (310) 732-4558 | Office Hours: 7:00-8:00 AM MON-FRI |
| ARTHUR NEGRETE, (310) 732-4558 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 1/15/2020 | Not Ready for Inspection | WILLIAM ROSE |
| Floor/Roof Diaphrgm/Shear Wall | 1/17/2020 | Partial Approval | WILLIAM ROSE |
| ELECTRICAL-Rough | 2/25/2020 | Approved | WILLIAM ROSE |
| Drywall Nailing | 2/28/2020 | Approved | WILLIAM ROSE |
| Insulation | 2/28/2020 | Approved | WILLIAM ROSE |
| BUILDING-Rough-Frame | 4/14/2020 | Corrections Issued | EUGENE CASSIDY |
| ELECTRICAL-Final | 4/14/2020 | Not Ready for Inspection | EUGENE CASSIDY |
| Final | 4/14/2020 | Not Ready for Inspection | EUGENE CASSIDY |
| HVAC-Final | 4/14/2020 | Approved | EUGENE CASSIDY |
| MERV13>=Final | 4/14/2020 | Approved | EUGENE CASSIDY |
| MERV13>=Rough | 4/14/2020 | Approved | EUGENE CASSIDY |
| PLUMBING-Final | 4/14/2020 | Not Ready for Inspection | EUGENE CASSIDY |
| SGSOV-Seismic Gas S/O Valve | 4/14/2020 | SGSOV Approved | EUGENE CASSIDY |
| Smoke Detectors | 4/14/2020 | Approved | EUGENE CASSIDY |
| ELECTRICAL-Final | 4/17/2020 | Approved | EUGENE CASSIDY |
| PLUMBING-Final | 4/17/2020 | Approved | EUGENE CASSIDY |
| Service/Power Release | 4/17/2020 | Approved | EUGENE CASSIDY |