11811 S BELHAVEN ST 90059

Certificate Information: 11811 S BELHAVEN ST 90059

Application / Permit
20016-70000-00662
Plan Check / Job No.
X20SL00086
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Kitchen/bathroom remodel for residential buildings (no structural changes). **Related Electrical, Heating, and Plumbing required**. Re-roof (House and detached garage) with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) of Title 24.
Permit Issued
Issued on 1/9/2020
Issuing Office
South Los Angeles
Current Status
Issued on 1/9/2020

Permit Application Status History

Issued 1/9/2020 LADBS

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Zetino And Son'S Construction; Lic. No.: 817787-B 841 S CALIFORNIA AVE      WEST COVINA, CA 91790

Inspector Information

JOHN KLARIN, (310) 732-4558 Office Hours: 7:00-8:00 AM MON-FRI
ARTHUR NEGRETE, (310) 732-4558 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 1/15/2020 Not Ready for Inspection WILLIAM ROSE
Floor/Roof Diaphrgm/Shear Wall 1/17/2020 Partial Approval WILLIAM ROSE
ELECTRICAL-Rough 2/25/2020 Approved WILLIAM ROSE
Drywall Nailing 2/28/2020 Approved WILLIAM ROSE
Insulation 2/28/2020 Approved WILLIAM ROSE
BUILDING-Rough-Frame 4/14/2020 Corrections Issued EUGENE CASSIDY
ELECTRICAL-Final 4/14/2020 Not Ready for Inspection EUGENE CASSIDY
Final 4/14/2020 Not Ready for Inspection EUGENE CASSIDY
HVAC-Final 4/14/2020 Approved EUGENE CASSIDY
MERV13>=Final 4/14/2020 Approved EUGENE CASSIDY
MERV13>=Rough 4/14/2020 Approved EUGENE CASSIDY
PLUMBING-Final 4/14/2020 Not Ready for Inspection EUGENE CASSIDY
SGSOV-Seismic Gas S/O Valve 4/14/2020 SGSOV Approved EUGENE CASSIDY
Smoke Detectors 4/14/2020 Approved EUGENE CASSIDY
ELECTRICAL-Final 4/17/2020 Approved EUGENE CASSIDY
PLUMBING-Final 4/17/2020 Approved EUGENE CASSIDY
Service/Power Release 4/17/2020 Approved EUGENE CASSIDY