6003 S 5TH AVE 90043
Certificate Information: 6003 S 5TH AVE 90043
- Application / Permit
- 20016-30000-33042
- Plan Check / Job No.
- X20WL07962
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- "COMPLY WITH DEPARTMENT ORDER effective date 04/07/2008. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE. All permits shall be for the same time period limitation. If additional assistance is needed, please call Inspector MICHAEL TUCK at (213)252-3936. CEIS Case Number is 223710. (22) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. (3) Bathroom remodel for residential buildings (no structural changes).
- Permit Issued
- Issued on 12/22/2020
- Issuing Office
- Current Status
- Permit Finaled on 1/6/2022
Permit Application Status History
| Issued | 12/22/2020 | APPLICANT |
| Permit Finaled | 1/5/2022 | FREDDIE RIVERA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| No Data Available. |
Inspector Information
| SALVADOR MARTINEZ, (213) 202-3479 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 3/16/2021 | Corrections Issued | FREDDIE RIVERA |
| Interior/Exterior Lathing | 4/10/2021 | Corrections Issued | JUAN VALENZUELA |
| Interior/Exterior Lathing | 5/10/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| Wood Frame | 5/27/2021 | Approved | FREDDIE RIVERA |
| Insulation | 6/5/2021 | No Access for Inspection | DANIEL GONZALEZ |
| Insulation | 6/14/2021 | Corrections Issued | JESUS PINEDA |
| Insulation | 6/21/2021 | Approved | FREDDIE RIVERA |
| Interior/Exterior Lathing | 6/21/2021 | Approved | FREDDIE RIVERA |
| Wood Frame | 6/21/2021 | Approved | FREDDIE RIVERA |
| Drywall Nailing | 7/1/2021 | Approved | CALEB MEISTER |
| Final | 12/22/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| SGSOV-Seismic Gas S/O Valve | 12/22/2021 | SGSOV Not Ready | FREDDIE RIVERA |
| Smoke Detectors | 12/22/2021 | Approved | FREDDIE RIVERA |
| Final | 1/5/2022 | Permit Finaled | FREDDIE RIVERA |
| SGSOV-Seismic Gas S/O Valve | 1/5/2022 | SGSOV Approved | FREDDIE RIVERA |