10425 W SUNSET BLVD POOL-HOUSE 90077

Certificate Information: 10425 W SUNSET BLVD POOL-HOUSE 90077

Application / Permit
20016-30000-20767
Plan Check / Job No.
X20WL04566
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Remodel of POOL HOUSE ( no structural changes) ( 6 ) WINDOW and ( 6 ) DOOR change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 152(b) of Title 24. ( 1 )BATHROOM remodel for residential buildings (combined with elect/plumb/hvac) Re-stucco for single family dwellings and duplexes only. Replace drywall (no new walls added) for single family dwellings and duplexes only. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __13_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings.
Permit Issued
Issued on 8/25/2020
Issuing Office
Current Status
Permit Finaled on 5/9/2025

Permit Application Status History

Issued 8/25/2020 APPLICANT
Permit Finaled 5/8/2025 CHRISTOPHER WILSON

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Builder'S Team Inc; Lic. No.: 636904-B 2259 HONOLULU AVENUE      MONTROSE, CA 91020

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/7/2021 Partial Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 6/7/2022 Approved MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 6/17/2022 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 6/17/2022 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Drilled-In Anchors 9/15/2022 Conditional Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 12/7/2022 Corrections Issued STEPHANIE SWANSON
Interior/Exterior Lathing 12/9/2022 Approved CARLOS MATAMOROS
BUILDING-Rough-Frame 1/19/2023 Not Ready for Inspection CARLOS MATAMOROS
ELECTRICAL-Rough 1/19/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Rough 1/19/2023 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Rough 1/19/2023 Not Ready for Inspection CARLOS MATAMOROS
Rough-Elec/Plmb/HVAC 1/19/2023 Not Ready for Inspection CARLOS MATAMOROS
BUILDING-Rough-Frame 1/23/2023 Approved CARLOS MATAMOROS
ELECTRICAL-Rough 1/23/2023 Approved CARLOS MATAMOROS
Gas Test 1/23/2023 Approved CARLOS MATAMOROS
HVAC-Rough 1/23/2023 Approved CARLOS MATAMOROS
PLUMBING-Rough 1/23/2023 Approved CARLOS MATAMOROS
Final 5/8/2025 Permit Finaled CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 5/8/2025 SGSOV Approved CHRISTOPHER WILSON
Smoke Detectors 5/8/2025 Approved CHRISTOPHER WILSON