1365 S CARMONA AVE 90019

Certificate Information: 1365 S CARMONA AVE 90019

Application / Permit
20016-30000-10611
Plan Check / Job No.
B20WL01922
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT EXISTING DETACHED GARAGE TO ADU PER GCS 65852.2(e)(1)(A)
Permit Issued
Issued on 10/13/2020
Issuing Office
West Los Angeles
Current Status
CofO Issued on 9/25/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/7/2020 APPLICANT
Assigned to Plan Check Engineer 5/14/2020 RICARDO RAMIREZ
Corrections Issued 5/14/2020 RICARDO RAMIREZ
Plan Check Approved 9/29/2020 MARJAN SHENASI
Issued 10/13/2020 APPLICANT
Building Plans Picked Up 10/13/2020 APPLICANT
CofO in Progress 9/17/2021 FREDDIE RIVERA
Permit Finaled 9/25/2021 DEROLD HAUFF
CofO Issued 9/25/2021 DEROLD HAUFF
Permit Finaled 9/25/2021 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/24/2020 HISASHI KOBAYAKAWA
Sewer availability Cleared 7/24/2020 HISASHI KOBAYAKAWA
Eng Process Fee Ord 176,300 Cleared 7/28/2020 HISASHI KOBAYAKAWA
Hydrant and Access approval Cleared 8/12/2020 MATTHEW CRAIG
Construction near power lines Cleared 9/4/2020 RIDWAN HARDY

Contact Information

Contractor Derleth Custom Construction Inc; Lic. No.: 830190-B 578 WASHINGTON BLVD #207      MARINA DEL REY, CA 90292
Engineer Christiansen,, Scott; Lic. No.: C37989 1003 WILSHIRE BLVD 202      SANTA MONICA, CA 90401

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 11/10/2020 Partial Approval STUART CHAPMAN
Interior/Exterior Lathing 11/25/2020 Not Ready for Inspection DAVID CHAN
Wood Frame 11/25/2020 Not Ready for Inspection DAVID CHAN
PLUMBING-Rough 12/3/2020 Approved DAVID CHAN
BUILDING-Rough-Frame 12/30/2020 Approved STUART CHAPMAN
ELECTRICAL-Rough 12/30/2020 Approved STUART CHAPMAN
Green Building Rough 12/30/2020 Approved STUART CHAPMAN
METHANE-Rough 12/30/2020 Approved STUART CHAPMAN
Insulation 1/4/2021 Approved DAVID CHAN
Floor/Roof Diaphrgm/Shear Wall 1/25/2021 Corrections Issued DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 1/25/2021 Not Ready for Inspection RUBEN SALAS
Interior/Exterior Lathing 1/25/2021 Approved DAVID FEILER
Deputy Wood Construction 1/27/2021 No Access for Inspection ELMER BLAND
Floor/Roof Diaphrgm/Shear Wall 1/29/2021 Approved SCOTT FINNILA
BUILDING-Rough-Frame 2/5/2021 Approved SCOTT FINNILA
Drywall Nailing 2/5/2021 Approved SCOTT FINNILA
ELECTRICAL-Final 5/24/2021 Not Ready for Inspection STUART CHAPMAN
Final 5/24/2021 Corrections Issued STUART CHAPMAN
Green Building Final 5/24/2021 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Final 5/24/2021 Not Ready for Inspection STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 5/24/2021 SGSOV Not Ready STUART CHAPMAN
Smoke Detectors 5/24/2021 Approved STUART CHAPMAN
ELECTRICAL-Final 7/21/2021 Approved CHRISTOPHER DELLEFIELD
Final 7/21/2021 Corrections Issued CHRISTOPHER DELLEFIELD
Green Building Final 7/21/2021 Not Ready for Inspection CHRISTOPHER DELLEFIELD
HVAC-Final 7/21/2021 Not Ready for Inspection CHRISTOPHER DELLEFIELD
PLUMBING-Final 7/21/2021 Approved CHRISTOPHER DELLEFIELD
SGSOV-Seismic Gas S/O Valve 7/21/2021 SGSOV Not Ready CHRISTOPHER DELLEFIELD
SGSOV-Seismic Gas S/O Valve 8/10/2021 SGSOV Not Ready KATHRYN BUTTERWORTH
Final 9/8/2021 OK to Issue CofO FREDDIE RIVERA
Green Building Final 9/8/2021 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 9/8/2021 SGSOV Approved FREDDIE RIVERA