7460 W MULHOLLAND DR 90046

Certificate Information: 7460 W MULHOLLAND DR 90046

Application / Permit
20016-30000-10528
Plan Check / Job No.
B20WL01895
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior alteration - Lower floor to remodel master bathroom, remove one bedroom to enlarge another bedroom and add a new bathroom. Upper floor to remodel kitchen, remove load bearing walls between family room, dining room and kitchen.
Permit Issued
Issued on 9/16/2020
Issuing Office
Current Status
Permit Finaled on 3/30/2021

Permit Application Status History

Submitted 6/10/2020 APPLICANT
Assigned to Plan Check Engineer 6/12/2020 RICARDO RAMIREZ
Corrections Issued 6/12/2020 RICARDO RAMIREZ
Applicant returned to address corrections 6/25/2020 JASON JANGADA
Applicant returned to address corrections 7/9/2020 ALFREDO JARA
Plan Check Approved 7/29/2020 JAHANSHAH POURHASSAN
Issued 9/16/2020 APPLICANT
Building Plans Picked Up 9/18/2020 APPLICANT
Permit Finaled 3/30/2021 BRIAN SULLIVAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 7/17/2020 KIRK LINKLATER

Contact Information

Contractor Love Home Renovations; Lic. No.: 1055055-B 8601 LINCOLN BLVD   SUITE # 180-604    LOS ANGELES, CA 90045
Engineer Mayorga,, Jose Aguinaldo; Lic. No.: C50322 20457 OREY PL      WINNETKA, CA 91306

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/2/2020 Corrections Issued BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 12/15/2020 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 12/23/2020 Not Ready for Inspection RAUL BARAJAS
Rough-Elec/Plmb/HVAC 12/23/2020 Partial Approval RAUL BARAJAS
BUILDING-Rough-Frame 12/30/2020 Approved BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 12/30/2020 Approved BRIAN SULLIVAN
Drywall Nailing 1/6/2021 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 1/6/2021 Approved BRIAN SULLIVAN
Shower Pan 1/6/2021 Approved BRIAN SULLIVAN
Final 3/30/2021 Permit Finaled BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 3/30/2021 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 3/30/2021 Approved BRIAN SULLIVAN