127 N CLIFFWOOD AVE 90049
Certificate Information: 127 N CLIFFWOOD AVE 90049
- Application / Permit
- 20016-30000-07157
- Plan Check / Job No.
- X20WL01599
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- KITCHEN REMODEL COMBINED WITH ELECTRICAL, PLUMBING, AND HVAC FOR RESIDENTIAL BUILDINGS (NO STRUCTURAL CHANGES). BATHROOM REMODEL COMBINED WITH ELECTRICAL, PLUMBING, AND HVAC FOR RESIDENTIAL BUILDINGS (NO STRUCTURAL CHANGES). REPLACE DRYWALL (NO NEW WALLS ADDED) FOR SINGLE FAMILY DWELLINGS AND DUPLEX ONLY.
- Permit Issued
- Issued on 3/11/2020
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 2/18/2021
Permit Application Status History
| Issued | 3/11/2020 | LADBS |
| Permit Finaled | 2/17/2021 | JUAN VALENZUELA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Fort Hill Construction; Lic. No.: 414092-B | 12711 VENTURA BLVD STE 390 STUDIO CITY, CA 91604 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| ELECTRICAL-Rough | 3/16/2020 | Approved | TIM CHRISTENSEN |
| PLUMBING-Rough | 3/16/2020 | Corrections Issued | TIM CHRISTENSEN |
| PLUMBING-Rough | 4/14/2020 | Approved | TIM CHRISTENSEN |
| HVAC-Rough | 4/17/2020 | Approved | TIM CHRISTENSEN |
| Wood Frame | 4/24/2020 | Approved | TIM CHRISTENSEN |
| Drywall Nailing | 5/13/2020 | Approved | TIM CHRISTENSEN |
| Final | 1/21/2021 | Not Ready for Inspection | PIERRE VEGA |
| SGSOV-Seismic Gas S/O Valve | 1/21/2021 | SGSOV Not Ready | PIERRE VEGA |
| Smoke Detectors | 1/21/2021 | Not Ready for Inspection | PIERRE VEGA |
| ELECTRICAL-Final | 2/1/2021 | Approved | JUAN VALENZUELA |
| Final | 2/1/2021 | Corrections Issued | JUAN VALENZUELA |
| PLUMBING-Final | 2/1/2021 | Approved | JUAN VALENZUELA |
| SGSOV-Seismic Gas S/O Valve | 2/1/2021 | SGSOV Not Ready | JUAN VALENZUELA |
| Smoke Detectors | 2/1/2021 | Approved | JUAN VALENZUELA |
| Final | 2/17/2021 | Permit Finaled | JUAN VALENZUELA |
| SGSOV-Seismic Gas S/O Valve | 2/17/2021 | SGSOV Approved | JUAN VALENZUELA |